Loading...
Bee Branch Creek Restoration Project Update 5 2 16Copyright 2014 City of Dubuque Action Items # 3. ITEM TITLE: Bee Branch Creek Restoration Project Update SUMMARY: City staff will make a presentation to the City Council to provide a status update of the multi -phase Bee Branch Watershed Flood Mitigation Project in preparation for the May 9, 2016 walking tour of the project. SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Presentation ATTACHMENTS: Description Type Bee Branch Watershed Project Update -MVM Memo City Manager Memo Staff Memo Staff Memo THE CITY OF Dui Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Bee Branch Watershed Flood Mitigation Project Update DATE: April 26, 2016 Dubuque band AI -America City r 2007 • 2012 • 2013 City Engineer Gus Psihoyos is requesting an opportunity to make a presentation to the City Council to provide a status update of the multi -phase Bee Branch Watershed Flood Mitigation Project in preparation for the May 9, 2016, walking tour of the project. I concur with the recommendation and respectfully request Mayor and City Council approval. ,G Mich el C. Van Milligen MCVM:sv Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dui Masterpiece on the Mississippi TO: FROM: DATE: SUBJECT: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer _ April 26, 2016 Bee Branch Watershed Flood Mitigation Project Update Dubuque bitanl C 1 11Ir 2007 • 2012 • 2013 INTRODUCTION The purpose of this memorandum is to request the opportunity to make a presentation to the City Council in order to provide an update on the various phases of the Bee Branch Watershed Flood Mitigation Project. BACKGROUND On November 18, 2013 the City Council passed Resolution 335-13 adopting the 2013 Drainage Basin Master Plan Amendment. The amended Drainage Basin Master Plan outlined several improvements throughout the Bee Branch watershed to mitigate the effects of future flooding and disasters. Collectively, the improvements form the basis of the Bee Branch Watershed Flood Mitigation Project outlined in Table 1 below. Table 1. Phases of the Bee Branch Watershed Flood Mitigation Project Phase Description 1 Carter Road Detention Basin 2 West 32nd Street Detention Basin 3 Historic Millwork District 4 Lower Bee Branch Creek Restoration 5 Flood Mitigation Gate Replacement 6 Impervious Surface Reduction (Green Alleys) 7 Upper Bee Branch Creek Restoration 8 22nd Street Storm Sewer Improvements 9 Flood Mitigation Maintenance Facility 10 North End Storm Sewer Improvements 11 Water Plant Flood Protection 12 17th Street Storm Sewer Improvements Status Complete Complete Complete Functional Under Design Under Construction Under Construction The Bee Branch Watershed Flood Mitigation Project represents a multi -phased, fiscally responsible investment. It reflects a holistic approach to mitigate flooding as it will improve water quality, stimulate investment, and enhance the quality of life of watershed residents. DISCUSSION Work continues on multiple phases of the Bee Branch Watershed Flood Mitigation Project, most notably the Impervious Surface Reduction (Green Alleys) and the Upper Bee Branch Creek Restoration Project phases. Construction can result in significant impacts to citizens, businesses, and the community as a whole. Therefore, it is appropriate to keep the City Council and Dubuque citizens updated on the various elements of the multi -phase project. REQUESTED ACTION I respectfully request that the City Council agenda allow for a presentation on the status of the multi -phase Bee Branch Watershed Flood Mitigation Project. Attach. Prepared by Steve Sampson -Brown and Deron Muehring cc: Barry Lindahl, City Attorney Teri Goodman, Assistant City Manager Steve Brown, Project Manager Deron Muehring, Civil Engineer II 2 Bee Branch Watershed me, FLOOD MITIGATION PROJECT Masterpiece on the Mississippi PROJECT UPDATE Flood Mitigation Improvement Status Cost Carter Road Detention Basin West 32nd Street Detention Basin Lower Bee Branch Creek Restoration Historic Millwork District Complete Streets Flood Mitigation Gate Replacement Upper Bee Branch Creek Restoration 22nd Street Storm Sewer Capacity Improvements Bee Branch Creek Railroad Culverts 17th Street Storm Sewer Capacity Improvements North End Storm Sewer Capacity Improvements Flood Mitigation Maintenance Facility Water Plant Flood Protection Impervious Surface Reduction (Green Alleys) Completed in 2003 Completed in 2009 Completed in 2011 Completed in 2012 Est. Completion - 2017 Est. Completion - 2017 Est. Completion - 2017 Est. Completion - 2019 Est. Completion - 2020 Est. Completion - 2022 Est. Completion - 2022 Est. Completion - 2023 Est. Completion - 2038 $1,076,315 $4,158,589 $21,274,685 $7,977,311 $2,099,000 $60,974,636 $3,906,000 $18,249,000 $8,681,000 $1,341,000 $4,660,000 $4,397,000 $57,420,000 Total Cost: $196,214,536 Total Grant Funding: $128,500,000 Total City Share: $67,714,536 Flood Mitigation Improvement Status Cost Carter Road Detention Basin West 32nd Street Detention Basin Lower Bee Branch Creek Restoration Historic