Jackson St Storm Sewer FinalMEMORANDUM March 11, 2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Jackson Street Relief Storm Sewer Project Acceptance Public Works Director Mike Koch is recommending acceptance of the Jackson Street Relief Storm Sewer Project, as completed by Portzen Construction, in the final contract amount of $288,472.48. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director TO: CITY OF DUBUQUE, IOWA MEMORANDUM March 11, 2002 Michael C. Van Milligen, City Manager FROM: Michael A. Koch, Public Works Director SUBJECT: Jackson Street Relief Storm Sewer Project Acceptance INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Jackson Street Relief Storm Sewer Project. DISCUSSION Work has been completed on the project by Portzen Construction, Dubuque, Iowa, in the final contract amount of $288,472.48. When a project goes out for bid, the quantity of materials to be used is often estimated. This is because the soil conditions vary from site to site. Table 1 outlines the costs associated with bid item over-runs. Table 1. Storm Sewer Construction Bid Quantity Over-Runs Cost Bid Item Explanation of Extra Over-Run Civil Engineer Deron Muehring made an error when $22,000 putting the bid document together. The actual length 42" RCP of 42" RCP required was 300 feet more than the bid quantity. This was discovered at the time of the bid- letting. Adding the additional pipe did not change the outcome of the bids. 6' Diameter MH The alignment of the proposed storm sewer was $4,000 modified. The adjusted alignment was made to avoid an existing gas main. Bedding Stone, Bedding stone used is over the estimated quantity. $3,800 1" Clean The bid quantity for bedding, limestone backfill, and rolled stone base are only an estimate and can vary depending on the soil conditions prevalent where the storm sewer is being placed. Limestone The bid quantity for bedding, limestone backfill, and $7,400 Backfill rolled stone base are only an estimate and can vary depending on the soil conditions prevalent where the j storm sewer is being placed. 3/4" Rolled The bid quantity for bedding, limestone backfill, and $3,800 Stone Base rolled stone base are only an estimate and can vary depending on the soil conditions prevalent where the storm sewer is being placed. Total $40,000 From the outset of this project, it was understood that finding a place for a 42" storm sewer amongst the existing utilities would provide a significant challenge. To meet that challenge, the storm sewer alignment was modified and other utilities were relocated (watermain, gas main, sanitary sewer, and other storm sewers). As indicated in the correspondence to City Council regarding the award of the contract to Portzen Construction, utility relocation costs were unknown at the time of the letting of the contract because the exact location of the gas mains, water mains, sanitary sewers, and other storm sewers were unknown until field located. Table 2 outlines the costs associated with utility relocation. Table 2. Utility Relocation and Street Repair Work Performed Explanation Cost 3/4" Water All lead or copper water service lines in conflict with $21,300 Service the new storm sewer were replaced from the main to the stop box per City policy. Water Main The water main was moved in two locations to allow $5,100 Relocation the new storm sewer to pass through the 32nd and Jackson Street intersection. Sanitary Lateral The existing Dubuque Stamp and Amedcan Trust $4,000 Relocation sanitary sewer laterals were moved to pass the new storm sewer. Total $30,400 Another expense that exceeded cost estimates included in the bid documents was the repair of the existing street. Once the project started it was discovered that Jackson Street was once a concrete street and had since been overlaid with asphalt. In order to rebuild the street, a concrete patch was required that was not anticipated. Instead of replacing the asphalt pavement where the storm sewer trench was dug along Jackson Street, the entire street from 30th to 32nd Street was incorporated into this years asphalt portion of the Street Program. Table 3 illustrates the additional costs to the storm sewer project. Table 3. Street Related Work Work Performed Explanation Cost PCC Street Jackson Street was once a concrete street and had $34,900 Patch since been overlaid with asphalt. In order to rebuild the street a concrete patch was required. Asphalt All of the asphalt from 30th to 32th was removed as $6,200 