Signed Contract_Upper Bee Branch Channel/Utilities Change Order #6_Portzen THE COF Dubuque DtUB E A"-AmedeaC'ry 11 1 ► Masterpiece on the Mississippi 2007.2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Steve Sampson Brown, Project Manager SUBJECT: Upper Bee Branch Creek - Channel, Streets, & Utilities Project Portzen Construction, Inc. — Change Order No. 6 DATE: March 9, 2016 Attached is Change Order No. 6 for the May 21, 2015 agreement between Portzen Construction and the City of Dubuque for the Upper Bee Branch Creek - Channel, Streets, & Utilities Project. Change Order No. 6 provides for a contract increase of$156,726.00. This change results from adding an additional length of Kniest St. stone arch removal that was not discovered until after construction work started, modifications to the low flow channel blocks at the Garfield Ave. inlet to eliminate potential for settlement, design changes to the spillway aeration feature to improve performance, and other minor modifications to the project including extra backfill materials to address unsuitable soil conditions, installing a temporary public parking lot at Washington and 24th Streets, and minor changes to storm, sanitary and water utilities. This change order will be paid by the contingency funds of the Bee Branch Creek Capital Improvement Project (720-1564). Including the amount of this change order, the total contingency spending related to change orders on this project is a net decrease of $19,796.00 from the original contract amount. ACTION TO BE TAKEN The execution of Change Order No. 6 of the Portzen Construction, Inc. contract is requested. cc: Gus Psihoyos, City Engineer Deron Muehring, Civil Engineer Alexis Steger, Sr. Budget Analyst Attachments Page 1 of 1 Strand Associates, Inc° e910 West Wingra Drive Madison,WI 53715 ® (P)608-251-4843 STRAND (F)608-251-8655 ASSOCIATESo February 15, 2016 CHANGE ORDER NO. 6 PROJECT: Upper Bee Branch Creek—Channel, Streets, and Utilities OWNER: City of Dubuque CONTRACT: 1-2015 CONTRACTOR: Portzen Construction, Inc. Description of Change 6a Change Bid Item No. 275—Remove/Dispose Existing ADD $40,965.00 Kniest Street Culvert, unit cost of$76,500 to $117,465 for the removal of the additional 585 lineal feet of Kniest Street culvert discovered during construction according to CPR 8. 6b Add Bid Item No. 359-3/4-Inch Clean Stone—Low Flow ADD $29,568.00 Channel Walls Base and Backfill, quantity of 1100, unit of T, and unit cost of$26.88 in accordance with the attached revised typical section C400 according to CPR 15. 6c Add Bid Item No. 360-1-inch Drainage Aggregate— ADD $5,376.00 Segmental Retaining Walls F, G,1, K, L, O,P, Q, S Undercut Backfill, quantity of 200, unit of T, and unit cost of$26.88 for the additional drainage aggregate required for replacement of unsuitable soils adjacent to the segmental retaining walls according to CPR 15. 6d Add Bid Item No. 361—Clay Wedge at Existing Bee ADD $3,333.00 Branch, quantity of 1, unit of LS, and unit cost of$3,333 for the verification of the existing Bee Branch conditions and installation of the clay wedge according to CPR 7. 6e Add Bid Item No. 362-6-inch PVC Check Valve, quantity ADD $986.00 of 1, unit of EA, and unit cost of$986, for the installation of the check valve outside of MH-W5 according to CPR 15. 6f Add Bid Item No. 363-4-Foot-Diameter Reclaimed Water ADD $11,000.00 Line Manhole, quantity of 1, unit of EA, and unit cost of $11,000, for the installation of MH-W5 and lowering of the aeration water line under the existing 20-inch water main according to CPR 15. EDV:plh\S:\MAD\I 100--1199\1154\049\W/rd\1-2015\Change Orders\CO6\CO6 Revised.doex Arizona I Illinois I Indiana I Kentucky I Ohio I Texas I Wisconsin www.strand.com Strand Associates, Inc: City of Dubuque—Portzen Construction,Inc. Contract 1-2015, Change Order No. 6 Page 2 February 15, 2016 6g Add Bid Item No. 364-7-Foot-Diameter Spillway ADD $14,730.00 Aeration Structure, quantity of 1, unit of EA, and unit cost of$14,730 for the Spillway Aeration Structure A-3 including all interior piping and other components according to CPR 15. 