Catfish Creek Interceptor Sewer Repair Project Award Copyright 2014 City of Dubuque Consent Items # 15. ITEM TITLE: Catfish Creek Interceptor Sewer Repair Project Award SUMMARY: City Manager recommending that the award for the Catfish Creek Interceptor Sewer Repair Project to Top Grade Excavating, Inc., be officially recorded in the minutes of the City Council. SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Make Matter of Record ATTACHMENTS: Description Type Catfish Creek Interceptor Sewer Repair Project-MVM City Manager Memo Memo Staff Memo Staff Memo Location Map Supporting Documentation THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Catfish Creek Interceptor Sewer Repair Project (CIP 7102607) DATE: February 24, 2016 Through the competitive quotation process for public improvements, the Catfish Creek Interceptor Sewer Repair Project was awarded on February 18, 2016, to Top Grade Excavating, Inc., in the amount of$159,000, which was 22.3% over the engineer's estimate of probable cost of$130,000. The increase in cost between the estimate and the final quote is due to the degree of difficulty associated with the project as it traverses a creek and uneven terrains. City Engineer Gus Psihoyos recommends that the award for the Catfish Creek Interceptor Sewer Repair Project be officially recorded in the minutes of the City Council. I concur with the recommendation and respectfully request Mayor and City Council approval. Micliael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DubU LW `_ f33�i3 � .� AN-America City DUB E Masterpiece on the Mississippi 2007,2012,2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: February 22, 2016 SUBJECT: Catfish Creek Interceptor Sewer Repair Project (CIP 7102607) INTRODUCTION The Catfish Creek Interceptor Sewer Repair Project will replace an estimated 287 feet of 18 inch and 24 inch diameter sanitary sewer located in the vicinity of Old Mill Road and Rockdale Road. The pipe will be replaced with 30 inch diameter PVC which will be encased in concrete where it crosses the creek. The project also includes replacement of two manholes directly upstream and downstream of the pipe replacement along with repairs necessary to several other manholes along the Catfish Creek Interceptor Sewer line. The attached location map shows the section of pipe to be replaced crossing Catfish Creek, north of the Rockdale Road Bridge. BACKGROUND In November 2014, the City approved an inspection and engineering services contract with Redzone Robotics, Inc. of Pittsburg, Pennsylvania. The project was initiated following the significant rain events that occurred on June 19th and June 30th, 2014 which resulted in several sanitary sewer overflows to the creek. As the interceptor became inundated with flood waters, the Catfish Creek Lift Station operated at maximum pumping capacity for several weeks following the rain event, which can lead to premature wear and tear on the lift station pumps. Redzone completed the inspection of 30 manholes and over 7,400 feet of sewer main using sonar, laser, and televising equipment. The reports from Redzone clearly identified sections of the interceptor where flow is restricted due to heavy debris and in one location the restriction is the result of an undersized section pipe. The report along with visual inspections by engineering and public works department staff also identified several manholes in need of immediate repair and possible replacement. The improvements were summarized in the FY2016 budget under CIP 7102606, Catfish Creek Interceptor Sewer — Granger Creek Interceptor Sewer and Catfish Force Main & Lift Station Improvements. The Catfish Creek Interceptor Sewer Repair Project identified in the CIP, will replace the section of sewer that is undersized along with replacement and repair to several manholes examined during the 2014 inspections. Additional Catfish Creek Interceptor Sewer projects will be forthcoming under CIP 7102606 including continuation of the internal inspection project started by Redzone. F:\PROJECTS\Storm and Sanitary\Sanitary\Catfish Creek Improvements 7102607\Catfish Creek Interceptor Sewer Repair Project 2016-Award Memo.doc BUDGETIMPACT Through the competitive quotation process for public improvements, this project was awarded on February 18, 2016 to Top Grade Excavating, Inc. of Farley, Iowa, in the amount of$159,000.00. This amount is 22.3% above the estimate of probable cost of $130,000.00. The increase in cost between the estimate and final quote is due to the degree of difficulty associated with the project as it traverses a creek and uneven terrain. Such variability in cost is also reflected in the quotation results, as each contractor's method to complete the work differs greatly as they will need to manage creek flows, sanitary sewer flows, and the terrain. The following is a summary of the quotations received for the project: Quotation Contractor Results Top Grade Excavating, Inc. $ 159,000.00 McDermott Excavating $ 204,500.00 Tschiggfrie Excavating $ 379,000.00 Connolly Construction, Inc. $ 385,000.00 This project will be funded as follows: CIP No. Fund Description Fund - Amount 7102607 Catfish Creek Interceptor Sewer $250,000.00 Improvements In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it is necessary that the award for the Catfish Creek Interceptor Sewer Repair Project be officially recorded in the minutes of the City Council. cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street&Sewer Maintenance Supervisor Denise Ihrig, Environmental Engineer 2 THE CfrYOF Catfish Creek Sewer Main DAGI[s \; DLTB � puuqut aau as�cunnc inrca7enoa srsnn Masterpiece oil the Mississippi 1 Repair#3 Replace main with 30" PVC,Approx. 287 LF 24" RCP Replace upstream and downstream MH's i_ PCC pipe encasement at the creek crossing. \ " Replace MH 5572 1580 18" DIP encasedRepair#4 i in 30" Steel Pipe • 1572 Replace MH 1620 I under the tracks 1499y Replace MH, 1650 A K f F ' PCC Encasement ' �' •e `� r24" RCP '1 24" RCP "'tip• t 30" RCP Ro le 1711 1600 1699 1 77 Dubuque County-Assessor„City of_—.;..: DZSCLAIiA ER:Tin::u,tc,ma[icn mVdod sing the DULuque area Geopraphi<lnfarm anon System .AGISI,v,hich,dudes data created by both the City or Map Prepared by: Dubuque and Dubuque County.It is u,dlmteod that,while the City of Dubuque and pi rbdpating agencies utilized the City of Dubuque most current and a«urate Infarmagon available,DAGIS and 1 inch = 80 feet it',supplZmda na-b-ant the accuracy or ourrency of the Engineering Division infarrnanan or data tentainad herein.The City and panidpatlng 50 West 13th Street .gentles shell net be held hable for any direct,i'nh aot,Incidental, zequentlal,punitive,or special damages,whether maea fosble or Dubuque,Iowa 52001 nforeseeable,arising out of the authoritad ar bnaetnarized use of 100 50 0 100 Feet Phone:(563)589-4270 this data or the inability to use this data or aut et any breach of warrantywnacaeyer. Fax:(563)589-4205