Loading...
IDOT Emergency Detour Route Agreement - 3rd Street Bridge Copyright 2014 City of Dubuque Consent Items # 15. ITEM TITLE: I DOT Emergency Detour Route Agreement-3rd Street Bridge SUMMARY: City Manager recommending approval for the Mayor to execute an agreement with the Iowa DOT for the use of local roads as an authorized detour route for the 3rd Street Bridge Overpass Deck Joint Repair Project scheduled for mid September 2016. RESOLUTION Approving the Iowa Department of Transportation Agreement for use of local agency roads as a detour route for the 3rd Street Bridge Overpass Deck Joint Repair Project over US 52/61/151 SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type 3rd Street Bridge Overpass Deck Joint Repair Local City Manager Memo Road Detour Route Agreement-MVM Memo Staff Memo Staff Memo Resolution Resolutions Iowa DOT Agreement Supporting Documentation THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 3rd Street Bridge Overpass Deck Joint Repair Project Iowa Department of Transportation — Local Road Detour Route Agreement DATE: May 31, 2016 The Iowa Department of Transportation (DOT) will be doing deck joint repairs on the 3rd Street Bridge over US 52/61/151. It will be necessary for the Iowa DOT to close the 3rd Street overpass during construction and detour traffic onto local roads. The Iowa DOT will furnish and install the required barricades and signing for the closure and will remove same upon completion of the project. The project is scheduled to begin sometime after September 12 (after Labor Day) with bridge closure authorized to start on a Monday morning and re-opened by the following Friday afternoon. During the Monday-Friday closure, traffic will be detoured. Assistant City Engineer Bob Schiesl recommends City Council approval for the Mayor to execute an agreement with the Iowa DOT for the use of local roads as an authorized detour route for the 3rd Street Bridge Overpass Deck Joint Repair Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Bob Schiesl, Assistant City Engineer THE CITY OF Dubuque UB3 §k-E 111 111-America CiI.ti Masterpiece on the Mississippi 2007-2012-2013 TO: Michael C. Van Milligen Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer SUBJECT: 3rd Street Bridge Overpass Deck Joint Repair Project Iowa Department of Transportation — Local Road Detour Route Agreement DATE: May 31, 2016 INTRODUCTION The enclosed resolution authorizes the Mayor to execute an agreement with the Iowa Department of Transportation (Iowa DOT) for the use of local roads as an authorized detour route for the 3rd Street Bridge Overpass Deck Joint Repair Project. DISCUSSION The Iowa DOT will be doing deck joint repairs on the 3rd Street Bridge over US 52/61/151. It will be necessary for the Iowa DOT to close the 3rd Street overpass during construction and detour traffic onto local roads. The Iowa DOT will furnish and install the required barricades and signing for the closure and will remove same upon completion of the project. The project is scheduled to begin sometime after September 12 (after Labor Day) with bridge closure authorized to start on a Monday morning and re-opened by the following Friday afternoon. During the Monday-Friday closure, traffic will be detoured. RECOMMENDATION I recommend that the City Council authorize the Mayor to execute an agreement with the Iowa Department of Transportation for the use of local roads as an authorized detour route for the 3rd Street Bridge Overpass Deck Joint Repair Project. ACTION TO BE TAKEN The City Council is requested to authorize the Mayor to execute an agreement with the Iowa Department of Transportation for the use of local roads as an authorized detour route for the 3rd Street Bridge Overpass Deck Joint Repair Project through the adoption of the enclosed resolution. Prepared by Robert Schiesl, Assistant City Engineer cc: Mark Dalsing, Chief of Police Rick Steines, Fire Chief Dave Ness, Civil Engineer John Klostermann, Director of Public Works Jim Schnoebelen, Iowa DOT RESOLUTION NO. 206-16 RESOLUTION APPROVING THE IOWA DEPARTMENT OF TRANSPORTATION AGREEMENT FOR USE OF LOCAL AGENCY ROADS AS A DETOUR ROUTE FOR THE 3RD STREET BRIDGE OVERPASS DECK JOINT REPAIR PROJECT OVER US 52/61/151 Whereas, the Iowa Department of Transportation is proceeding with the 3rd Street Bridge Overpass Deck Joint Repair Project over US 52/61/151. Whereas, the project would require the use of local agency roads as a detour route. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That said Agreement for Use of Local Agency Roads as a detour route with the Iowa Department of Transportation is hereby approved for the 3rd Street Bridge Overpass Deck Joint Repair Project. Section 2. That the Mayor be authorized and directed to execute two copies of said Agreement for Use of Local Agency Roads as a detour route with the Iowa Department of Transportation for the 3rd Street Bridge Overpass Deck Joint Repair Project over US 52/61/151. Passed, approved and adopted this 6th day of June, 2016. Attest: Kevin(S. Firnstahl, CIBC, City Clerk Ric W. Jon Mayor Pro -Tem CJIOWADOT SMARTER 1 SIMPLER I CUSTOMER DRIVEN June 10, 2016 wwvv.iowadot.gov District 6 Office Highway Division 5455 Kirkwood Blvd. SW, Cedar Rapids, IA 52404 Phone: (319) 364-0235 1 Fax (319) 364-9614 1 Email: jim.schnoebelen@dotiowa.gov The Honorable Roy D. Buol Mayor - City of Dubuque City Hall — 50 West 13th Street Dubuque, Iowa 52001 REF: MB -052-6(507)47-77-31 Dubuque County City of Dubuque Agreement #: 2016-9-200 SUBJECT: Agreement 2016-9-200 FULLY EXECUTED (Deck joint repair on the 3rd Street bridge over U.S. 52/61/151 in Dubuque) Dear Mayor Buol: Attached is your original of the fully executed Agreement 2016-9-200 between the city of Dubuque, Dubuque County, Iowa and the Iowa Department of Transportation for the above referenced project. The project involves: Deck joint repair on the 3rd Street bridge over U.S. 52/61/151 in Dubuque. Thank you for your cooperation in the processing of this agreement. JRS/hmb Enclosure: Agreement 2016-9-200 cc: Deanne Popp, Local Systems - Ames Daryl Hart, Finance - Ames Sincerely, James. R. Schnoebelen, P. E. District 6 Engineer July 2014 IOWA DEPARTMENT OF TRANSPORTATION Preconstruction Agreement For Primary Road Project County Dubuque City Dubuque Project No. MB -052-6(507)47--77-31 Iowa DOT Agreement No. 2016-9-200 Staff Action No, N/A This Agreement, is entered into by and between the Iowa Department of Transportation, hereinafter designated the "DOT", and the city of Dubuque, Iowa, a Local Public Agency, hereafter designated the "LPA" in accordance with Iowa Code Chapters 28E, 306, 306A and 313.4 as applicable; The DOT proposes to establish or make improvements to U.S. 52 within Dubuque County, Iowa; and The DOT and the LPA are willing to jointly participate in said project, in the manner hereinafter provided; and This Agreement reflects the current concept of this project which is subject to modification by mutual agreement between the LPA and the DOT; and Therefore, it is agreed as follows: 1. Project Information a. The DOT will design, let, and inspect construction of the following described project in accordance with the project plans and DOT standard specifications: Deck joint repair on the 3rd Street bridge over U.S. 52/61/151 in Dubuque. 2. Project Costs a. The DOT will bear all costs except those allocated to the LPA under other terms of this Agreement. 3. Traffic Control a. U.S. 52 through -traffic will be maintained during the construction. b. It will be necessary to close 3rd Street during construction. The DOT will furnish and install the required barricades and signing for the closure at project cost and shall remove same upon completion of the project also at no expense or obligation to the LPA. The DOT will work in close cooperation with the LPA and the contractor to accommodate emergency services and local access across the project during construction. Any detours which may be necessary for project related LPA road closures will be the responsibility of the LPA all at no expense or obligation to the DOT. 4. Right of Way and Permits a. Subject to the provisions hereof, the LPA in accordance with 761 lowa Administrative Code Chapter 150.3(1)c and 150.4(2) will remove or cause to be removed (within the corporate limits) all encroachments or obstructions in the existing primary highway right of way. The LPA will also prevent the erection and/or placement of any structure or obstruction on said right of way or any additional 2016-9-200 Dubuque 1 July 2014 right of way which is acquired for this project including but not Limited to private signs, buildings, pumps, and parking areas. b. The DOT will be responsible for the coordination of utility facility adjustments for the primary road project. c. The LPA agrees to relocate all utilities necessary for construction which are located within the existing street or alley right of way, subject to the approval of and without expense to the DOT and in accordance with 761 Iowa Administrative Code Chapter 150.4(5) and the DOT Utility Accommodation Policy. d. With the exception of service connections no new or future utility occupancy of project right of way, nor any future relocations of or alterations to existing utilities within said right of way will be permitted or undertaken by the LPA without the prior written approval of the DOT. All work will be performed in accordance with the Utility Accommodation Policy and other applicable requirements of