Millwork District Complete Streets Flood Mitigation Gate Replacement Upper Bee Branch Creek Restoration 22nd Street Storm Sewer Capacity Improvements Completed in 2003 Completed in 2009 Completed in 2011 Completed in 2012 Est. Completion - 2017 Est. Completion - 2017 Est. Completion - 2017 $1,076,315 $4,158,589 $21,274,685 $7,977,311 $2,099,000 $60,974,636 $3,906,000 Kaufmann Ave Storm Sewer Capacity Improvements Est. Completion - 2019 $11,500,000 Bee Branch Creek Railroad Culverts Est. Completion - 2019 17th Street Storm Sewer Capacity Improvements Est. Completion - 2020 $18,249,000 $8681000 Bee Branch Healthy Homes Resiliency Program Est. Completion - 2021 $8427665 West Locust Storm Sewer Capacity Improvements Est. Completion - 2021 $2,600,000 North End Storm Sewer Capacity Improvements Flood Mitigation Maintenance Facility Water Plant Flood Protection Impervious Surface Reduction (Green Alleys) Est. Completion - 2022 Est. Completion - 2022 Est. Completion - 2023 Est. Completion - 2038 $1,341,000 $4,660,000 $4,397,000 $57,420,000 Total Cost: $218,742,201 Total Grant Funding: $160,000,000 Total City Share: $58,714,536 *HUD Resiliency Grant Reduces City Share by $9 million Flood Mitigation Improvement Carter Road Detention Basin West 32nd Street Detention Basin Lower Bee Branch Creek Restoration Historic Millwork District Complete Streets Flood Mitigation Gate Replacement Upper Bee Branch Creek Restoration 22nd Street Storm Sewer Capacity Improvements Kaufmann Ave Storm Sewer Capacity Improvements Bee Branch Creek Railroad Culverts 17th Street Storm Sewer Capacity Improvements Bee Branch Healthy Homes Resiliency Program West Locust Storm Sewer Capacity Improvements North End Storm Sewer Capacity Improvements Flood Mitigation Maintenance Facility Water Plant Flood Protection Impervious Surface Reduction (Green Alleys) Status Cost Completed in 2003 Completed in 2009 Completed in 2011 Completed in 2012 Est. Completion - 2017 Est. Completion - 2017 Est. Completion - 2017 Est. Completion - 2019 Est. Completion - 2019 Est. Completion - 2020 Est. Completion - 2021 Est. Completion - 2021 Est. Completion - 2022 Est. Completion - 2022 Est. Completion - 2023 Est. Completion - 2038 $1,076,315 $4,158,589 $21,274,685 $7,977,311 $2,099,000 $60,974,636 $3,906,000 $11,500,000 $18,249,000 $8,681,000 $8,427,665 $2,600,000 $1,341,000 $4,660,000 $4,397,000 $57,420,000 Total Cost: $218,742,201 Total Grant Funding: $160,000,000 Total City Share: $58,714,536 *HUD Resiliency Grant Reduces City Share by $9 million Flood Mitigation Improvement Status Cost Carter Road Detention B,- West 32nd Street Detention Basin Lower Bee Branch Creek Restoration Historic Millwork District Complete Streets Flood Mitigation Gate Replacement Upper Bee Branch Creek Restoration r22nd Street Storm Sewer Capacity Improvements Kaufmann Ave Storm Sewer Capacity Improvements Bee Branch Creek Railroad Culverts 17th Street Storm Sewer Capacity Improvements Bee Branch Healthy Homes Resiliency Program West Locust Storm Sewer Capacity Improvements Completed in 2003 Completed in 2009 Completed in 2011 Completed in 2012 Est. Completion - 2017 Est. Completion - 2017 Est. Completion Est. Completion Est. Completion Est. Completion Est. Completion Est. Completion - 2017 - 2019 - 2019 - 2020 - 2021 - 2021 North End Ston Flooc Wate Impe ,r Capacity Improvements Facility 1(Green Alleys) Est. Completion - 2022 Est. Completion - 2022 Est. Completion - 2023 Est. Completion - 2038 $1,076,315 $4,158,589 $21,274,685 $7,977,311 $2,099,000 $60,974,636 $3,906,00 $11,500,000 $18, 249, 000 $8,681,000 $8,427,665 $2,600,0091 $1,341,000 $ 4, 660, 000 $4,397,000 $57,420,000 Total Cost: $218,742,201 Total Grant Funding: $160,000,000 Total City Share: $58,714,536 Flood Mitigation Improvement Status Cost Carter Road Detention Basin West 32nd Street Detention Basin Lower Bee Branch Creek Restoration Historic Millwork District Complete Streets Flood Mitigation Gate Replacement Upper Bee Branch Creek Restoration 22nd Street Storm Sewer Capacity Improvements Kaufmann Ave Storm Sewer Capacity Improvements Bee Branch Creek Railroad Culverts 17th Street Storm Sewer Capacity Improvements Bee Branch Healthy Homes Resiliency Program West Locust Storm Sewer Capacity Improvements North End Storm Sewer Capacity Improvements Flood Mitigation Maintenance Facility Water Plant Flood Protection Impervious Surface Reduction (Green Alleys) Completed in 2003 Completed in 2009 Completed in 2011 Completed in 2012 Est. Completion - 2017 Est. Completion - 2017 Est. Completion - 2017 Est. Completion - 2019 Est. Completion - 2019 Est. Completion - 2020 Est. Completion - 2021 Est. Completion - 2021 Est. Completion - 2022 Est. Completion - 2022 Est. Completion - 2023 Est. Completion - 2038 $1,076,315 $4,158,589 $21,274,685 $7,977,311 $2,099,000 $60,974,636 $3,906,000 $11,500,000 $18,249,000 $8,681,000 $8,427,665 $2,600,000 $1,341,000 $4,660,000 $4,397,000 $57,420,000 Total Cost: $218,742,201 Total Grant Funding: $160,000,000 Total City Share: $58,714,536 W 32nd Street Detenti _ ___ •• on . _____ . . _....,,,,.....