6h Add Bid Item No. 365-24-Inch Ductile Iron Aeration ADD $18,690.00 Piping with Wrap, quantity of 70, unit of LF, and unit cost of$267 according to CPR 15. 6i Add Bid Item No. 366-24-Inch Aeration Piping Butterfly ADD $13,288.00 Valve with Road Box and Valve Adaptor, quantity of 2, unit of EA, and unit cost of$6,644 according to CPR 15. 6j Add Bid Item No. 367-4-Inch Ductile Iron Drain Piping, ADD $477.00 quantity of 9, unit of LF, and unit cost of$53 for exterior drain piping between the spillway pump station wet well and valve manhole according to CPR 15. 6k Add Bid Item No. 368—Buddy's Temporary Parking, ADD $2,970.00 quantity of 1, unit of LS, and a unit cost of$2,970 for the removal of topsoil and installation of temporary parking signs according to the enclosed drawing and according to CPR 15. Temporary asphalt millings, concrete driveway apron, and temporary fencing to be paid according to the unit prices bid. 61 Add Bid Item No. 369—Lincoln Sanitary Sewer ADD $6,440.00 Modifications, quantity of 1, unit of LS, and a unit cost of $6,440 for removing and reinstalling the 18-inch drop, core drilling and providing new pipe boots, plugging the upper drop in MH 1.14, and plugging the existing sewer lateral at 516 Lincoln related to changes in the contract drawings according to WCD No. 8. 6m Add Bid Item No. 370—Segmental Retaining Walls F, G, I, ADD $1,903.00 K, L, O, P, Q, S Redesign, quantity of 1, unit of LS, and a unit cost of$1,903 for revising retaining wall drawings related to changes in the contract drawings from WCD No. 7. EDV:plli\S:\MAD\1100--1199\1154\049\Wrd\1-2015\Change Orders\COMC06 Revised.docx www.strand.com Strand Associates, Inc. City of Dubuque—Portzen Construction,Inc. Contract 1-2015, Change Order No. 6 Page 3 February 15, 2016 6n Change Bid Item No. 81"8-Inch Reinforced Concrete ADD $7,000.00 Channel—Low Flow Channel Storm Sewer Aprons (Cone. Slab), quantity of 600, unit of SF, and unit cost of$15"to "Storm Sewer Outfall—Channel Scour Apron, quantity of 2, unit of EA, and unit cost of$8,000 for the 12-inch concrete pad and 8-inch limestone scour slabs according to WCD No. 10. TOTAL VALUE OF THIS CHANGE ORDER: ADD $156,726.00 Contract Price Adjustment Original Contract Price $27,819,266.00 Previous Change Order Adjustments ($176,521.40) Adjustment in Contract Price this Change Order $156,726.00 Current Contract Price including this Change Order $27,799,470.60 Contract Completion Date Adjustment Original Contract Completion Date September 1,2017 Contract Completion Date Adjustments due to previous Change Orders No Change Contract Completion Date Adjustments due to this Change Order No Change Current Contract Completion Dates including all Change Orders September 1,2017 This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED ENGINEER—Strand Associates, Inc.® Date APPROVED z/i6�i� CONTRACTOR—Portz Construction,Inc. Date APPROVED 2 OWNER—City of Dubuque Date EDV:plh\S:\MAD\l 100--1199\l 154\049\Wrd\I-2015\Change Orders\C06\C06 Revised.doex www.strand.com THE CITY OF Dubuque E i-Mierlcacn' I � Masterpiece on the Mississippi 2007.2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Steve Sampson Brown, Project Manager .,'�Z*/2�� SUBJECT: Upper Bee Branch Creek - Channel, Streets, & Utilities Project Portzen Construction, Inc. — Change Order No. 7 DATE: March 9, 2016 Attached is Change Order No. 7 for the May 21, 2015 agreement between Portzen Construction and the City of Dubuque for the Upper Bee Branch Creek - Channel, Streets, & Utilities Project. Change Order No. 7 provides for a contract increase of$48,076.00. This change results from costs associated with deconstruction of the brick duplex home at 321 E. 22nd Street and other minor modifications to the project including resequencing of Rhomberg Ave. bridge work to avoid delays associated with needing to work around a suspended phone company cable, relocation of a water service line at 