Loading...
Eagle Point Park Parking Lot Resurfacing Project Acceptance Copyright 2014 City of Dubuque Consent Items # 40. ITEM TITLE: Eagle Point Park Parking Lot Resurfacing Project Acceptance SUMMARY: City Manager recommending acceptance of the public improvement construction contract for the Eagle Point Parking Lot Resurfacing Project as completed by River City Paving. RESOLUTION Accepting the Eagle Point Parking Lot Resurfacing Project and Authorizing the Payment to the Contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Eagle Point Parking Lot Resurfacing Project-MVM City Manager Memo Memo Staff Memo Staff Memo Acceptance Resolution Resolutions Engineer's Certificate Supporting Documentation THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Eagle Point Parking Lot Resurfacing Project Cl P: 3502289 & 3502376 DATE: June 10, 2016 City Engineer Gus Psihoyos is recommending acceptance of the public improvement construction contract for the Eagle Point Parking Lot Resurfacing Project, as completed by River City Paving, in the final contract amount of $68,081.18, which was a 14.4% decrease from the original contract amount of$79,493.93. The decrease was due to not utilizing aggregate base repair on the parking lot. I concur with the recommendation and respectfully request Mayor and City Council approval. Micliael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer TIME CITY OF Dubuque DUB E AN-AmedraMv Masterpiece vri the Mississippi 200: •2012.2013 TO: Michael C. Van Milligen, City Mana er FROM: Gus Psihoyos, City Engineer ` SUBJECT: Eagle Point Parking Lot Resurfacing Project CIP: 3502289 & 3502376 DATE: June 10, 2016 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the Eagle Point Parking Lot Resurfacing Project. BACKGROUND The Eagle Point Parking Lot Resurfacing Project included the resurfacing of the existing parking lot near the tennis courts. The parking lot showed signs of fatigue and required resurfacing. Improvements included spot milling high areas, an overlay of the existing asphalt surface with 2 '/2" of asphalt mix and pavement markings. DISCUSSION The Eagle Point Parking Lot Resurfacing Project was completed by River City Paving, of Dubuque, Iowa, in the final contract amount of$68,081.18 which is a 14.4% decrease from the original contract amount of $79,493.93. The decrease was due to not utilizing aggregate base repair on the parking lot. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $68,081.18 to River City Paving, for the Eagle Point Parking Lot Resurfacing. BUDGET IMPACT The project cost summary for the Eagle Point Parking Lot Resurfacing is as follows: Award Final Construction Contract $79,493.93 $68,081.18 Admin, Design, Construction Engineering & Inspection 4,875.69 4,875.69 Total Project Cost84 69. 2 $72,956.B7 The project funding summary is as follows: CIP No. Fund Description Fund Amount 3502289 EPP Overlay Lot Tennis Ct $64,149.09 3502376 Eagle Point Park Bridge Support $8,807.78 Total Project Funding $72,956.87 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $68,081.18 to River City Paving, for the Eagle Point Parking Lot Resurfacing. Prepared by: Bob Schiesl, Asst. City Engineer Greg Doeden, Civil Engineer cc: Marie Ware, Leisure Services Manager Stephen Fehsal, Park Division Manager F:\PROJECTS\Eagle Point Parking Lot Resurfacing\Council and Staff Documents\Wcceptance RESOLUTION NO. 242-16 ACCEPTING THE EAGLE POINT PARKING LOT RESURFACING PROJECT AND AUTHORIZING -THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Eagle Point Parking Lot Resurfacing Project (the Project) has been completed by the Contractor, River City Paving (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $68,081.18; WHEREAS, the Contractor has previously been paid $64,677.13, leaving a balance of $3,404.06; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $3,404.06 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 20th day of June, 2016. Roy D. B'd'1, Mayor Attest: Kevin S. Firnstahl, CM `= ity Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE EAGLE POINT PARKING LOT RESURFACING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Eagle Point Parking Lot Resurfacing Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $72,956.87. Dated this l day of ' , 2016. Gus Psihoyos, Cit Engineer Filed in the office of the City Clerk on the / day of , 2016. Kevin �. Firnsta I,VVIC, City Clerk 'I I