„....„,... ,. , , _ , ,, \ . . .. „,, ,, • f ., , ' , , f ►. - W. 32nd Street y -, 32nd St F. - ,, • , , - Detention Basin _ ,rte' `\. t - • !;), co. r `--,-2,---:.P.,>-% a S� >..�Qi ---- - - 03-_-___ ---Kaufma-- - _.%"`,, ii .�;.� t---.-- r !i }' .. { ___„,,,,,,,,,,-.,,,-,,o,_; 'j s 4I 111" , WLocu _S .+,-,„:>= ; ,r s.--,:, � ~ s Bee Ora 41• r < _� ti� ti, '` ; wa ershe• W SSI 1iL- 1,t +> ?,..` ...sf�E ( gym.#' W 32nd street Detention ,. .....ase _ _...,..... -y. i ../ ,- • .„ ., „., _.. \ , \ . , s. , , ,, ,,,,If •. , • ,;:3!__,_:__. 7.,,_ .. ., ,1 ,. . , ,__yivi '' - 1,�` ..R' . . 1� .F ' '/•! '1 ) ,`;�rye/ 7 ' _ r—ti f- _ r\ tie �' , ! �'.:.> P'� , Zrd$ ----/!0 P f : ..- _ / .i • ., , t • i r' -I • ,f• _ Y r w Alt$141001.','' , .. , -. . ... ,,. ,,, , , • . P\ ‘, . ' pF)f ' l ' ' Ylyth ./ I 0 li '--iles �, r' �` V -AP ' ,\'\ % Niumnriiim i _______,_ US 20 .. - __,,,r,\--\ ---,—, 1 1 �a, a . .. ■ ■ ■■iili►..]r■ ontro e • Applied Ecological Services,Inc. Flood Mitigation Improvement Status Cost Carter Road Detention Basin Completed in 2003 $1 ,076,315 West 32nd Street Detention Basin Completed in 2009 $4,158,589 Lower Bee Branch Creek Restoration Completed in 2011 $21 ,274,685 Historic Millwork District Complete Streets Completed in 2012 $7,977,311 Flood Mitigation Gate Replacement Est. Completion - 2017 $2,099,000 Upper Bee Branch Creek Restoration Est. Completion - 2017 $60,974,636 22nd Street Storm Sewer Capacity Improvements Est. Completion - 2017 $3,906,000 Kaufmann Ave Storm Sewer Capacity Improvements Est. Completion - 2019 $11 ,500,000 Bee Branch Creek Railroad Culverts Est. Completion - 2019 $18,249,000 17th Street Storm Sewer Capacity Improvements Est. Completion - 2020 $8,681 ,000 Bee Branch Healthy Homes Resiliency Program Est. Completion - 2021 $8,427,665 West Locust Storm Sewer Capacity Improvements Est. Completion - 2021 $2,600,000 North End Storm Sewer Capacity Improvements Est. Completion - 2022 $1 ,341 ,000 Flood Mitigation Maintenance Facility Est. Completion - 2022 $4,660,000 Water Plant Flood Protection Est. Completion - 2023 $4,397,000 Impervious Surface Reduction (Green Alleys) Est. Completion - 2038 $57,420,000 Total Cost: $218,742,201 Total Grant Funding: $160,000,000 Total City Share: $58,714,536 Lower Bee Branch Creek Restoration Basin Overlook Under Construction 0 3 0 •_. a) o I. , . , C ‘ , itilt •— -.7-,.,. ti , I o 9 , i , '.4CO . .i.,,._ 1:11:1 li!ilsi , ,::'..*T:i',': • • . I ....• 1 a) 4 -SIX Vi 1:11) • .,...'"4- I .' , - i 1 II V'....r' '111 1 SIM t . ....4 ,,.. U '.e.t.)." •,..' %VI.••• ' .'4- . . 11 -1.. -. '''•i:4 II. . _ = . . . . . , 41J • • .., t , I , . • C . . - - 1 , ,• i t I,:,,I, . s Ca . S ! 'N •• ; . .. . CD — , r , 1 4 , a qv./ •i 13:I . ; - • . i r , • i , .. ' • SIM • 1 ' fil:; .. 1.' go r: '1 4 Il 7 I . ' ..... , ht . , v. loormil. 04, t \ . ,,, LA' \'.,..,*., , . ‘.4t41 1 i ollit 1 ‘\\ 1/40.,, , ,, 1'(''.'‘,\ t ' i-: r' I w 1 --\1, - .' " '7111: i A.\ , Ais \A, ,,, . ' 4. .,.. CO ,‘ ,, ' ' ' ' ' ', ' '-\•, \1 'VI ‘' ,, ilia (ID 1 ..i., ,' ,,r i,,,,,,.1. ., . . . •;_lit , . , CO il . t . ... m LA , ., i.11_ 4- 4____.e.:-.,:,*'-v . if/ : NI ‘• I ' I 1 112104. , 14n , f 43 _ ' 11 l AA ' r . • 7 , 1 1 1 , . . • • 133 0„) A : , vi - a 111 II: '. .k.,. -, . 1 I . .,gi • - CD ill t \.4 —11 0 ., 0 • ,, • y! y • 411 •/ s ! ! ! jt # ' _ / I I • I y . r I iii1 r ..l .t' eiglidiallillk 1110111 .4v..V I. d l ooiiano u �se9 :masa.) ipue aag aamo1 lower Bee Branch Creek: Floating Island _. . .IM • — �� -i� • _ Is�. r W.a° g4MV �'� / .1! nra. s �.. y . :r - • rh T• '�l• 1 7..,--=. -.-...‘.•-•,--"F•_•----•J'_:- .. rAll.10-` -',.'- 7'.-. ' ''''7 . .„ _.......„... . _ _ ...„.:. ._ . . __, .._ ._ ... ___. __ :„.........._, .,_ . . . '- - - - .. . ._..... .._ __. Genuine BioHaven`°Floating Island _ Plank&insects attract song birds �� I Plonls attract&sustain Insect populations glity.s_4.1!lp ,.. .c.:444.. , P I1r , ^ Plants provide wildlife habitat ll� j ` &aesthetic beauty Rlord surface provides / a - wildlife habitat *�, • . -VT �.4,li - Island material&fool syste '4' /10.'",/ provide valuable surface area ..:N for beneficial microbes to pofterate&pun pollutants - L.:4 L:4 '.ii..,.I: ,, A - Island strode&cools provide trans the water II , ,' cover&allow fish to thrive Root systems puN problematic nutnenls out of the wafer through hydroponics Flood Mitigation Improvement Status Cost Carter Road Detention Basin Completed in 2003 $1 ,076,315 West 32nd Street Detention Basin Completed in 2009 $4,158,589 Lower Bee Branch Creek Restoration Completed in 2011 $21 ,274,685 Historic Millwork District Complete Streets Completed in 2012 $7,977,311 Flood Mitigation Gate Replacement Est. Completion - 2017 $2,099,000 Upper Bee Branch Creek Restoration Est. Completion - 2017 $60,974,636 22nd Street Storm Sewer Capacity Improvements Est. Completion - 2017 $3,906,000 Kaufmann Ave Storm Sewer Capacity Improvements Est. Completion - 2019 $11 ,500,000 Bee Branch Creek Railroad Culverts Est. Completion - 2019 $18,249,000 17th Street Storm Sewer Capacity Improvements Est. Completion - 2020 $8,681 ,000 Bee Branch Healthy Homes Resiliency Program Est. Completion - 2021 $8,427,665 West Locust Storm Sewer Capacity Improvements Est. Completion - 2021 $2,600,000 North End Storm Sewer Capacity Improvements Est. Completion - 2022 $1 ,341 ,000 Flood Mitigation Maintenance Facility Est. Completion - 2022 $4,660,000 Water Plant Flood Protection Est. Completion - 2023 $4,397,000 Impervious Surface Reduction (Green Alleys) Est. Completion - 2038 $57,420,000 Total Cost: $218,742,201 Total Grant Funding: $160,000,000 Total City Share: $58,714,536 luawapeidad alep -..