Removal part of the asphalt resurfacing program. Total $41,1 O0 RECOMMENDATION I recommend that the City Council accept the improvements and the final contract to be established at $288,472.48. BUDGET IMPACT A summary of the budget costs is as follows: Estimate Bid Final Construction Contract $173,980.47 $158,222.33 $288,472.48 Contingency 17,398.05 17,398.05 0 Engineering 28,706.78 28,706.78 28,706.78 Total Project Cost $220,085.30 $204,327.16 $317,179.26 The project will be funded from the General Fund from a Fiscal Year 2001 appropriation of $231,000. Two storm sewer projects completed recently had substantial balances remaining. The $14,000 balance remaining from the completed Wilbricht Lane Storm Sewer Project and the $35,000 balance remaining from the completed Hamilton Street Storm Sewer Project will be applied towards the Jackson Street Storm Sewer Project. The balance of the funding will come from the General Storm Sewer Construction Fund. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvements and establishing the final construction cost. MAK/vjd Prepared by Deron Muehring, Civil Engineer cc: Pauline Joyce, Administrative Services Manager Gus Psihoyos, Assistant City Engineer RESOLUTION NO.153-02 ACCEPTING IMPROVEMENT Whereas, the contract for the Jackson Street Relief Storm Sewer Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the General Storm Construction Fund in amount equal to the amount of this contract, less any retained percentage provided for therein. Passed, approved and adopted this 18th day of March ., 2002. Terrance M. Duggan Attest: Jeanne F. Schneider, CMC,-City Clerk RESOLUTION NO. 154-02 FINAL ESTIMATE Whereas, the contract for the Jackson Street Relief Storm Sewer Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $317,179.26 and the said amount shall be paid from the General Storm Sewer Construction Fund of the City of Dubuque, iowa. Passed, approved and adopted this 18th day of March, 2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk March ,2002. or FINAL ESTIMATE FOR: City of Dubuque ENGINEERING DIVISION Jackson Street Relief Storm Sewer ITEM QTY. UNIT 42" RCP 1430.00 LF Intake 104-B, Complete (CB-l) 1.00 EA Intake (Neenah R-4999-L6) 1.00 Lump 6'Dia. MH Base 5.00 EA 6' Dia. MH Sidewall 35.49 LF 6' Dia. MH Flat Top 5.00 EA Manhole Frame & Cover (Neenah R-1642-A) 5.00 EA Manhole Frame (Neenah R-1642-A) & Cover (Neenah R-2501) 1.00 EA Junction Box#l, Complete 1.00 Lump install 4' of 15" RCP & 4' of 18" RCP (Pipe Supplied by City) 1.00 Lump Bedding Stone, 1" Clean 1010.19 Ton Limestone Backfill 2876.88 Ton 3/4" Rolled Stone Base 1337.94 Ton 5" ACC Street Patch w/Full Depth Saw Cut 280.79 Ton 8" PCC Street (Remove & Replace) 89.49 SY Sodding 544.00 SY 4" PC Sidewalk 803.00 SF PC Curb & Gutter (Remove & Replaca) 142.50 LF Replace Landscape between Junction BoxY1 & CB-2 1.00 Lump Traffic Contrel 1.00 Lump Extra Work Performed 8" PCC Patch 57.00 CY 6" PCC Patch 191.25 CY 3/4" Water Service 507.00 LF 2" Insulation Board 3.00 Each Remove & Replace Fire Hydrant 1.00 Lump Relocate Water Main on Jackson St. 1.00 Lump Relocate Water Main on Peru Rd. 1.00 Lump Relocate American Trust Sanitary Lateral 1.00 Lump Relocate Dubuque Stamp Storm Sewer 1.00 Lump Relocate Dubuque Stamp Sanitary Sewer 1.00 Lump Concrete Pipe Restocking Fee 1.00 Lump Storm Sewer Junction Box 1.00 Lump 101-B, Complete 1.00 Lump Traffic Loop installation 5.00 Each TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST I hereby ceffify that the above statement shows in detail the correct amount of ail work required to complete the above improvement. APPROVED: Michael Van Milligen, City Manager City of Dubuque,Iowa The undersigned, , contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for ali ~s_ fo~said impr.~7~ement. DATE: March 7, 2002 UNIT COST TOTAL COST $74.07 $105,920.10 $1,750.00 $1,750.00 $9,870.00 $9,870.00 $425.00 $2,125.00 $208.45 $7,397.89 $435.00 $2,175.00 $245.00 $1,225.00 $265.00 $265.00 $2,225.00 $2,225.00 $240.00 $240.00 $8.86 $8,950.28 $5.38 $15,477.61 $8.64 $11,559.80 $87~05 $24,442.77 $45.00 $4,027.05 $14.25 $7,752.00 $3.75 $3,011.25 $22.00 $3,135.00 $450.00 $450.00 $5,400.00 $5,400.00 $125.00 $7,125.00 $145.00 $27,731.25 $42.00 $21,294.00 $40.00 $120.00 $339.00 $339.00 $2,475.19 $2,475.19 $2,242.04 $2,242.04 $1,940.54 $1,940.54 $696.90 $696.90 $1,888.57 $1,888.57 $146.28 $146.28 $1,599.96 $1,599.96 $875.00 $875.00 $520.00 $2,600.00 $288,472.48 $28,706.78 $317,179.26 Public Works Director