Dubuque Industrial Center South - Verena Court Project Award Copyright 2014
City of Dubuque Action Items # 5.
ITEM TITLE: Dubuque Industrial Center South -Verena Court Project
Award
SUMMARY: City Manager recommending award of the construction
contract for the Dubuque Industrial Center South -Verena
Court Project to the low bidder Drew Cook and Sons
Excavating.
RESOLUTION Awarding Public Improvement Contract for
the Verena Court Project
SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt
Resolution(s)
ATTACHMENTS:
Description Type
Verena Court Project-MVM Memo City Manager Memo
Staff Memo Staff Memo
Resolution Resolutions
Bid Tab Supporting Documentation
THE CITY OF Dubuque
UBE I
erica .i
Masterpiece on the Mississippi 2007-2012-2013
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Dubuque Industrial Center South —Verena Court Project
DATE: May 10, 2016
Sealed bids were received for the Dubuque Industrial Center South, Verena Court
Project. City Engineer Gus Psihoyos recommends award of the construction contract to
the low bidder, Drew Cook and Sons Excavating, in the amount of $193,735.50, which
is 4.5% under the estimate of probable cost.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Micliael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Gus Psihoyos, City Engineer
buque
THE CITY OF ,. Du
M-fteftaCKV
1111.1
Masterpiece on the Mississippi 2007.2012.2013
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: Dubuque Industrial Center South - Verena Court Project
CIP 3602160
DATE: May 9, 2016
INTRODUCTION
The enclosed resolution authorizes the award of the construction contract for the Dubuque
Industrial Center South, Verena Court Project.
BACKGROUND
In Section 3.3(3) of the Development Agreement with Roasting Solutions (Developer), the
City committed to construct an entrance road at City's cost. IIW, P.C. had been contracted
by the Developer to provide construction drawings for the construction of its new facility in
the South Siegert Farm area of the Dubuque Industrial Center Economic Development
District. As such, IIW, P.C. was in possession of many preparatory documents that were
used to facilitate the design of the entrance road required by the Development Agreement.
The City secured the services of IIW, P.C. to design the street improvements for Verena
Court to expedite the project to meet the developer's project schedule.
DISCUSSION
This project provides for construction of a cul-de-sac to serve the Verena Street Coffee
development and future development in the Dubuque Industrial Center South off of Seippel
Road. The project will include 9" PCC pavement, 5' wide sidewalk, curb and gutter and
storm sewer. The project also includes a streetlight to illuminate the cul-de-sac.
BID RESULTS
The City of Dubuque received the following bids for the Dubuque Industrial Center South,
Verena Court Project, on May 5, 2015:
Contractor Bid Results
Drew Cook and Sons Excavating $ 193,735.50
Eastern Iowa Excavating $ 202,179.55
Top Grade Excavating $ 209,245.00
McDermott Excavating $ 213,601.50
Horsfield Construction $ 215,462.00
Tschiggfrie Excavating $ 269,609.65
Drew Cook and Sons Excavating of Dubuque, Iowa, submitted the low bid in the amount of
$193,735.50. This amount is 4.5% under the estimate of probable cost.
RECOMMENDATION
I recommend that the Contract for the Dubuque Industrial Center South, Verena Court
Project be awarded to Drew Cook and Sons Excavating, Inc. of Dubuque, Iowa in the
amount of $193,735.50 which is 4.5% under the engineer's estimate of probable cost.
BUDGETIMPACT
The estimate of probable cost for Dubuque Industrial Center South, Verena Court Project is
summarized as follows:
Estimate Award
Verena Court Project $ 202,870.00 $ 193,735.50
Contingency 20,287.00 $ 20.287.00
Engineering Design, Administration & Inspection 22,000.00 22,000.00
Total Project Cost $ 245,157.00 $ 236,022.50
The funding summary for the Dubuque Industrial Center South, Verena Court Project is as
follows:
CIP No. Fund Description Fund Amount
3602160 Design South Siegert Farm $ 236,022.50
ACTION TO BE TAKEN
I recommend that the City Council adopt the attached resolution awarding for the Dubuque
Industrial Center South, Verena Court Project to Drew Cook and Sons Excavating, Inc. in
the amount of$193,735.50.