„1,y4v...nit. ..„4.: .,. . S ....,.: ......:',.•ro • nu .• ,� .G ` l ,. i -_�� ~ - �� �':.. I - ' a..'tom` I! Ali- 4 It's. •‘......'N --• [ y •‘......- fie" Y '� � 1. 1. par_ .�..��__— n' . icL_ - r_ •.yy _ iw +�.rF _ uo! eJolsaJ 1aaa3 tpueig aag aamoi I luawaDeidaa ales • -�: _ . • "/1111111 . • .• .•. - - at, I r •.1..'tom` II Allir-- N.••••• ''...1 14 '.T ���•- r • r 'N _. [ .-• Y 'L: uo! eJolsaJ 1aa13 tpueig aag .aamoi I Flood Mitigation Improvement Status Cost Carter Road Detention Basin Completed in 2003 $1 ,076,315 West 32nd Street Detention Basin Completed in 2009 $4,158,589 Lower Bee Branch Creek Restoration Completed in 2011 $21 ,274,685 Historic Millwork District Complete Streets Completed in 2012 $7,977,311 Flood Mitigation Gate Replacement Est. Completion - 2017 $2,099,000 Upper Bee Branch Creek Restoration Est. Completion - 2017 $60,974,636 22nd Street Storm Sewer Capacity Improvements Est. Completion - 2017 $3,906,000 Kaufmann Ave Storm Sewer Capacity Improvements Est. Completion - 2019 $11 ,500,000 Bee Branch Creek Railroad Culverts Est. Completion - 2019 $18,249,000 17th Street Storm Sewer Capacity Improvements Est. Completion - 2020 $8,681 ,000 Bee Branch Healthy Homes Resiliency Program Est. Completion - 2021 $8,427,665 West Locust Storm Sewer Capacity Improvements Est. Completion - 2021 $2,600,000 North End Storm Sewer Capacity Improvements Est. Completion - 2022 $1 ,341 ,000 Flood Mitigation Maintenance Facility Est. Completion - 2022 $4,660,000 Water Plant Flood Protection Est. Completion - 2023 $4,397,000 Impervious Surface Reduction (Green Alleys) Est. Completion - 2038 $57,420,000 Total Cost: $218,742,201 Total Grant Funding: $160,000,000 Total City Share: $58,714,536 Upper Bee Branch Creek Restoration 110 , 7:3 • • bi 4 . Ikhir - , . ,-%---2 -. - =401, le f-4 - - ,..- _ ,.__, -,,:*.:'..r. • ' --:11T,. - 0 . - J I___,,--1- — A 7- 2( ; . VIC t - .. 1 4. a �.a. : cel ttea_ - . - . A. . , :� , ,,= 4 . til i %. of �.A r � -'s1. i• --.„,,,s,..,)....__________ 14 1 - * if., ,,, n , _......_ _ger„„,... „A,,,4,,, , n r, _ii....---, / . I ►. ' `St ) II •-7------„„...,-4"St----.... lu ) ) I' t IIS I iN ,, � pr.i. Vii;"-- - i�� (Il! it11 : i. i14 - r - .:�t. . *r.-Ar -*-- , , • isii,s4,-,, . 'T'as. .1:- = '.,t17_, ''''''.-1'-',.ie:apiii, I ./ 4. I Upper Bee Branch Creek 1 1-isillillifr. 0 • .1* , __ .,.. sh ill img 1 o , 4,- pc -----. ..P,......, 4 -..... 4-1 1 (_ U lit' ° Erin ' (n - 10.1111 i .... CI) Siaqwotid ' ha , a __?, I _ _ 1-,T--- iiiii • - CC C) / . — a) . ,.... s_ f t..) s SW1, 1\./ 4, U • r'', .; C i--• -' - Sm I' iii 4 13:1 IS' rwir z. .-_...,_,,_ ' , . CU n .. , CU _l_stti r i i Wei M • %. , • .._„r , Sm -----4 CU it -If • / C;1/4. e a '‘hiPt 1 fi • e...ara... .t f / ,t0 a ".•i , / 'S If ‘er . •. 9,125,% k •--/ et ' -Ne:Th4N, , Air\ .. • • 1 _ . , , , IF. , . ' \112111-1 -,e. .. .-i 1''. i, I I li , It' IN;• * 't r, A 0 __-.. 1 • f'' i ---.--1 1 , s I ..'. . I . .1 I, kir bi;,. I - i + •ii ' 0 1 i .• I , ' , ' I: •'' I'l 1 .. , • . / , •- - I / CD , [ . ',..-- t ti 4 4 4 SM . e, 0 , 1 , ,. .1 IL. 1,, _ I. , i • 4=0 1 . q.i. ... IA , I -,-( •••, • 1 , ce - , 4i• , , mar_ am ' ti I , ., .711, , ',lie 0 1 .1 SM • .,.•• ,__. .,••• r . . . , . , , , •, ,. , ' ' ._________T----- -- • ' . . ,. ' ,i .• 14 . I .. = a \ \\------------' ----;,::::-,,:. r . •\ -,, . ..... • U --4.-- , ell C - * _ ea ._ ,.. ..• C1J : 1 •• .... Sm i, 'IA s': • .,:, 4„ _ ,...., ,........ A a) al 0 ' i 11 18111 i CU CL , I i:-...-* ';Li,••,-v,,,,,..vv , . • - _ Upper Bee Branch Creek Restoration ilk... , ,: ) ....v:."." i.07. ' V 1— ZS - . .., . . ....k.. CU .... ..• ) 1.= IJ-;41 (':" .‘ .A'!. Q •- Ilk"' ''''-• :1•41,•.:•'/,.. ,: --,.•..... • • - - ' E - o . . co , . ...-- ... . r•si iii ..1/4_ . ,'4. II-I.l'i' '''' --•-_ ...-:,, ' _ . , 1,-.. 4..'' ' -.-- •-..' g• 1-1- z ) ----„ . ILO , -..- • 1._:- ...,.. , . ...: II • . 11111111ifte . 17- ' / ....' `' -....ism solow.n il • ;•S' ' ir= ri r 1—, = 4. N,./ - .... ) ,,,. . -...„. •-) (..\.soli n , , ' I . I•Mil .11 .........................c.: • ••••••.......... 1 .;.. ..''.'".01 ....".1•111••••-.__1;77. NOM MN I'''.' ' ir - czs. -4 ....... ...... ....„...........„,,„„ _______. ......N. •. ) -..i.:.'-, . 4 • ..41i• -...., arith,. ri —...— r- rlirl/ 111" P 1 Vet) . • 0)------ ------rt-- 7-;">--, ...,.W--, ,-, , ....")....„.„,,,,,i. :, . 4 _....7_,) il ...Y1.,..1 . i 0 ,..., .0, 7 '' 4), • lii. i / # ,,• ' • -," '0 0// .. A - =Er • ._ -.r...