24th Street and minor changes to a stormwater catch basin. This change order will be paid by the contingency funds of the Bee Branch Creek Capital Improvement Project (720-1564). Including the amount of this change order, the total contingency spending related to change orders on this project is a net increase of $28,280.00 from the original contract amount. ACTION TO BE TAKEN The execution of Change Order No. 7 of the Portzen Construction, Inc. contract is requested. cc: Gus Psihoyos, City Engineer Deron Muehring, Civil Engineer Alexis Steger, Sr. Budget Analyst Attachments Page 1 of 1 Strand Associates, Inc° ® 910 West Wingra Drive Madison,WI 53715 (P)608-251-4843 STRAND (F)608-251-8655 ASSOCIATES® February 15, 2016 CHANGE ORDER NO. 7 PROJECT: Upper Bee Branch Creek—Channel, Streets, and Utilities OWNER: City of Dubuque CONTRACT: 1-2015 CONTRACTOR: Portzen Construction, Inc. Description of Change 7a Add Bid Item No. 371-321 East 22nd Street Demolition, ADD $34,375.00 quantity of 1, unit of LS, and unit cost of$34,375 for the demolition of the 321 East 22nd Street building according to CPR 13. The Work excludes asbestos inspection and abatement. Additionally, all foundation stone and brick shall be salvaged and reused as recycled backfill and be paid under bid item No. 351—Recycled Granular Backfill. Salvaged brick shall only be backfilled in areas approved by Owner. All other equipment, work, materials, labor, and disposal of materials at the Dubuque County Landfill shall be included in the unit price bid. 7b Add Bid Item No. 372—Crane Lift Rental for Fiber-Optic ADD $3,565.00 Cable Suspension, quantity of 1, unit of LS, and unit cost of$3,565 according to CPR 14 for a utility relocation. 7c Add Bid Item No. 373—Morrison Bros. Interior Water ADD $9,640.00 Main, Pipe Encasement, and Concrete Slab Removal/ Replacement, quantity of 1, unit of LS, and a unit cost of $9,640 for additional work shown on the revised C200 detail enclosed according to CPR 15 for the relocation of the water service. 7d Add Bid Item No. 374—Repair Intake on 22nd Street, ADD $496.00 quantity of 1, unit of LS, and unit cost of$496 for the repair of the intake on 22nd Street according to CPR 9. TOTAL VALUE OF THIS CHANGE ORDER: ADD $48,076.00 EDV:pIh\S:\MAD\l 100--1199\1154\049\Wrd\1-2015\Change Orders\CO7\CO7.docx Arizona I Illinois I Indiana I Kentucky I Ohio I Texas I Wisconsin www.strand.com Strand Associates, Inc' City of Dubuque—Portzen Construction,Inc. Contract 1-2015, Change Order No. 7 Page 2 February 15, 2016 Contract Price Adjustment Original Contract Price $27,819,266.00 Previous Change Order Adjustments ($19,795.40) Adjustment in Contract Price this Change Order $48,076.00 Current Contract Price including this Change Order $27,847,546.60 Contract Completion Date Adjustment Original Contract Completion Date September 1, 2017 Contract Completion Date Adjustments due to previous Change Orders No Change Contract Completion Date Adjustments due to this Change Order No Change Current Contract Completion Dates including all Change Orders September 1, 2017 This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED w II ENGINEER—Strand Associates, Inc.® Date APPROVED Z /G//6 CONTRACTOR—Portze Construction,Inc. Date APPROVED 31qll _ OWNER—City of Dub que Dat EDV:pIh\S:\MAD\1100--1199\1154\049\Wrd\1-2015\Change Orders\CO7\CO7.docx www.strand.com THE CITY OF Dubuque DUB E AD-AmericaI c i 13 Masterpiece on the Mississippi 2007.2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Steve Sampson Brown, Project Manager SUBJECT: Upper Bee Branch Creek - Channel, Streets, & Utilities Project Portzen Construction, Inc. — Change Order No. 8 DATE: March 9, 2016 Attached is Change Order No. 8 for the May 21, 2015 agreement between Portzen Construction and the City of Dubuque for the Upper Bee Branch Creek - Channel, Streets, & Utilities Project. Change Order No. 8 provides for a contract increase of $31,635.55. This change results from costs associated with changing the light poles from 21' to 