Prepared By: Jon Dienst, P.E.
cc: Jenny Larson, Budget Director
Maurice Jones, Economic Development Director
Jill Connors, Economic Development Project Coordinator
2
RESOLUTION NO. 199-16
AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE
VERENA COURT PROJECT
Whereas, sealed proposals have been submitted by contractors for the Verena
Court Project, (the Project) pursuant to Resolution No. 153-16 and Notice to Bidders
published in a newspaper published in the City of Dubuque, Iowa on the 22nd day of
April, 2016.
Whereas, said sealed proposals were opened and read on the 5th day of May,
2016 and it has been determined that Drew Cook and Sons Excavating, Inc. of
Dubuque, Iowa, with a bid in the amount of $193,735.50 is the lowest responsive,
responsible bidder for the Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That a Public Improvement Contract for the Project is hereby awarded to Drew
Cook and Sons Excavating, Inc. and the City Manager is hereby directed to execute a
Public Improvement Contract on behalf of the City of Dubuque for the Project.
Passed, approved and adopted this 16th day of May, 2016.
Attest:
Kevin t. irnstahl, CM ity Clerk
Roy D. Buol, Mayor
THE CITY OF 67�
DUB E
Ma9kIpINL qI the M1881a81pp1
Cour N Total love
Bid iabuloon
Pm$etlMarre: Verem Cut Improvements Bid Data En Eerimare Orew Cook Excrvdin Eaerem Iowa Excrvdin io Gatle Excaarin MCOemotl Excmalin Horsfeltl Conermcrion iecbi Excmalin
5May16LNE 9inee(e 9 9 P 9 9 99Fne 9
ISTIMATID BID BID BID
MIO RNUMERE BIO REMOESCRIPTIOM VOGMTIITv BMIi UNIT PRICE 10iPL PRICE RNIi PNCE 10iPL PRICE RNIi PRICE 10iPL PNCE RNIi PRICE 10iPL PRICE UNIT PRICE 10iPL PRICE UNIT PRICE 10iPL PRICE UNIT PRICE 10iPL PRICE
olalson i-Gel Pmalsons
1 10901054 Mobllallon 1 LO $ 8,00000 $ 8,00600 $ 3,48200 $ 3,48200 $ 10,000.00 $ 10,000.00 $ 1950000 $ 19,50000 $ ]20000 $ ]200.00 $ 28,00600 $ 28,00600 $ 18,80000 $ 18,80000
Sub Thal $ 8,00000 Sub Total $ 3,48200 Sub Total $ 10,000.00 Sub Total $ 1950000 Sub Total $ ]200.00 Sub Total $ 28,00000 Sub Total $ 18,80000
olalsont%8-tantamount,Su graoe,and Subbase
2 2010108AT Clearing and Grubbing A 1 LO $ 50000 $ 50000 $ 15000 $ 15000 $ 4,050.00 $ 4,050.00 $ 85000 $ 85000 $ 50000 $ 500.00 $ 1,00000 $ 1,00000 $ 2,]1000 $ 2,]1000
3 2010108D1 TopsetOnsite 396 CY $ 600 $ 237600 $ 1000 $ 3,96000 $ 14.00 $ 5544.00 $ 7 00 $ 2,]]200 $ 1150 $ 4554.00 $ 1400 $ 554400 $ 1155 $ 4,5]380
4 2010108ET Excavation,CIass10 1140 CY $ 000 $ 9,12000 $ 900 $ 1026000 $ ]25 $ 8265.00 $ 950 $ 10,83000 $ 1100 $ 12540.00 $ ].00 $ 798000 $ 2195 $ 25,023.00