„ ; .... • tipi. . . . •f I '. ..,. . ' ...0 , ., . St: 4.'1 ' • 1 Y--k , .. . .. ... . . , , _ , I \' NiiiI, 1 t ,'. I\ O'dr M� Cy - •Ye - C ' .%. , . ei:N18. / \ .',47 1. , • / 1�/ ../' i ' , ,• CU i,•J i :% IL J mC r/� 5 �/' if 1 1 V P 7:4740,- ,11,-, .\ / / t �e . 41�e `f s/ i 1 a3 4 1 . „„z ,•,/ w . ., 1 V 1.. Y . '..1 I 1 1 ' \\ Wqii "if,./-' ../ , - . . - ' ),, • \ m s_ \_CU i,.•• iv \\f —__ p Upper Bee Branch Creek Restoration s. t r- 41111r . I Y ���I f''9 j iii h :' zT1L1 : . ....dire.`. / P V r, 11 - _h, t . Li ..111111111.1111 9 ; 'IS( I n �`♦ , lr4 i �� t / . iC 13 13 _ ¢i CD kc .ter �` _ 0 )=-1' 4 'Or i.1 ' -4, '-,4•-•,,e 4 • (111) MI Di 11, ;r k , 1 , i , VI ! I rillii ".... , :if, ri \Ili', :. III " JJf• 14 /).1..„ { `.li , Cr 4 ' lxi,, , „4:. t, CD `y ii I Y■ , f rr O N I OJ , ii ' -. I0 / 0 e. ' 4!- i j III 111 I :4 _ Ie.., if 110 i� II � I i::: a j�•� , J : Upper Bee Branch Creek Restoration Upper Bee Branch Creek Restoration II MI ac.. q 7•lit Bkofleld A y Limestone Channel EdgolCurb • /Dry Weather Water Level ,a _ 11 Channel Sidewalk • . IJ Corn•acted Base Course Lunker(Fish Habitat) Fish Structure Cobble Channel Bottom IOWA orvurerer or AGRICULTURE r1 D MLR tVf¢aS*:�IdJfP�G Upper Bee Branch Creek Restoration r Limestone Channel Edge/Curb Li 1 Dry Weather Water Level ,,�frpli • rT�•;` /6• •I •-.!31 ,:-/.61P0A;( y_ Imo. * �y' 1 fir1j,_f4 g. ` ,..wir44, 44. _ __. z �"�r.r .„ - . . Jam. -._. --� _� _ ,_ tea_ _ - ,, _.,..... y ._ __,...... ,...„., } T'# iiimmow....,. l}-•• - J 7 _ - A4 . . lahlen,„ Upper Bee Branch Creek Restoration 4., .,,... ...._, ".V4 v Xl.s- CU I , LS I a) 4 (Nr.ic priA.,._. ,, s. ------ . ..- ',, . ,..: 4= .s.. "&-... ... N. / ) , " • - — "i ". ' t t. " 1 ac —C . CO t -N., — .0_ , i on 0 /' * --. ,11-_-":_ii r,- • .c _.=...L., '-'••_. , 4. Villimani o•. 4i!At;,t...-' -. ''--,--"-1/. ,/ 4•/oh-'-..,, i\A ›.I.---_•.11. .......-. .. .t./..1.".,•.............-f-.—...N,-'-'ij,=.--i—m1-r.=...Q-=.i..—m....—.....•n..•" " d11 W e6 * .a'1Ii m,":ivti---i4s.-rso'_•.w-'_e—'2.=lMl.1.iL.-i11„I1, n ...4.i.-.;.l.,o..•.li/,..•," 01,'-:11.,,Fm4•1,/•.).4l4l_--4 f,1/14,t111.- /1141%il-s 1-1k1)•::* —•.' A...t'•••:*• /1 11Ir 1 1 - ‘•:4. • l'-i' •_1 ....h . - E.Y i;i1L-J1)! 1 "IF-4 1•� -r4 1 y� �� 1 .I. . .'.31 i Illi. ..; , . ., .j(, 1, • ea � v L _ r � ,1lfi. , 1 . O i• J , h M. • y , ii f VII . ...6— r ..I 1 I. ) 1 •fr ka\ ' I., klt.. , I . I . r 1 u .= , 1,4„;,..r;;;.....,„. . , :.„. , ...,_ __......„2„,,,...„, p,....; ... .ci 1..,, , , :. __ i. i , :,..i...„\t,,,:4,,, ' y.. L.:. 1,1 'i; , 1 ,..? '. \.k. t. ; . , .* .0 Y 'i Je '' • , CD ?� - I' � { . M l ..Z '� `� 1 I , 1 ,, .) ` cci ! �, � . n J I _ . . ='. 1# ,z , I. fir' ' } , P1eiq i t;: $, i . 't,.i , • . 1. is: $•:,-,1j.i li, in (I -I fir i. . ' �W twka k h .'N' + r ' t. I • I, re. 14 , i i a) i , } `i.Y,• .e ;. l i. � "\\ .. Et] s 41.1111 C S - J r7:\ _ • t I' • • IA . ,,,:., s, ,. I 1 C . wit i il. 1 : , qr K}..�� � r 1 11� �� •C t, , $ ` •) U : A a 1 F• /": ,. a ter. -. +J'-y., ( P'1 F. U Upper Bee Branch Creek Restoration • 1 I PI I E r,F--- - r . 4forric ,isti II , • /,• . .-_ IONtiV v --- - - )-s ..., ' ' ..I• . . ' .,4 ' • ' ' ...., ....'•'' ,1 - . . • • .o. • _ ...„ . dbo-- - 6 , .4 i . II ,... • ... Itelek Er . . . . • • . ....., . _ . - _ ---.-- - -- . ..... _ ..' . . . -.. 111111h . t4 - ' 03/30/2016 „, ... .,,,, .-- .., -r.V i.i ! I. ...t.r. .1111111111W/I' )SN 1, '• / s 40/ .7 Illibiti,i'i i , ' =2:7'''kill . . ' 7let ;i.;fr;r' .' . . _(101 ' \;11711PC411/47' . 7, " rty, 4,-", -7'.: 1,..7. 1 t Ap ,,/ /•-•••.„ _ .,. imm,rjil p„,u,il---;-' :Ani zzgaHl ... k 14 . \ -....4,..../ ,.:( L. , , , - , '.,:j ; I A .11 ( _____A u = ,Iiim.-- ,. .. , , . ti Ise ...0....m......................son ,- 'x H 17, ...'".""..."••• ___ wo ,Ilik 111 .....-- e•m••MN ft i,sh . 01C .- - V -- 7- 47. • S'64 4+ 41 r . ._ _ ..e. , . 'IN ______.,_,„_ 1 ,-, I,N 1 mum MUM ft. ,. / 4 . is s„.„.: % 1\-1'- il a , 7----- guy r lir II ll 7 I ' I Mew oft) i 1 I 714:' r-:- ;I: - ..- . ,. . , ( „ ,- , p : , „,.. . . r . ii'' -r, T -'' '-----4-‘•L_411.„_. . „..... ,AI .i -__ '.' ' . a'r - Si- • .. " --- ,.._ 7. .. -. - -_-- -; e •-..3; I 14.9. y./4— - -: --'• , ' " - ' - 1/ ' ' - ---- , , , my. I iS a ,,... m- • _ = r—i-,:-.'..' . ' . 0 .: 7,, . i . , Si A. / j 1 • ZI.S? lc. 4 I 6, 1 CD; cr m (53 .. , ,it MM. 1 ,rgle- 1 ' 4 . A., 14 S cl .2: .4. a a 9 Jaddn 43U eis uoileiolsatl 113'3613 • Upper Bee Branch Creek Restoration :I a-10t.Pes.. "'":-' I '' ,kl. 'r.61 /1: 1 • �: � .- i ,,, ...., ,,,, ,„--, . • 44., ,k. , 1 _ i - �'U ;9.,1 " . 1�, ' * S ? • .1.. t. rM MU IA TPN `Ilalli!i 1]F �ar I _ 1140*, — 1 -• iiiiiffillar 111 iii iii-0»» 11111 iIMINENNEWOO • -ai C' v- t xi d .7 - ' '1.. _ �" - .. Jam' �i • Owl - I asp^- • '. 41 a �.` • . - rx.-..r-•!. '- ,__.,._:' • r- : _........_ _ 4:, c di ,W-1/.:Illj . LIIP''''°41P114" -46:4: 7.; -3 \\.....! :re 'iletle ......- •► 1 .. '�Qq ~ �� _.- *.• fir-` - - ft -.1.4111-_ . . �twa.", ",��': �, �+ ..~ rill �- - - 1 ' \ --4- *. 