Mystique Casino Request to Construct Outside Patio and Pergola Copyright 2014
City of Dubuque Consent Items # 21.
ITEM TITLE: Mystique Casino Request to Construct Outside Patio and
Pergola
SUMMARY: City Manager recommending approval of a request from
Mystique Casino to spend funds from the Dubuque Racing
Association Depreciation and Improvement Fund to
construct a patio and pergola in the area between the Hilton
Garden Inn and Houlihan's Restaurant to meet required
Hilton standards.
SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Approve
ATTACHMENTS:
Description Type
Mystique Casino Request to Cosntruct Outside Patio City Manager Memo
and Pergola-MVM Memo
Mystique Casino Request Supporting Documentation
THE CITY OF Dubuque
UBE I
erica .i
Masterpiece on the Mississippi 2007-2012-2013
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Mystique Casino Request to Construct Outside Patio and Pergola
DATE: May 10, 2016
As required by the Amended and Restated Lease Agreement between the City of
Dubuque and the Dubuque Racing Ltd, Dubuque Racing Association President and
CEO Jesus Aviles requests City Council approval to spend funds from the Dubuque
Racing Association Depreciation and Improvement Fund to construct a patio and
pergola in the area between the hotel and Houlihan's Restaurant to meet required Hilton
standards. The total cost of the project is $37,800.96 and the funds are available in the
Dubuque Racing Association Depreciation and Improvement Fund.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Micliael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Jesus M. Aviles, President and CEO, Dubuque Racing Association
� r
Date: May 10, 2016
To: The Honorable Mayor and City Council Members
CC: Michael C. Van Milligan, City Manager
From: Jesus M. Aviles, President and CEO/ Dubuque Racing Association
Issue: Outside Patio and Pergola
As required in the Amended and Restated lease Agreement between the City of Dubuque and
the Dubuque Racing LTD.,I am formally requesting City approval to construct a patio and
pergola in the area between the Hotel and Houlihan's Restaurant to meet required Hilton
standards. The area for this improvement is on the old landfill, the ground will have to be raised
by 8-10 inches to meet City code for ADA. This will also include removing and replacing the
patio and the entrances to both Houlihan's and the Hotel in that area. My recommendation for
this expenditure is $35,328.00 plus tax $2,472.96 for a total of$37,800.96.
Three bids were obtained for the concrete work and pergola construction. The Concrete bid will
be awarded to Manders Quality Concrete for $20,328.00, Pergola and gas line for firepit bid will
be awarded to Epic Construction for $15,000.00
The source of the funding for the project is the Depreciation and Improvement Fund (D&I Fund)
which has a balance of$729,153.64 and an available amount of$479,153.64 the required
minimum for the D&I Fund is $250,000 per the City/DRA Lease Agreement.
If you require additional information or further clarification, please contact me. Thank you for
your consideration in this manner.
MYSTIQUE
CASINO
1855 Greyhound Park Rd. -%*r Dubuque,IA 52001-%*v- 800-373-3647 -%`tri- www.mystiquedbq.com
Manders WAUTY Concrete INC. Estimate
11243 Oakland Farms Rd. Dubuque, Iowa 52003
563-590-2351 fax 563-583-0720 Date s ima a o.
03/31/16 2171
Name/Address
Dubuque Houlihans
1801 Greyhound Park Drive
Hilton Garden Inn
Dubuque IA 52001-2381
project
Patio/walk
Description Total
removel 495.00
14 ton of stone 235.00
patio 22' X 34' = 734 sq.ft. X (9.00) 6,732.00
beige stamped, seamless stone 5"thick,w/rod 2'o/c
new walk to patio 8' X 8' 400.00
4 piers for pergola 16" X 16" X 4' 1,000.00
front walk 12' X 15'6" = 186 sq.ft, X (10.00) 1,860.00
removel and pour, beige stamped stone
front patio 16' X 24' = 384 sq.ft. X (10.00) 3,840.00
removel and pour, stamped, beige stone
sidewalk and door pad removel and pour 5"thick w/rod 5,766.00
8' X 110' = 880 8'6" X 9' 6" 961 sq.ft.
'►CoUtlfGess, WIS-e-P-0 d-efails ar-e o f f-eo f- -e di f fer,etice Total $20,328.00
b,efW-9_,ev► OA-edIOGY_e 00d 0A6J901f 1'c.et1f.
-we appreciate your business-
D & D Concrete Inc. Estimate
P.O Box 3040
Dubuque Iowa Date Estimate#
52004-3040 4/28/2016 1698
Name/Address
Estimating
Due Date Project JOB NAME
4/28/2016 Houlihans
Description Qty Cost Total
REMOVAL OF EXISTING AND PLACE 15 TON STONE 1 800.00 800.00
PATIO 22'X 34'BEIGR COLOR SEAMLESS STAMP s"THICK 734 10.00 7,340.00
WITH ROD
NEW WALK TO PATIO 8'X 8' 64 7.00 448.00
4 PIERS 16"X 16"X 4' 4 300.00 1,200.00
FRONT WALK 12'X 15.5'REMOVAL AND REPLACE WITH 6" 384 12.00 4,608.00
THICK BEIGE STAMPED
REMOVE AND REPLACE SIDEWALK AND DOOR PAD 5" 961 7.00 6,727.00
THICK WITH ROD 8'X 110'AND 8.5'X 9.5'
Thank You For The Opportunity To Quote Your Project If You Have Any Questions At All