5 -2- 108 BelOwGatle Excavation(Coro ON) 18 TON $ 1000 $ 320.00 $ 2000 $ 36000 $ 39.65 $ 713 70 $ 4000 $ 72000 $ 30.00 $ 540.00 $ 5000 $ 90000 $ 4255 $ 76590
6 2010108GO Gubgaae Preparation 1810 eY $ 100 $ 1,81000 $ 150 $ 2,]1500 $ 1.15 $ 2,081 50 $ 005 $ 9050 $ 250 $ 4,525.00 $ 250 $ 4 525 00 $ 240 $ 434400
2010108 1A Subbase,Granular SubbaseGradation12a 1100 TON $ 1600 $ 1],60000 $ 1400 $ 15,40000 $ 1650 $ 18,150.00 $ 1475 $ 16225.00 $ 1000 $ 19,800.00 $ 1].00 $ 1070000 $ 2200 $ 2420000
Sub Tend $ 3173000 Sub Total $ 32,84500 Sub Total $ 38,80420 Sub Total $ 31,48]50 Sub Total $ 42,459.00 Sub Total $ 38,64900 Sub Total $ 61,616]0
olalson 3010ReachExeaaallon and BatlifiII
8 3010108D0 Bedding Malarial Gradation 3 88 TON $ 1000 $ 88000 $ 1900 $ 1,6]200 $ 26.65 $ 2 345 20 $ 17 00 $ 1,49600 $ 2200 $ 1,936.00 $ 1500 $ 132000 $ 1015 $ 1,59]20
9 3010108-2 Trenching,261 nor Depth 220 LF $ 300 $ 66000 $ 500 $ 1,10000 $ 3.85 $ 84].00 $ 000 $ 1,]6000 $ 6.00 $ 1320.00 $ 600 $ 1 320 00 $ 075 $ 1,925.00
SubTotal $ 154000 SubTotal $ 2,]]200 Sub Total $ 3,19220 Sub Total $ 325600 Sub Total $ 3256.00 Sub Total $ 2,64000 Sub Total $ 352220
Omison48m-Smrmsexas
10 4020108A-1 65 LF $ 5 525 00 $ 5350 $ 3 4750 $ 72 00 $ 4,680.00 $ 9200 $ 5,98000 $ 5400 $ 3510.00 $ 5800 $ 3,]]000 $ 9620 $ 625300
Sub Total $ 5 525 00 Sub Total $ 3 47750 Sub Total $ 4,680.00 Sub Total $ 5,98000 Sub Total $ 3510.00 Sub Total $ 3 7700 Sub Total $ 6253.00
olalson48ID-Pipe CulaeNe
11 4030108Ai PNe Culvert Trenched 24 RCP 101 LF $ 8500 $ 058500 $ 5350 $ 5,40350 $ 72 00 $ ]2]200 $ 9200 $ 929200 $ 5400 $ 5,454.00 $ 5800 $ 5,85000 $ 9620 $ 9,]1620
12 4030108BE PNeApmn,24"RCP 4 EA $ 40000 $ 1,60000 $ 85000 $ 3,40000 $ 1300.00 $ 5200.00 $ 120000 $ 4,80000 $ 1,45000 $ 5,800.00 $ 90000 $ 3,60000 $ 95000 $ 3,80000
13 4030108CO Fooling for Concrete Pipe Apron,24 RCP 4 EA $ 80000 $ 3 200 00 $ 37500 $ 150000 $ 600.00 $ 2,400.00 $ 55000 $ 220000 $ 65000 $ 2,600.00 $ 60000 $ 2,40000 $ 40000 $ 1,60000
14 4030108D0 PNe Apron GuaN,24 RCP 4 EA $ 20000 $ 80000 $ 65000 $ 2,60000 $ 1,015.00 $ 4,060.00 $ 75000 $ 3,00000 $ 85000 $ 3,400.00 $ 700 00 $ 2,80000 $ 72000 $ 2,88000
SubTotal $ 14,18500 SubTotal $ 12,90350 Sub Total $ 109200 Sub Total $ 1929200 Sub Total $ 1]254.00 Sub Total $ 14,65000 Sub Total $ 1],99620
olalson 4848-Su brain and Footing omm Collatars
15 4040108AT Crouton,6"Perforated CPE 550 LF $ 900 $ 4 950 00 $ 925 $ 5,08]50 $ 13.00 $ ],150.00 $ 935 $ 514250 $ 1025 $ 5,63]50 $ 1000 $ 550000 $ 1550 $ 8525.00
16 4040108D0 Crouton ONlssana C0nnedions,Core Drill,6 3 EA $ 11500 $ 34500 $ 7500 $ 225.00 $ 215.00 $ 645.00 $ 40000 $ 120000 $ 27500 $ 825.00 $ 30000 $ 90000 $ 99000 $ 2,9]000