the DOT. 5. Construction & Maintenance a. The LPA, in cooperation with the DOT, will take whatever steps may be required with respect to alteration of the grade lines of the new highway facilities constructed under the project in accordance with Iowa Code section 364.15. The DOT and LPA will work together to minimize potential impacts to properties that may occur as a result of the project. b. Upon completion of the project, no changes in the physical features thereof will be undertaken or permitted without the prior written approval of the DOT. c. Future maintenance of the primary highway within the project area will be carried out in accordance with the terms and conditions contained in 761 Iowa Administrative Code Chapter 150. d. Structures built by the DOT over or under a primary road will be maintained structurally sound by the DOT, including repairs to floors and railing and painting. For structures serving roadways which are not on the primary road system, the cleaning and removal of snow, debris and foreign objects from local road traffic lanes, sidewalks or walkways within the project limits (if any) including pedestrian overpasses or underpasses will be the responsibility of the LPA. 6. General Provisions a. If the LPA has completed a Flood insurance Study (FIS) for an area which is affected by the proposed Primary Highway project and the FIS is modified, amended or revised in an area affected by the project after the date of this Agreement, the LPA shall promptly provide notice of the modification, amendment or revision to the DOT. If the LPA does not have a detailed Flood Insurance Study (FIS) for an area which is affected by the proposed Primary Highway project and the LPA does adopt an FIS in an area affected by the project after the date of this Agreement, the LPA shall promptly provide notice of the FIS to the DOT. b. The LPA will comply with all provisions of the equal employment opportunity requirements prohibiting discrimination and requiring affirmative action to assure equal employment opportunity as required by Iowa Code Chapter 216. No person will, on the grounds of age, race, creed, color, sex, sexual orientation, gender identity, national origin, religion, pregnancy, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity for which State funds are used. 2016-9-200_Dubuque 2 July 2014 c. It is the intent of both (all) parties that no third party beneficiaries be created by this Agreement. d. If any section, provision, or part of this Agreement shall be found to be invalid or unconstitutional, such finding shall not affect the validity of the Agreement as a whole or any section, provision, or part thereof not found to be invalid or unconstitutional, except to the extent that the original intent of the Agreement cannot be fulfilled. e. This Agreement may be executed in (two) counterparts, each of which so executed will be deemed to be an original. f. This Agreement, as well as the unaffected provisions of any previous agreement(s), addendum(s), and/or amendment(s); represents the entire Agreement between the LPA and DOT regarding this project. All previously executed agreements will remain in effect except as amended herein. Any subsequent change or modification to the terms of this Agreement will be in the form of a duly executed amendment to this document. IN WITNESS WHEREOF, each of the parties hereto has executed Agreement No. 2016-9-200 as of the date shown opposite its signature below. cITYOF®;u UE: By: Date June 6 , 20 16. Title: Ma or Pro - I, Kevin S. F i r n s t a h l , certify that I am the Clerk of the City, and that Ric W. Jones , who signed said Agreement for and on behalf of the City was duly authorized to execute the same on the 6th day of June , 2016 . Signed: C y Clerk of Du uqu Iowa IOWA DEPARTMENT OF TRANSPORTATION: By: cierteb J mes R. Schnoebelen District Engineer District 6 Date 6/1/) , 20 ((2. 2016-9-200_Dubuque 3 July 2014 EXHIBIT A Project Location e r Ilk Leary College Atario's ftakasr Rwtaurant L Al\6ik A nrar Co WfESTELEVENTH \, fegr'S' \4 g+ ✓` aLILLtb'ORK n STREET �a erg\ �5\HdSTORrc PROJECT LOCATION HISTORICi-• \� j,�\\ OIS TRICT F s D/STRICi V+181h5i d �'osk Z � � cit 1-lnl4day irn -" �titur Gi F� 4 �. Pizzo Hut ^ s .:` GYlweu�,Ta�b�nn /hs/p' N DUBUQUE Z iedHOrll iws 6,SufS►; ' !=1 �H.W � r Sfh S! v; EMMA 4, CATHEORAL Iru„k'M HISTORIC (APIGWID,4THV v� OtSTRFCT h-r Tony Ro 6 HISTORY DISTRICT lid5i �S Ic�y��ei4bf vrty'' h lar; ,n rds+'f?rtfrySl . R z° Solon c V dko! Mauu:ltc�G 3t on Cenral-Dutugure 4 •N ei vt 4 65 ns� � d�3��'t• � � � u4yases s CrA„f Ms O N ;, m 7L� oT� �r'rlifsP t\mtc\•1 �, 'rV'� � '� l Vok sr ^ v t, g v, yrs- �a\\€�I�'� Silt; .r feet 250 m Jf 'vr ® t Riker 51 it >✓ee ll,y,UN Y �, m2016 HERE 2016-9-200_Oubuque 4