Please Call!!! Total $21,123.00
Signature
D&D SUPERIOR CONCRETE www.ddeoncreteinc.com
Phone# Fax# E-mail Web Site
563-584-0997 553-584-9646 dague7@mchsi.com www.ddconcreteinc.com
PROPOSAL
Concrete Construction
Concrete Pumping /Telebelting
15712 Key City Ln.
Peosta, IA 52068
C 0 M C R
NAME I ADDRESS DATE Location/Job
Ken Haugen 4/22/2016 Houlihans
Hilton Garden Inn
1801 Grey Hound Park Dr.
Dubuque,IA 52001
DESCRIPTION
734 sq ft.5"Stamped Patio w/rod
64 sq ft.Sidewalk to Patio w/4 pergola piers
186 sq ft.Stamped Front sidewalk
384 sq ft.Stamped Front patio
880 sq ft.5"Sidewalk, w/961 sq ft.Door pad w/rod
Removal included.
TOTAL $23,042.00
All sites must be acceptable to truck traffic.All grades+or-1/10th inch per foot.All
materials guaranteed to be as specified.All work to be completed in a workmanlike manner
according to standard.practices.Any alteration or deviation from above specifications
involving extra costs,will be executed only upon consent of owner,and will become an
extra charge over and above the estimate.Increases in cost of material to contractor after
date of proposal will be passed on to and paid by owner as additional costs.All agreements
SIGNATURE
it
r
Epic C—pnstruction ----------------
" ' 1
April 21, 2016
j Ken Haugen
Hilton Garden Inn
1801 Greyhound Park Drive
Dubuque, IA 52001
Reference: Pergola for Outdoor Terrace Project
Ken
Thank you for the opportunity to quote the Pergola for your outdoor terrace project.The scope of work and pricing is
listed below and is based on the drawing supplied to us by Carver&Associates dated 3-11-16. If you have any questions
feel free to give me a call.
Scope of Work
Pergola Framing
' Asphalt Shingle Roof to Match Hotel
Aluminum Soffit and Facia to Match Hotel
Gutter and Downspouts to Match Hotel
Stone Veneer at Pergola Columns to Match Hotel
Gas Piping for Fire Pit
All of the above for the sum of$15,000.
Exclusions
Concrete Piers and Flatwork by Concrete Contractor
Fire Pit and Furniture by Owner
I
3749 Killian Lane ( PO Box 249 1 Kieler,Wisconsin 53812 p.608.568.7577 f.608.568.3259 www.epicgc.com
I
i
I
i
Thill Construction
4844 Hwy 61
Potosi, WI 53820
Ken Haugen
1801 Greyhound Park Drive
Dubuque, IA 52001
Hilton Garden Inn Outdoor Terrace
Drawings by Carver &Associates
Complete Pergola Including Framing, Roofing, Sheet Metal,
and Stone Columns. Includes Gas Piping for Fire Pit.
Materials to Match Existing Hotel
Furniture by Owner
Concrete by Others I
_— ._.............._......._.................__............... ..........
Tom Thill — (563)-590-4670
07-75I
T�3TAl
- --
raX lncludi;d
Signatures
Your Name Date Client's Name Date
i
I
6517 N WILSHIRE LANE
Klein Construction Company DUBUQUE IA 52003
Hilton Garden Inn
ESTIMATE / 4-21-2016
KEN HAUGEN ESTIMATED COST
1801 GREYHOUND PARK DR $ 161288 -00 DUBUQUE IA 52001
11 11 a • k,FeTTA' 1 • 096 ' ." 1:1:j
" • •
• • I ' ' I D •
WE WILL INCLUDE GAS PIPING FOR OWNERS FIREPIT
& PERGOLA FRAMING.
C ALL MATERIALS ON JOB TO MATCH EXISTING HOTEL j
i
THIS PRICE DOES NOT INCLUDE ANY CONCRETE
I WORK OR PIERS FOR PERGOLA
FURNITURE BY OWNER
ANY QUESTIONS CALL THANKS
RON KLEIN 213-0473
TOTAL $16,288.00
Discount-0% 50.00
I
i
Terms & Conditions
Signatures
Your Name Date Client's Name Date
I
I
Dubuque
M-Amesica City
1I 1'
Masterpiece on the Mississippi 2007 • 2012 • 2013
Mr. Jesus M. Aviles
Dubuque Racing Association
1855 Greyhound Park Road
Dubuque, IA 52001
Re: Outside Patio and Pergola
Mr. Aviles,
City Clerk's Office
City Hall
50 W. 13th Street
Dubuque, IA 52001-4864
(563) 589-4100 office
(563) 589-0890 fax
ctyclerk@cityofdubuque.org
www.cityofdubuque.org
May 17, 2016
At their meeting of May 16, 2016, the Dubuque City Council approved your request for
use of Depreciation and Improvement (D&I) funds for the construction of an outside
patio and pergola area between the Hotel and Houlihan's restaurant as outlined in your
letter of May 10, 2016.
Thank you.
Kevin S. Firnstahl, CMC
City Clerk
cc: Michael C. Van Milligen, City Manager
/ksf