Sub Total $ 5 295 00 Sub Total $ 531250 Sub Total $ ]]95.00 Sub Total $ 634250 Sub Total $ 6,46250 Sub Total $ 6,40000 Sub Total $ 11,49500
olalson 6%8-Strutloeslor SanllaryandSlonm Senae
P 6010108BE Intake Type,CIP,SW505 2 VF $ 4,00000 $ 8,00000 $ 3,]5000 $ ]50000 $ 4,150.00 $ 0300.00 $ 3,80000 $ ],60000 $ 2,90500 $ 5,810.00 $ 3,40000 $ 6,80000 $ 1,11000 $ 222000
Subtotal $ 8,00000 Sub Total $ ]50000 Sub Total $ 0300.00 Sub Total $ ],60000 Sub Total $ 5,810.00 Sub Total $ 6,80000 Sub Total $ 222000
olalson]%8-PoNlano Genera Co metePaaeincena
18 7010108AT Pavement PCC,9"(IMckness) 1590 SY $ 5200 $ 82,68000 $ 5600 $ 89,04000 $ 42 75 $ 6]9]250 $ 4000 $ 76 320 $ 5300 $ 842]0.00 $ 4900 $ ]]91000 $ 6265 $ 99,61350
19 70101080 PCCPavement Samplesana Tesling 1 LS $ 250000 $ 2 500 00 $ 1,60000 $ 1,60000 $ 6!5.00 $ 6!5.00 $ 1,10000 $ 1,10000 $ 2,60000 $ 2,600.00 $ 750 00 $ 75000 $ 1,65000 $ 1,65000
Sub Total $ 85,18000 Sub Total $ 90,64000 Sub Total $ 68,64]50 Sub Total $ ]],42000 Sub Total $ 86,8]0.00 Sub Total $ ]8,66000 Sub Total $ 101 263 50
olalson 7030 Sidewalks,Sbareo use Pan;and onaeaays
20 7030108ET Sltlevalk,PCC,6"(IMckness) 299 SY $ 3000 $ 11 362 00 $ 47 00 $ 14,05300 $ 3435 $ 102]0.65 $ 37 00 $ 11,063.00 $ 4150 $ 12,40050 $ 3800 $ 11 362 00 $ 3970 $ 11,8]030
21 7030108GO Detectable War 32 SF $ 3500 $ 1,12000 $ 3200 $ 1,02400 $ 3050 $ 1 232 00 $ 37 00 $ 118400 $ 37 00 $ 1184.00 $ 3400 $ 1,08000 $ 5280 $ 1,68960
22 ]030108-0 Sltlevalk Assurance Testing 1 LS $ 1,00000 $ 1,00000 $ 15000 $ 15000 $ 450.00 $ 450.00 $ 60000 $ 60000 $ 2,40000 $ 2,400.00 $ 1,00000 $ 1,00000 $ 1,10000 $ 1,10000
23 ]03olotH1 OrNevay,Paved PCC,9"(IMckneas) 36 SY $ 5600 $ 2,01600 $ 5600 $ 2,01600 $ 61.00 $ 2,196.00 $ 4000 $ 1,]2000 $ 53.00 $ 1,908.00 $ 4900 $ 1 7600 $ 7685 $ 2,]6660
_ SubTotal $ 15,49800 Sub Total $ 1]24300 Sub Total $ 14,148.65 Sub Total $ 14,5]500 Sub Total $ 1],90050 Sub Total $ 1521400 Sub Total $ 1],42650
olalson 7040 reveal Remairdaybon
24 704010810 RemovalPavement126 SY $ 1600 $ 2,01600 $ 1300 $ 1,63000 $ 11.]5 $ 1,48050 $ 1400 $ 176400 $ 1100 $ 1386.00 $ 1000 $ 126000 $ 1020 $ 229320
Sub Total $ 2,01600 Sub Total $ 1,63000 Sub Total $ 1,48050 Sub Total $ 1,]6400 Sub Total $ 1386.00 Sub Total $ 126000 Sub Total $ 229320
olalson 8010TrafficSlgmis8 GgMing
25 8010108A1 Hanaholle,PC,Round 1 EA $ 120000 $ 1 200 00 $ 56000 $ 56000 $ 925.00 $ 925.00 $ 135000 $ 135000 $ 65000 $ 650.00 $ 1 500 00 $ 150000 $ 76000 $ 76000
26 8010108A2 Hanaholle,Composite,Small 1 EA $ 35000 $ 35000 $ 47500 $ 47500 $ 395.00 $ 395.00 $ 75000 $ 75000 $ 65000 $ 650.00 $ 1,10000 $ 1,10000 $ ]]600 $ ]]600