25' tall to match the poles installed in the Historic Millwork District, adding additional drainage aggregate materials at the retaining walls per recommendation from the geotechnical engineer, adding 75 feet of chain link fence, minor revisions to the project's retaining walls to accommodate changes to the channel slope grades and upgrading the rubber surface in the slide area so that an extended warranty is provided. This change order will be paid by the contingency funds of the Bee Branch Creek Capital Improvement Project (720-1564). Including the amount of this change order, the total contingency spending related to change orders on this project is a net increase of $59,916.15 from the original contract amount. ACTION TO BE TAKEN The execution of Change Order No. 8 of the Portzen Construction, Inc. contract is requested. cc: Gus Psihoyos, City Engineer Deron Muehring, Civil Engineer Alexis Steger, Sr. Budget Analyst Attachments Page 1 of 1 Strand Associates, Inch ® 910 West Wingra Drive Madison,WI 53715 - (P)608-251-4843 STRAND (F)608-251-8655 ASSOCIATESo February 15, 2016 CHANGE ORDER NO. 8 PROJECT: Upper Bee Branch Creek—Channel, Streets, and Utilities OWNER: City of Dubuque CONTRACT: 1-2015 CONTRACTOR: Portzen Construction,Inc. Description of Change 8a Change Bid Item No. 283—Fixture Type D and Pole Base, ADD $16,380.00 unit cost of$7,500 to$8,592 for providing 25-foot-tall light poles in lieu of 21-foot-tall light poles according to CPR 10. 8b Add Bid Item No. 375-1-Inch Drainage Aggregate— ADD $5,376.00 Segmental Retaining Walls A,B, C, D,E, H, J,M,N, R Undercut Backfill, quantity of 200, unit of T, and unit cost of$26.88 for the additional drainage aggregate required for replacement of unsuitable soils adjacent to the segmental retaining walls according to CPR 15. 8c Add Bid Item No. 376—Flowable Fill—Segmental Retaining ADD $5,872.50 Wall A and Morrison Bros., quantity of 40.5, unit of CY, and unit cost of$145 for the use of flowable fill underneath the segmental retaining walls near the inlet structure and for the Morrison Bros. water service according to the enclosed drawings and according to CPR 15. 8d Change Bid Item No. 117—Poured In Place Rubber Surface, ADD $424.05 unit cost of$17.00 to $17.55 for the selection of the aliphatic binder over the aromatic binder per CPR 14. 8e Add Bid Item No. 377—A-1 Fence Replacement, quantity ADD $1,680.00 of 1, unit of LS, and unit cost of$1,680 for the replacement of the fence on A-1 property according to the enclosed revised drawing and according to CPR 15. 8f Add Bid Item No. 378—Segmental Retaining Walls A, B, ADD $1,903.00 C, D, E, H, J, M,N, R Redesign, quantity of 1, unit of LS, and a unit cost of$1,903 for revising retaining wall drawings related to changes in the contract drawings from WCD No. 7. TOTAL VALUE OF THIS CHANGE ORDER: ADD $31,635.55 EDV:pIh\5:\MAD\1100--1199\1154\049\Wrd\1-2015\Change 0rders\C08\C08.docx Arizona I Illinois I Indiana I Kentucky I Ohio I Texas I Wisconsin www.strand.com Strand Associates, Inc° City of Dubuque—Portzen Construction,Inc. Contract 1-2015, Change Order No. 8 Page 2 February 15, 2016 Contract Price Adjustment Original Contract Price $27,819,266.00 Previous Change Order Adjustments $28,280.60 Adjustment in Contract Price this Change Order $31,635.55 Current Contract Price including this Change Order $27,879,182.15 Contract Completion Date Adjustment Original Contract Completion Date September 1,2017 Contract Completion Date Adjustments due to previous Change Orders No Change Contract Completion Date Adjustments due to this Change Order No Change Current Contract Completion Dates including all Change Orders September 1,2017 This document shall become a supplement to the Contract and all provisions will apply hereto. RECOMMENDED / ENGINEER—Strand Associates, Inc.® Date APPROVED 4&< 2116116 CONTRACTOR—Port Construction,Inc. Date APPROVE2 D e�7� .-�A 1 OWNER—City of Dub ue Dat EDV:pIh\S:\MAD\1100--1199\1154\049\Wrd\I-2015\Change Orders\CO8\CO8.docx www.strand.com