Loading...
Heeb Street Retaining Wall Reconstruction Project-Public Hearing Copyright 2014 City of Dubuque Public Hearings # 7. ITEM TITLE: Heeb Street Retaining Wall Reconstruction Project SUMMARY: Proof of publication on notice of public hearing to consider approval of plans, specifications, form of contract and estimated cost for the Heeb Street Retaining Wall Reconstruction Project and the City Manager recommending approval. RESOLUTION Approval of plans, specifications, form of contract, and estimated cost for the Heeb Street Retaining Wall Reconstruction Project SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Heeb Street Retaining Wall Reconstruction Project- City Manager Memo MVM Memo Staff Memo Staff Memo Resolution Resolutions Proof of Publication on Notice of Public Hearing Supporting Documentation THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Heeb Street Retaining Wall Reconstruction Project CI P 3001029 — Heeb Street Wall CIP 3602481 — 18th Street Wall Recon. DATE: February 24, 2016 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and estimated cost of $242,543.45 for the Heeb Street Retaining Wall Reconstruction Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Micliael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DUB All AmedceCitY _E �I � r Masterpiece ott the Mississippi u,,,,2011-201.1 TO: Michael C. Van Milligen, City Manager FROM: Gus Cit,Psiho osEn Y Y Engineer ineer DATE: February 22, 2016 SUBJECT: Heeb Street Retaining Wall Reconstruction Project CIP 3001029 — Heeb Street Wall CIP 3602481 — 18th Street Wall Recon. INTRODUCTION The enclosed resolution is in reference to the public hearing for the Heeb Street Retaining Wall Reconstruction Project. BACKGROUND The Heeb Street Retaining Wall is located at the intersection of Clarke Drive and Heeb Street. This is an existing City-owned limestone retaining wall that is showing signs of distress. The wall height varies from 6 feet to 15 feet, with a wall length of 82 feet. The wall supports Heeb Street (a 25-foot wide street) which has an 8-inch sanitary sewer main in close proximity to the wall. The City Engineering Department monitored the wall for movement between 2012 — 2013. For precaution the City placed temporary concrete barriers (summer of 2012) on Heeb Street to protect pedestrians and vehicles. DISCUSSION Engineering is proposing that this project include wall reconstruction with native Dubuque limestone. In order to reconstruct the retaining wall, most of the street will need to be removed. Along with this work, the sanitary sewer utility will need to be monitored during construction. The street pavement section will be 7-inches of concrete and 25 feet in width. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process February 15, 2016 Publish Notice to Bidders, Advertise for Bids February 19, 2016 Notice of Public Hearing on Plans & Specifications February 19, 2016 Pre-Bid Construction Conference March 3, 2016 Public Hearing on Plans & Specifications March 7, 2016 Receipt of Bid Proposals (Bid-Letting) March 10, 2016 Award Construction Contract March 21, 2016 Project Completion Date October 28, 2016 RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and estimated cost for the Heeb Street Retaining Wall Reconstruction Project through the adoption of the enclosed resolution. BUDGET IMPACT The estimate of probable cost for the Heeb Street Retaining Wall Reconstruction Project is as follows: Estimate Construction Contract $191,733.95 Contingency (10%) 19,173.40 Construction Engineering & Inspection (15%) 31,636.10 Total Project Cost $242,543.45 The funding for the Heeb Street Retaining Wall Reconstruction Project will be as follows: CIP No. Fund Description Fund Amount 3001029 Heeb Street Wall $112,543.45 3602481 18th Street Wall Recon. $130,000.00 Total Project Funding $242.543.45 ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and estimated cost for the Heeb Street Retaining Wall Reconstruction Project through the adoption of the enclosed resolution. cc: Jenny Larson, Budget Director Don Vogt, Public Works Director Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer Jon Dienst, Civil Engineer 11 RESOLUTION NO. 69-16 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE HEEB STREET RETAINING WALL RECONSTRUCTION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Heeb Street Retaining Wall Reconstruction Project., in the estimated amount $242,543:45, are hereby approved. Passed, adopted and approved this 7th day of March, 2016. Attest: Kevin Firnstahl, C C, City Clerk oy D. Buol, Mayor 9 STATE OF IOWA {SS: DUBUQUE COUNTY z, 4 I CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: February 19, 2016, and for which the charge is $82.08. it '1 V t u i! Subscribed to before me, a Not�ry Public in and for Dubuque County, Iowa, II this a day o . —, 20 /4 Notary Public in and for ubuque County, Iowa. 4 0 'ommkzsion 3 I nn" l 4� 4 I acceptable to the" governmental entity,, taining wall and for thg.