47_,A. 44_,C74 1 1t`, 1 1- - Upper Bee Branch Creek Restoration s. - v dA /` r- fVi 1j If' i 1 , 7,7,41, 1 . ,. as --I' �. _ 1--- ',/;) — I'..., , r�� ma , 1 Upper Bee Branch Creek Restoration 1 . , 1 a f ; 1 ; ! i ,„0, !_v:...!".), --manomer"""", i.•• .. .. -- ----_-\-4''., -,, --- ..- _-- -*--...-tp;---.,, ,...- t . _ ,,,....._ „um. N , ___,..-____......._,.. ... „..,.. ....„.....„ ti i IF 041:2T t i , . y► lar _ - �_ 1 ...«- - -r•—- - li I�+' t �i�'1 ' �I1� I ` I ..ter / .18:3,1} .A. r �. i . . wit_ • 00-.71. :P, 1 c i ":1451.1.- .. 1'1' . ' 'IV/ .. , lipl'',1-: . i Flood Mitigation Improvement Status Cost Carter Road Detention Basin Completed in 2003 $1 ,076,315 West 32nd Street Detention Basin Completed in 2009 $4, 158,589 Lower Bee Branch Creek Restoration Completed in 2011 $21 ,274,685 Historic Millwork District Complete Streets Completed in 2012 $7,977,311 Flood Mitigation Gate Replacement Est. Completion - 2017 $2,099,000 Upper Bee Branch Creek Restoration Est. Completion - 2017 $60,974,636 22nd Street Storm Sewer Capacity Improvements Est. Completion - 2017 $3,906,000 Kaufmann Ave Storm Sewer Capacity Improvements Est. Completion - 2019 $11 ,500,000 Bee Branch Creek Railroad Culverts Est. Completion - 2019 $18,249,000 17th Street Storm Sewer Capacity Improvements Est. Completion - 2020 $8,681 ,000 Bee Branch Healthy Homes Resiliency Program Est. Completion - 2021 $8,427,665 West Locust Storm Sewer Capacity Improvements Est. Completion - 2021 $2,600,000 North End Storm Sewer Capacity Improvements Est. Completion - 2022 $1 ,341 ,000 Flood Mitigation Maintenance Facility Est. Completion - 2022 $4,660,000 Water Plant Flood Protection Est. Completion - 2023 $4,397,000 Impervious Surface Reduction (Green Alleys) Est. Completion - 2038 $57,420,000 E Total Cost: $218,742,201 o�QP iiiI \11 Total Grant Funding: $160,000,000 * I *I Total CityShare: $58,714,536 ��I��II�II �� Q 9S DE\100. 22nd -i- Street Storm Sewer Improvements . __ ._ . ....._ _ ...........- _,. 22nd Street Storm Sewer Improvements \ \ ' / ,,-, ........_,.. _ ._ / 77 , , - - - 4 ).Pi/ - .44,_-, . 6 5 7.11 • - , - ,, - . 44 .•" • 0 i ; . -6 / •,r0 ,,. AWA(li k.,N ,ir . ....._ /cot 11 . , / ( -.144k TI... '401 . -- - ..,, A 0 \ P, cti, _ .., ..4" , Mt ?r \ _ - .3%, • ,e ' \ , - z1 :,, . '1/4 ) -,•-• \ '' ,A /- \ `•...:::,,.:,.,_. ______44, , . -kir\ A. 440 / \ cv. \ sx . \ . ... , '• ,,,, ‘ N 5 ' 0 r'4' .. . \ ----- %G. _ 'r `‘, ‘, ..e....,, , ,, . fr .''. •'.r.' z ,-rirrAye 0 , ' -..... - ..,....0„„kc 41/4, to ,: --,------/- 03------------Kauill • • --, LEvii. • 0 ' • ,,,--1 _,-1 / 1 ...;.,. ..1. .,c 1 4:,,,, ...,--N i . , ,-.--••,,. -. 11"4. ,•,-,, \ Vor , , .. , a , i''4„ON-L OC li Stat.. . .## % • i I , . / . .1.---- _ ,- ,,,,40000•0',0 ilk N \ i i i (1 ,/ef. / .- --- ,- • ,,,, tA. _ _ a-- 400 Ili\ -c.,,, - .. •Nir,A4 A & as-- A , , Pennylvania Ave dial it \ .1111:00 ;,t. \ \ li - , twit ,i‘iice ei / 0 0.251', 0.5 1 i/ ' Miles \ ,-'1'-'441' 1 'X .-. __ L___----r---uS20------------ I / - -7---\---\-------- -----'-',,:-T .- ;‘ til. II .,* -- _ --- , , --- \ ,...----- ____ _ / i // i ,,.., "... Flood Mitigation Improvement Status Cost Carter Road Detention Basin Completed in 2003 $1 ,076,315 West 32nd Street Detention Basin Completed in 2009 $4,158,589 Lower Bee Branch Creek Restoration Completed in 2011 $21 ,274,685 Historic Millwork District Complete Streets Completed in 2012 $7,977,311 Flood Mitigation Gate Replacement Est. Completion - 2017 $2,099,000 Upper Bee Branch Creek Restoration Est. Completion - 2017 $60,974,636 22nd Street Storm Sewer Capacity Improvements Est. Completion - 2017 $3,906,000 Kaufmann Ave Storm Sewer Capacity Improvements Est. Completion - 2019 $11 ,500,000 Bee Branch Creek Railroad Culverts Est. Completion - 2019 $18,249,000 17th Street Storm Sewer Capacity Improvements Est. Completion - 2020 $8,681 ,000 Bee Branch Healthy Homes Resiliency Program Est. Completion - 2021 $8,427,665 West Locust Storm Sewer Capacity Improvements Est. Completion - 2021 $2,600,000 North End Storm Sewer Capacity Improvements Est. Completion - 2022 $1 ,341 ,000 Flood Mitigation Maintenance Facility Est. Completion - 2022 $4,660,000 Water Plant Flood Protection Est. Completion - 2023 $4,397,000 Impervious Surface Reduction (Green Alleys) Est. Completion - 2038 $57,420,000 IIIIIII M� ENTOFyTotal Cost: $218,742,201 Total Grant Funding: $160,000,000 Hili xic2 Total City Share: $58,714,536 Q 9.61'9N DEV0 Kaufmann Ave Storm Sewer Improvements , . _ T ,.r ',,, • ' 1 ....' 1 k •/- 1 ''' / ,,•• :„, ,' - ,, apitir 3\ ./ \ • / __-- .; 444 ' 5'4, ,o, 1 fe 4 . , -0- 4 ../ \. ' ' I ( I ,,ISIV"• •7-.... -' ', $ is2( 1.-- ...: --:--- , , • \ ., r i/. \ I - -- ' - • " , ._1 ite , ,-../ i ..). itt14 Ces' # ! 0 / - ----- . Aft,,,,,i4 ,./ ./. ----- 1 , b -- -- , .•,, ..... • , 1 0 i 1 446:' • A - i rt. et). , . . , i C , d•\ \ a. i ,, ,, _- 0 _ sz, ‘G ! •ds\ 1' ,$ • \ - _____ , ._iGe , 73 ----- __KaLlifirallin • , , ---'=-- - \ \ -'' 0 - - '-------- •-'''' .40 " 0. I ! — , ; ' ^ •,,, - IN,: 4:,,,, \ I at ' W__Locus _ t - '------ , -,-, ----i 1 --71? • , ,, /, J t. I I i v- - „1 as , 1 ,-, , ,,co _ -- \ \ \ .._ Pen Oylva n ta-Ayp,1.