P 801010881 Cement Trenched PVC,2" 220 LF $ 450 $ 99000 $ 320 $ 70400 $ ]25 $ 1595.00 $ 300 $ 66000 $ 3.15 $ 693.00 $ 350 $ ]]000 $ 905 $ 1,99100
28 801010800 Wine and Cable-Povsr 220 LF $ 150 $ 33000 $ 260 $ 57200 $ 1.05 $ 231.00 $ 080 $ 17600 $ 280 $ 616.00 $ 1.00 $ 22000 $ 275 $ 60500
29 801010801 Street Light Precast Concrete Base,20h.z]' 1 EA $ 120000 $ 1 200 00 $ 1,02000 $ 1,02000 $ 1335.00 $ 1335.00 $ 1 7500 $ 1,]5000 $ 1,40000 $ 1,400.00 $ 1,00000 $ 1,00000 $ 1,80600 $ 1,80600
30 35'Street Light P Ole Assembly 1 EA $ 3,00000 $ 3,00000 $ 350000 $ 350000 $ 3350.00 $ 3350.00 $ 295000 $ 2,95000 $ 3,60000 $ 3,600.00 $ 3 200 00 $ 320000 $ 3,85000 $ 3,85000
31 8010 108 11 Removal-Evaue Hanaholle 1 EA $ 10000 $ 10000 $ 30000 $ 30000 $ 2]5.00 $ 2]5.00 $ 15000 $ 15000 $ 50000 $ 500.00 $ 55000 $ 55000 $ 51000 $ 51000
32 8010.10812 Rem Oval-Relocate E ling Light P We and P beast Concrete Base 1 EA $ 1,00000 $ 1,00000 $ 155000 $ 155000 $ 2,100.00 $ 2,100.00 $ 295000 $ 2,95000 $ 1,]0000 $ 1,]00.00 $ 2 500 00 $ 250000 $ 1,88000 $ 1,88000
Sub Total $ 8,1]000 Sub Total $ 8,68100 Sub Total $ 10206.00 Sub Total $ 10,]3600 Sub Total $ 9,809.00 Sub Total $ 10,84000 Sub Total $ 12,1]000
MET olalson 2528-Traffic Carl
33 IOOT 252804A Traffic Control 1 LS $ 1,00000 $ 1,00000 $ 50000 $ 50000 $ 850.00 $ 850.00 $ 85000 $ 85000 $ 90000 $ 900.00 $ 750 00 $ 75000 $ 83000 $ 83000
Sub Total $ 1,00000 Sub Total $ 50000 Sub Total $ 850,00 Sub Total $ 85000 Sub Total $ 900,00 Sub Total $ 75000 Sub Total $ 83000
Project Name: Verena Court Improvements Bid Date Engineers Ys Estimate Drew Cook Excavatio Eastern Iowa Excavatio To Grace Excavatio McDermott Excavatio Horafeld Construction Tschi fne Excavatio
pmvemen 5-Mayate 9 9 9 P 9 9 99 9
L INMATED BID BID BID BID BID BID
NOE R NUMBERS BID ITEM DESCRIPTION
gUANTITY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE FEST- FTOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICEE UNIT PRICE TOTAL PRICE
Division 9010-Seeding
34 8919-108-A-0 Conventional Seeding Fertilizing,and Mulching,Type 1 0.5 AC $ 5,000.00 $ 2,500.00 $ 4,000.00 $ 2,000.00 $ 7200.00 $ 3,600.00 $ 4,500.00 $ 2,250.00 $ 4,400.00 $ 2,200.00 $ 4,000.00 $ 2,000.00 $ 4,400.00 $ 2,200.00
35 0010-108-D0 Watering 86 MGAL $ 6.00 $ 516.00 $ 1.00 $ 86.00 $ 16.00 $ 1,376.00 $ 8.00 $ 688.00 $ 1.10 $ 94.60 $ 1.00 $ 86.00 $ 1.10 $ 94.60
36 0010-108-E-0 Warranty 1 ITS $ 2,000.00 $ 2,000.00 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 1,400.00 $ 1,400.00 $ 550.00 $ 550.00 $ 500.00 $ 500.00 $ 550.00 $ 550.00