•faitbful perfor- I mance of the contract, CITY OF DUBUQUE, concrete tteoad ments in an amount equal to IOWA` one hundred percent of OFFICIAL NOTICE regarding the above the amount of the i NOTICE OF PUBLIC public hearings maybe ' contract: The Bid se- HEARING ON PLANS, submitted to the City curity must be in the SPECIFICATIONS, Clerk's Office on or amount of ten percent FORM OF CONTRACT,! before said time of (100/6)of the amount of AND ESTIMATED public hearing at 50 W. he contract and must: COST FOR THE,HEEB 13th Street,or ctyclerk the e co the form.of a STREET RETAINING Ccityofdubuque.org. E Any visual or hearing cashier's: check or WALT CE IS'T certified check drawn'< NOTICE 7S' HEREBY impaired persons need-: GIVEN: The City, of or federally chartered on a state-chartered or special, cil <of the. Cityy of or persons with special bank, or a certified' Dubuque Iowa will accessibility needs q share draft drawn fed_ a hold'a public hearing should contact the City state-chartered or fed- on the proposed plans,I Clerk's office at (563) ' erally chartered credit specifications,form ,of 589-4120 or TDD ,at union, or the Bidder contract and estimated (563) 690-6678 at least may provide a Bid cost for the Heeb j 48 hours prior to;the Bond with corporate 'Street- Retaining Wall meeting. surety satisfactory to Project in accordance Published by order of ,the governmental 1 with the provisions of the City Council given th&ent , The Bid Bond Chapter 26, Code of on the 15th day of must contain no Iowa,at 6:30 p.m., on February,2016. conditions except as the 7th day of March, Kevin S.Firnstahl,, provided in this 2016, in the Historic CMC,City Clerk section. Federal 9 Buildin Coun- It 2/19 120.5 Contract Docu- cil Chambers ;(second NOTICETI O BIDDERS01)0ments floor);;350 West 6th SECTION 00120 Copies of the Contract Street;Dubu ue;Iowa. CITY OF DUBUQUE Said proposed plans, PUBLICDocuments may: be ,specifications, form of IMPROVEMENT I obtained at• the contract and estimated '-PROJECT i Engineering -Depart, cost are now on file in Heeb Street SeCity Hall - the office of the City Retaining Wall Secoo nd Floor, u West, 13th Street, Dubuque, Clerksaid hearing Time and Place s I Iowa 52001. The. any interested I for rested person for Filing I Sealed Con- tract Documents will may :appear and file Proposals also be available on the objections thereto. Sealed Bids for the City's website at j The scope of the work comprising each 'I viww.ciYywebsit que.at Project is as follows: improvement as stated '' www. itybf.""No plan or Reconstruction of below must be filed g/biddepositit.required. existing limestone re- ' before' 2:00 p.m. on Special- fired. .n ---- March 10th,2016 in the Note: Contractor(s) or- City of the City Clerk, subcontractorfs) will City Hall - first Floor, be required to be Iowa 50 West 13th Street, Department of 'Trans j Dubuque,Iowa. portation pre-qualified 120.2. Time 'and Placed Sealed Pro- to complete PC con- posalWill. btrete paving work. Opened and Con--pene ' ` 120.6 Preference for OIowa Products. and s�Sealed-proposals will Labor pective bidders.is not be opened and Bids By virtue of statutory mandatory but highly tabulated at 2i00p'.m. authority, preference recommended. - on March 10th,2016,at will be given to• 120.10 ;Title VI City Hall - Conference products and provi- Discrimination Clause Room A, 50 West 13th sions grown and coal The City.of Dubuque Street,Dubuque, Iowa, produced within the in accordance with for consideration by ', State of Iowa, and to Title VI of the Civil the City Council at its 'I Iowa domestic labor,to Rights Act of 1964, 78 meeting on March-21st, -', the 'extent lawfully Stat. 252, 42 U.S.C. j 2016. 6The City of required under Iowa 2000d-2000d-4 and Title Dubuque, Iowa, re- statutes. 49, Code of Federal Depart- serves the right to 120.7 Sales Tax Regulations, Depart- rejectany and all Bids. The Bidder should not ment of "Transpor- 120.3 Time for.Com- include State of�.lowa tation, Subtitle A, ,I mencement and sales tax in its,Bid,�A Office of the Secretary, Completion of Work sales -:tax exemption Part 21, :Nondiscrimin- :Project certificate will 'be ation in , Federally Work on the must' be commenced available for` all assisted programs of within ten (10)`'calen- material purchased in the Department of dar days after the Iowa for incorporation Transportation :issued Notice to Proceed has into the Project. pursuant to such Act, been issued and shall 1 120.8 General Nature hereby ;notifies all be,fully completed by of Public Improve- bidders 'that it !will October 28th, 2016. ment Project affirmatively insure j Once the Contractor Heeb Street Retaining that in any contract mobilizes onto the Wall Project CIP # entered into pursuant Project he will be I 300IReconstruction t of minority advertisement, business en-- required to complete the work in a timely, existing limestone re terprises will be taining wall and afforded full oppor- manner. concrete roadway. tunity to submit bids in 120.4,61d Security 120.9'' Pre-Bid` Con- response to this Each Bidder must struction Conference inf accompany its uBid with vitation and will not Each prospective be ) discriminated se curity that thhee Bid security bidder is encouraged against on the n rounds se successful Bidder'will to attend the Pre-Bid i' of race, color, national enter into a contract Construction . Confer-i origin, sex, age, or I for d uon ence to be held at 10:00 11 disability ,in consid&- andthwilWfurnB�h after " AM on March 3rd,2016, ation for an award. the award of contract a at City ;Hall, Confer- Published in the corporate surety"Bond, ence Room A in Telegraph Herald on P Dubuque, Iowa. Atten- February 19th,2016 dance by ally"pros- ,1t 2/19 4