Loading...
Asphalt Overlay Access Ramp Project #4 Acceptance Copyright 2014 City of Dubuque Consent Items # 14. ITEM TITLE: Asphalt Overlay Access Ramp Project#4 Acceptance SUMMARY: City Manager recommending acceptance of the public improvement construction contract and authorization of payment to Midwest Concrete, Inc. for the 2015 Asphalt Overlay Access Ramp Project Four. RESOLUTION Accepting the 2015 Asphalt Overlay Access Ramp Project Four and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type 2015 Asphalt Overlay Access Ramp Project Four-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2015 Asphalt Overlay Access Ramp Project Four (CIP 30012277) DATE: February 25, 2016 City Engineer Gus Psihoyos recommends City Council acceptance of the public improvement construction contract and authorize payment of the contract amount of $81,934.10 to Midwest Concrete, Inc. forthe 2015 Asphalt Overlay Access Ramp Project Four. The increase of $23,719.10 in cost was due to the construction of ten additional ramps at street corners where no pedestrian access was available, thus opening up the area for all pedestrian traffic at the New Haven/University Avenue locations. The Arabian Trail area was added to avoid initiating another contract due to the time of the season and the contractor's availability to complete the work. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DUBi�.i�.meri•�caicni9 Masterpiece oil the Mississippi 71f17,21112 21113 TO: Michael C. Van Milligen, City Manager FROM: Gus ,Psiho osCit Engineer Y Y g SUBJECT: 2015 Asphalt Overlay Access Ramp Project Four (CIP 30012277) DATE: February 24, 2016 INTRODUCTION The enclosed resolutions provide for the acceptance of the public improvement construction contract for the 2015 Asphalt Overlay Access Ramp Project Four. BACKGROUND The 2015 Asphalt Overlay Access Ramp Project Four included the replacement of twenty (20) non-compliant access ramps and an additional 10 ramps for a total of thirty (30) directional ramps as per Public Right of Way Accessibilities Guidelines (PROWAG) specifications in conjunction with the Public Works Asphalt Overlay Program and involved the intersections of: • University Avenue and Gilliam Street— single ramp • University Avenue and Austin Street—two single ramps • University Avenue and Brown Street—two single ramps • University Avenue and Prysi Drive —two single ramps • University Avenue and Ethel Street -- two single ramps • New Haven Street and Prysi Drive — one double ramp and two single ramps • New Haven Street and Mineral Street—four single ramps • Mineral Street and Devon Drive — three single ramps • Arabian Trail and Buckskin Court —two single ramps • Arabian Trail and Palomino Court— one double ramp and two single ramps • Arabian Trail and Clydesdale Court—two single ramps • Arabian Trail and Carter Road — one single ramp • North Grandview and Cerro Drive — one single ramp DISCUSSION The 2015 Asphalt Overlay Access Ramp Project Four was completed by Midwest Concrete, Inc. of Peosta, Iowa in the final contract amount of $81,934.10. The increase of$23,719.10 in cost was due to construction of ten additional ramps at street corners where no pedestrian access was available, thus opening up the area for all pedestrian traffic at the New Haven / University Avenue locations. The Arabian Trail area was added to avoid initiating another contract due to the time of the season and the contractor's availability to complete the work. Due to the topography of the area; all sidewalks were installed to the maximum limits in an effort to achieve the proper slopes mandated by Public Right of Way Accessibilities Guidelines (PROWAG) standards. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $81,934.10 to Midwest Concrete, Inc., for the 2015 Asphalt Overlay Access Ramp Project Four. BUDGET IMPACT The project cost summary for the 2015 Asphalt Overlay Access Ramp Project Four is as follows: Award Final Construction Contract $58,215.00 $81,934.10 Contingency $5,821.50 0.00 Construction Engineering & Inspection $9,605.48 6,276.98 Total Project Cost $73,641.98 $88,211.08 The funding summary for the project is as follows: CIP Fund Description Fund Amount 30012277 Asphalt Overlay Project Curb Access Ramps $88,211.08 Total Project Funding $88,211.08 REQUESTED ACTION The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $81,934.10 to Midwest Concrete, Inc., for the 2015 Asphalt Overlay Access Ramp Project Four. Prepared By: Tom Kopp, Engineering Technician cc: Don Vogt, Public Works Director John Klostermann, Public Works Supervisor Jenny Larson, Budget Director Jon Dienst, Civil Engineer II 2 RESOLUTION NO. 59-16 ACCEPTING THE 2015 ASPHALT OVERLAY ACCESS RAMP PROJECT FOUR AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2015 Asphalt Overlay Access Ramp Project Four (the Project) has been completed by the Contractor, Midwest Concrete, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $81,934.10; WHEREAS, the Contractor has previously been paid $77,837.40, leaving a balance of $4,096.70; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $4,096.70 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 7th day of March, 2016. Attest: Kevin S. Firnstahl, C C City Clerk Roy D. Vol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2015 ASPHALT OVERLAY ACCESS RAMP PROJECT FOUR The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2015 Asphalt Overlay Access Ramp Project Four, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $88,211.08. Dated thi day of Filed in the office of the City Clerk on the Gus Psihoyos, City Engineer