Sub Total $ 5,016.00 Sub Total $ 2,586.00 Sub Total $ 5,976.00 Sub Total $ 4,338.00 Sub Total $ 2,844.60 Sub Total $ 2,586.00 Sub Total $ 2,844.60
Division 9040-Erosion and Sediment Control
37 0040-108-A-1 SWEEP Preparation 1 ITS $ 2,000.00 $ 2,000.00 $ 650.00 $ 650.00 $ 500.00 $ 500.00 $ 850.00 $ 850.00 $ 500.00 $ 500.00 $ 500.00 $ 500.00 $ 2,200.00 $ 2,200.00
38 0040-108-A-2 SWEEP Management 1 ITS $ 1,000.00 $ 1,000.00 $ 400.00 $ 400.00 $ 800.00 $ 800.00 $ 850.00 $ 850.00 $ 750.00 $ 750.00 $ 750.00 $ 750.00 $ 1,320.00 $ 1,320.00
30 0040-108-A-3 SWEEP Qualifying Rainfall Event Inspection 10 EA $ 200.00 $ 2,000.00 $ 35.00 $ 350.00 $ 55.00 $ 550.00 $ 50.00 $ 500.00 $ 50.00 $ 500.00 $ 30.00 $ 300.00 $ 110.00 $ 1100.00
40 0040-108-F-1 Wattles,Wood Fiber,9 370 LF $ 2.00 $ 740.00 $ 1.00 $ 370.00 $ 3.00 $ 1110.00 $ 4.00 $ 1,480.00 $ 3.00 $ 1110.00 $ 1.00 $ 370.00 $ 1.10 $ 40].00
41 0040-108-F-2 Wattles,Removal 370 LF $ 050 $ 185.00 $ 0.10 $ 3].00 $ 125 $ 46250 $ 020 $ 74.00 $ 1.00 $ 370.00 $ 1.00 $ 370.00 $ 0.10 $ 3].00
42 0040-108 G-1 Check Dams,Rock 9 TON $ 20.00 $ 180.00 $ 22.00 $ 198.00 $ 5].00 $ 513.00 $ 30.00 $ 270.00 $ 40.00 $ 360.00 $ 35.00 $ 315.00 $ 44 75 $ 402 75
43 0040-108J0 Rip Rap,Class 40 TON $ 30.00 $ 1,200.00 $ 22.00 $ 880.00 $ 4125 $ 1,650.00 $ 35.00 $ 1,400.00 $ 22.00 $ 880.00 7-25 Pit $ 1,000.00 $ 54.05 $ 2162.00
44 0040-108-01 Stabilized Construction Entrance A 9 SQ $ 200.00 $ 1,800.00 $ 60.00 $ 540.00 $ 188.00 $ 1,692.00 $ 30.00 $ 270.00 $ 225.00 $ 2,025.00 $ 100.00 $ 900.00 $ 271.00 $ 2,439.00
45 0040-108-E-0 Temporary PIECE Type W 215 SY $ 10.00 $ 2150.00 $ 2.00 $ 430.00 $ 6.00 $ 1,290.00 $ 120 $ 258.00 $ 3.00 $ 645.00 7-2 Pit $ 430.00 $ 220 $ 473.00
46 0040-108-T-1 Inlet Protection Device,Surface Applied 2 EA $ 150.00 $ 300.00 $ 100.00 $ 200.00 $ 180.00 $ 360.00 $ 75.00 $ 150.00 $ 200.00 $ 400.00 $ 100.00 $ 200.00 $ 110.00 $ 220.00
47 0040-108-T-2 Inlet Protection Device,Maintenance 2 EA $ 80.00 $ 160.00 $ 50.00 $ 100.00 $ 120.00 $ 240.00 $ 1.00 $ 2.00 $ 200.00 $ 400.00 7-5o Pit $ 100.00 $ 55.00 $ 110.00
Sub Total $ 11,715.00 Sub Total $ 4155.00 Sub Total $ 9167 50 Sub Total $ 6104.00 Sub Total $ 7 940.00 Sub Total $ 5,235.00 Sub Total $ 10,870 75
Total Est. $ 202,870.00 Total Bid $ 193,73550 Total Bid $ 202 179 55 Total Bid $ 209,245.00 Total Bid $ 213,601.60 Total Bid $ 215,462.00 Total Bid $ 269,609.65
%Over/Under R) -450% -0 34% 3.14% 529% 621% 32 90%
Total Bid Amount $ 202,870.00 $ 193,73550 $ 202 179 55 $ 209,245.00 $ 213,601.60 $ 215,462.00 $ 269,609.65
Total Selected Alternates)Amount $ $ $ $ $ $ $
Contract Award Amount: $ 202,870.00 $ 193,73550 $ 202 179 55 $ 209,245.00 $ 213,601.60 $ 215,462.00 $ 269,609.65