--776.-5-------------------- --......_.,_ _ i --• ' Ss5:410?-fj slum ,- . , i Kaufmann Ave Storm Sewer Improvements (0), ,-, Flood Mitigation Improvement Status Cost Carter Road Detention Basin Completed in 2003 $1 ,076,315 West 32nd Street Detention Basin Completed in 2009 $4,158,589 Lower Bee Branch Creek Restoration Completed in 2011 $21 ,274,685 Historic Millwork District Complete Streets Completed in 2012 $7,977,311 Flood Mitigation Gate Replacement Est. Completion - 2017 $2,099,000 Upper Bee Branch Creek Restoration Est. Completion - 2017 $60,974,636 22nd Street Storm Sewer Capacity Improvements Est. Completion - 2017 $3,906,000 Kaufmann Ave Storm Sewer Capacity Improvements Est. Completion - 2019 $11 ,500,000 Bee Branch Creek Railroad Culverts Est. Completion - 2019 $18,249,000 17th Street Storm Sewer Capacity Improvements Est. Completion - 2020 $8,681 ,000 Bee Branch Healthy Homes Resiliency Program Est. Completion - 2021 $8,427,665 West Locust Storm Sewer Capacity Improvements Est. Completion - 2021 $2,600,000 North End Storm Sewer Capacity Improvements Est. Completion - 2022 $1 ,341 ,000 Flood Mitigation Maintenance Facility Est. Completion - 2022 $4,660,000 Water Plant Flood Protection Est. Completion - 2023 $4,397,000 Impervious Surface Reduction (Green Alleys) Est. Completion - 2038 $57,420,000 QP� M � ENTOFyo Total Cost: $218,742,201 111 ('''' Total Grant Funding: $160,000,000 "` Hi * Total City Share: $58,714,536 Q 9.61'9N DEV0 Upper Bee Branch Creek Restoration .p _ _______ __.• _____ . : +, _• • .. ., _ • ____ .. . . sic _._ ___,_ . , ......_ .i...„,., . ; ..._ • _____ • ....... __ _ 1 d*iii% fr11-1-1.1111111-' . -.-• • • .. i , • 7 „of pig 1 I.. 'ttI ow el f • .. _.._ _ _ ,filli°41H. 411(11H • - •, , IL Lower Bee Branch '`" ..,, • r s • f . iiiir ..J.- Upper Bee Branch Creek Restoration Existing Bee Branch a., � Transition Structure - • Proposed Culverts (Tunneled) Existing Culverts Upper Bee Branch Creek Restoration r/I4i II1 iI. .'II 1 i.1ii • ..4•4u.Im-I°1l..I•.t Ii • 111 gili ... 00•gm_'.... 1i0O100sS i . '.F.vi4.4 tA.•t-. ..#.",4.--3.•T•.-t....,.....‘...;, .i.I1lP0.e..1,.•.0"i,.., -- No N 11i1f . . o--.1/FOffiil,ligli."Filrrar,. '11 .:.,•,„, - • • 4 i' a - . ii; f.I 4• 1 ''''ti 1-- 0.. •••••1. '" ••7_- ''''''.%#„,;•14 Iiiiii ' 11k i t."J-.i.. vo , _ , 'cOk.. ?-1•': . A10//' . i e'.. ..4.,,,,...04,• -lir* ig, . - A•tyriiii",•-• Pit rt r .'Ai, , i - ... -- —1 • AIN I' •''..? - .. •JI , '45% .# i,,' I. lit 1 .40arre. , .• ,..- - , - .-..!-,,,-... - ..: 4 - .. - ,,.-,4-.... l• ,•••,4,...1 .... . ..-",* . 4, N.. ••,- . ,0 air .... t r) s # . • „it- .0"„ IN , ......• ...., f - .., -..7 • ;,l . :, , - 7 . .... , r . . ._• . . , 1 : '• r . ' • - : 111111111111111111_ .td, . t 1 .t. t..' - 4.....";-`...;-,v..-'.•:' -*. ,„:-..'•-;,-', • t-• 466.•----: ,,,;,. 1.,.. -_ 7,, - • ,. -_ I . . ._. ___,.. 6 ..-,: it:T.- -,...-,*. . ••-.• ,;; .3;,_- -. s, ......_.., _,.: •-•• ... ,-,. , , ._ , .. . _ . . ,- , • • 1, , 9 , .. _. . .x '.. .-...i .. 1 • , t. I. . -- I.- - ., . , . J.. .i -1 t . _• i• '- , , • # . '. I , f i t - r • - • r• _ I • - ' — T. .... ' 4 - 1 • - - • • , • ' moiNaNirro- 4 ' I • ._._ .. 1 ‘ , ...1 ... • , .. ._ 11,• ;' , , Ill ....- . .-)11.1.11111.111.11*1". — . __- i... ' - , MP''''' - - - - -- -----.'"'"" $ 4111111.."11r— * . .;., 1.:,...49 , ,,,, _ ----- a. "WO . 41 i . 00--, - • ci ./ ,...,.e.. . .._- %I. t - . _ -_, - •4,-,"-. ' '‘. t'''r ' ... Micro-Tunneling . :-....--_ , _. ,..., .._.., .. _ : . , _. . r ..i ' • - - 4 .,.... ..". ...ti,• ''' ' self Upper Bee Branch Creek Restoration . . . .... ..,,......„, ____ . v.i. t- - . _ • . • „ .0. _....._ „ .. _ .... .t., ‘,. _.......... _ .._ , pi, ,_'''-- .11111 7898 I . _ -- 41ligt .0 . • ` It Y . 1 ' ._ •-il 1 A / • .JIM ' . r. )iw ! , ... Ali r r k .,: ilid& _ • c . #41, 2 , , , -141411,AZ,Mfar - ....-' ' �• ../.1k ` : ..'' .. Upper Bee Branch Creek Restoration 11 „ - �W liar .11117416 • SION1.0141L"Nibt"%v-1141.11 1 __ `ill- - + • ,- war- After Construction Flood Mitigation Improvement Status Cost Carter Road Detention Basin Completed in 2003 $1 ,076,315 West 32nd Street Detention Basin Completed in 2009 $4,158,589 Lower Bee Branch Creek Restoration Completed in 2011 $21 ,274,685 Historic Millwork District Complete Streets Completed in 2012 $7,977,311 Flood Mitigation Gate Replacement Est. Completion - 2017 $2,099,000 Upper Bee Branch Creek Restoration Est. Completion - 2017 $60,974,636 22nd Street Storm Sewer Capacity Improvements Est. Completion - 2017 $3,906,000 Kaufmann Ave Storm Sewer Capacity Improvements Est. Completion - 2019 $11 ,500,000 Bee Branch Creek Railroad Culverts Est. Completion - 2019 $18,249,000 17th Street Storm Sewer Capacity Improvements Est. Completion - 2020 $8,681 ,000 Bee Branch Healthy Homes Resiliency Program Est. Completion - 2021 $8,427,665 West Locust Storm Sewer Capacity Improvements Est. Completion - 2021 $2,600,000 North End Storm Sewer Capacity Improvements Est. Completion - 2022 $1 ,341 ,000 Flood Mitigation Maintenance Facility Est. Completion - 2022 $4,660,000 Water Plant Flood Protection Est. Completion - 2023 $4,397,000 Impervious Surface Reduction (Green Alleys) Est. Completion - 2038 $57,420,000 QP� M � ENTOFyo Total Cost: $218,742,201 111 ('''' Total Grant Funding: $160,000,000 "` Hi * Total City Share: $58,714,536 Q 9.61'9N DEV0 17th -•-Sreet Storm Sewer I mp rovements ._..... ... ... ... _________„4„.. _,-,.. . ...._‘_._._.___1 ' , / • e _1 �> 0,i% gym. �` i -- — r r r / ,. A % e,s\ c.... b ' _ ,ih 4 , , -,--,, 4,- . , rs � .it , _ KauAve ... o �' - - --� - -MC is ; ;�` ,_ 4: % .......-( 4...., ..,,, , _ , \ice i \ , , , _ , � 6 j st- - ', S�j4 i'/ l'_W± OCUSteS,ti • j i 1 l ,." 4 , ` R �," r.7' Ram I - ,1' % ;.i ' l s 1 foris,i. Penn's�ylvania Ave i'� v. *V�I 1411`' ,'1 ` 0 0.25 i 0.5 1 ,7' /6%----------- If If, C", 414e* ," i / i ' Miles _ _--``2 17th Street Storm Sewer Improvements Flood Mitigation Improvement Status Cost Carter Road Detention Basin Completed in 2003 $1 ,076,315 West 32nd Street Detention Basin Completed in 2009 $4,158,589 Lower Bee Branch Creek Restoration Completed in 2011 $21 ,274,685 Historic Millwork District Complete Streets Completed in 2012 $7,977,311 Flood Mitigation Gate Replacement Est. Completion - 2017 $2,099,000 Upper Bee Branch Creek Restoration Est. Completion - 2017 $60,974,636 22nd Street Storm Sewer Capacity Improvements Est. Completion - 2017 $3,906,000 Kaufmann Ave Storm Sewer Capacity Improvements Est. Completion - 2019 $11 ,500,000 Bee Branch Creek Railroad Culverts Est. Completion - 2019 $18,249,000 17th Street Storm Sewer Capacity Improvements Est. Completion - 2020 $8,681 ,000 Bee Branch Healthy Homes Resiliency Program Est. Completion - 2021 $8,427,665 West Locust Storm Sewer Capacity Improvements Est. Completion - 2021 $2,600,000 North End Storm Sewer Capacity Improvements Est. Completion - 2022 $1 ,341 ,000 Flood Mitigation Maintenance Facility Est. Completion - 2022 $4,660,000 Water Plant Flood Protection Est. Completion - 2023 $4,397,000 Impervious Surface Reduction (Green Alleys) Est. Completion - 2038 $57,420,000 QP� M � ENTOFyo Total Cost: $218,742,201 111 ('''' Total Grant Funding: $160,000,000 "` Hi * Total City Share: $58,714,536 Q 9.61'9N DEV0 W. Locust Storm Sewer ImP !OVemeflts 4..- _ , I\ 4. . `, } �' '} x:145 `4, pop 1 - �.�--._.—i I. - may + +ilk`\` i ,` \` . ;a� _ •• ;% ;, -� het t ' P aS-- c0 - ' \ . _ fr, .l0. r • J } ossa• i ,„ , .. -,,--.,. ' arm V ., .4,- . ___, ', 2,\ ,.. ",- , .• „., ,....,,,,,_---, ,) ,ii, 'rte I I :1 �(� pennsylvania--Ave--o.s-"----_- -i _ . t W. Locust Street Storm Sewer Improvements '�,,',' , USS 20 .a.,, Flood Mitigation Improvement Status Cost Carter Road Detention Basin Completed in 2003 $1 ,076,315 West 32nd Street Detention Basin Completed in 2009 $4,158,589 Lower Bee Branch Creek Restoration Completed in 2011 $21 ,274,685 Historic Millwork District Complete Streets Completed in 2012 $7,977,311 Flood Mitigation Gate Replacement Est. Completion - 2017 $2,099,000 Upper Bee Branch Creek Restoration Est. Completion - 2017 $60,974,636 22nd Street Storm Sewer Capacity Improvements Est. Completion - 2017 $3,906,000 Kaufmann Ave Storm Sewer Capacity Improvements Est. Completion - 2019 $11 ,500,000 Bee Branch Creek Railroad Culverts Est. Completion - 2019 $18,249,000 17th Street Storm Sewer Capacity Improvements Est. Completion - 2020 $8,681 ,000 Bee Branch Healthy Homes Resiliency Program Est. Completion - 2021 $8,427,665 West Locust Storm Sewer Capacity Improvements Est. Completion - 2021 $2,600,000 North End Storm Sewer Capacity Improvements Est. Completion - 2022 $1 ,341 ,000 Flood Mitigation Maintenance Facility Est. Completion - 2022 $4,660,000 Water Plant Flood Protection Est. Completion - 2023 $4,397,000 Impervious Surface Reduction (Green Alleys) Est. Completion - 2038 $57,420,000 Total Cost: $218,742,201 Total Grant Funding: $160,000,000 Total City Share: $58,714,536 Impervious Surface Reduction (Green Alleys ) Impervious Alleys =�; (240) a ' `\ `,, `•. ///AN ; -- • Completed Green . ;� r` :fl , Alleys .ti ( 59) y '-tom •� ' _-_--r'� 2016 Green Alleys %1 ' i., ,:,.:, +( '` J; r sem , i d, M, i / 0 0.25 0.5 1 /- r rv. 1' �7 /% i / ' 44 X \ It,, / Mile .N i �• w' ,_ \ r Green Alley Interactive Story Map1 t � ` ,, p', i www. f r r n ll ctyo dubuque o g/g ee a eys ,, __ „ . _ _ 'Befoe i; After ` �, „„ . I� - ,,, • , . - :).•* , . 4r, �� . !. riT i ! - . ;`”' 21"'�� Ems'S.. fl �1 ter. . ..r � At psx> .•r 16 ,, — -- -7 .0111PF _ . _ .4._ ‘ 69 :%.„1 , „„,,,t. j ././migip, r< ir . , _ , ---- 13 �' Between Lincoln Ave& Rhomberg filk, Ave from Schiller St to Humboldt St F]t9 Between Lincoln This alley was reconstructed in 2014 by Ej Drew Cook&Sons Excavating.The total IP 9 Ave & Rhomberg cost was $70,118. 9 Ave from Schiller St `' to Humboldt St Map data © OpenStreetMap contributors, CC-BY-SA . 1 � 1 ,-��;..�K _ THE CITY OF 1 --._ �.�..___.�..- DUB E iiiiII • p f --' - - Masterpiece on the Mississippi • 1 i ` k Questions ? www.cityofdubuque.org/beebranch ,,,,.„ f facebook.com/beebranchdbq '1%Z- „�=' tOr twitter.com/beebranchdbq