30-Inch Force Main Relocation Project from 11th St. to 12th St. Phase II_Hearing Copyright 2014 City of Dubuque Public Hearings # 4. ITEM TITLE: 30-Inch Force Main Relocation Projectfrom 7th Streetto 12th Street (Phase 11) SUMMARY: Proof of publication on notice of public hearing to consider approval of the plans, specifications, form of contract and the estimated cost for Phase I I of the 30-Inch Force Main Relocation Project from 11 th Street to 12th Street and the City Manager recommending approval. RESOLUTION Approval of Plans, Specifications, Form of Contract, and Estimated Cost for Phase I I of the 30-1 nch Force Main Relocation Project from 11 th Street to 12th Street SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Phase II of 30 Inch Force Main Relocation Project- City Manager Memo MVM Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Phase II of the 30 Inch Force Main Relocation Project from 7th Street to 12th Street around the former Public Works Garage Site and the Alliant Energy Site DATE: June 10, 2016 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and the estimated cost of$439,204.84 for Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street. I concur with the recommendation and respectfully request Mayor and City Council approval. Micliael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DUB E i I Am�ericaiCitdi Masterpiece on the Mississippi 2007-zoiz•zoi i TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Phase II of the 30 Inch Force Main Relocation Project from 7th Street to 12th Street around the former Public Works Garage Site and the Alliant Energy Site DATE: June 7, 2016 INTRODUCTION The enclosed resolution is in reference to the public hearing for the Phase II of the 30 inch Force Main Relocation Project from 11th Street to 12th Street. There will be one remaining phase to this project. Phase III will be between 7th and 9th Streets, on Washington St. BACKGROUND In 1969 the existing 30 inch force main was constructed from the Cedar Street lift station to the Terminal Street lift station. The route went through the former A.Y. McDonald site, the former City Public Works site, and the Alliant Energy site. During the early 1990's highway 151/61 was constructed through Dubuque. During the highway construction portions of the 30 inch force main were relocated and the portion running through the A.Y. McDonald site was abandoned. However the portion running through the old Public Works Site and the Alliant Energy site remained in place. In October of 2011, the City experienced a significant failure in the existing force main. Two breaks occurred simultaneously, one at the former Public Works garage site and the other at the Alliant Energy site. After repairs were completed, a third break was experienced at the former Public Works garage site. The cost to repair the breaks, which occurred on the former Public works site, was significant as the site is a super fund site. During the repair work some corrosion of the pipe was noted and it was also found that when constructed the pipe was set on blocking prior to bedding, and the blocking was not removed. The areas of corrosion and the failed sections of pipe were near the old blocking that was found to be still in place. Soil and ground water contamination has been identified on or near the existing 30 inch force main route that may be a contributing factor to its deterioration. The adopted budget for FY2017 includes $615,000.00 for constructing the Phase II and Phase III, of the relocation project. DISCUSSION With the adoption of the FY2017 Five Year Capital Improvement Program Budget, there will be a $640,683.88 balance to continue the Relocation of the 30 inch Force Main around the former Public Works Garage Site. A description of the force main relocation is as follows: Construct Phase I: The first phase of the relocation project was completed in 2013, ahead of the intermodal project start. Construct Phase II (Current proiect): Phase II is the section of force main from the Northeast corner of the 11t" Street and Elm Street intersection, to the tie-in point near 12th Street. Construct Phase III (Future Project): Phase III is the section of force main on Washington Street, 7th Street to 9th Street. This section is planned to be completed in conjunction with the reconstruction of Washington Street from 7th to 9th Streets. Phase III would also include the tie-in, at 12th Street and 7th street, and the abandonment of the existing force main through the old Public Works Garage and the Alliant Energy Site. Completing phase III will complete the re-routing project. PROJECT SCHEDULE The proposed development schedule for Phase II of the 30 Inch Force Main Relocation improvement projects is as follows: Initiate Public Bidding Process June 6, 2016 Publish Notice to Bidders, Advertise for Bids June 10, 2016 Publish Public Hearing Notice on Plans & Specs June 10, 2016 Public Hearing on Plans & Specifications June 20, 2016 Receipt of Bid Proposals (Bid Letting) June 23, 2016 Award Construction Contract July 5, 2016 Project Completion Date September 30, 2016 RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and estimated cost for the 30 inch Force Main Relocation Project from 11th Street to 12th Street and authorize the City Clerk to advertise for proposals. 2 BUDGETIMPACT The estimate of probable cost for Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street Project is summarized as follows: Sanitary Sewer Construction Cost Estimate $347,197.50 Contingency (10%) 34,719.75 Engineering & Inspection 57,287.59 I Total Estimate Project Cost $439,204.84 The project balance is summarized as follows: CIP No. FY Fund Description Fund Amount 7102413 2017 Relocation of 30" Force Main Around $640,683.88 Old Public Works Garage Total Project Funding $640,683.88 Phase II of the 30 inch force main relocation project will be funded through the FY2017 capital improvement project appropriation in the amount of $640,683.88, as noted above. ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and estimated cost for the Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street. Prepared by Todd Irwin cc: Jenny Larson, Budget Director William O'Brien, Water Pollution Control Manager John Klostermann, Public Works Director Denise Ihrig, Environmental Engineer Todd Irwin, Engineering Technician 3 RESOLUTION NO. 252-16 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR PHASE H OF THE 30 INCH FORCE MAIN RELOCATION PROJECT FROM 11TH STREET TO 12TH STREET NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for Phase II of the 30 inch Force Main Relocation Project from 11th Street to 12th Street, in the estimated amount $347,197.50, are hereby approved. Passed, adopted and approved this 20th day of June, 2016. Attest: Kevin Firnstahl, CMC, y Clerk oy D. Buol, Mayor STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: June 10, 2016, and for which the charge is $102.75. Subscribed to before na;iiik otary Public in and for Dubuque County, Iowa, this / day of gr, 20 /lv otary Public in and for Dubu MARY K. WESTERMEYER Commission Number 154885 My (. ,rTi, Exp. FEB, 1, 2017 e County, Iowa. CITY OF DUBUQUE, IOWA OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR PHASE II OF THE 30 - INCH FORCE MAIN RELO- CATION PROJECT FROM 11TH STREET TO 12TH STREET NOTICE IS HEREBY GIVEN: The City Coun- cil of the City of Dubu- que, Iowa 'will hold 'a public hearing on the 'proposedplans,-,speci- fications, form of con- tract and estimated cost for Phase II of the 30 inch' Force Main Re- location Project from llth Street to 12th Street in accordance with the provisions of Chapter 26, Code of Io- wa, at 6:30 p.m., on the 20th day of June, 2016, in the Historic Federal Building Council Cham- bers (second -,[floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, speci- fications, form of con- tract 'and r4sti,tat l XDst. •are -J] the office off ,t ee C, ty,1 Clerk, 50 W.18th''St., Dubuque. Written com- mentsi regarding the above public hearings a may be submitted to the City Clerk's• Office on orbefore said time of public hearing. At said hearing any inter- ested, person may, ap pear and file objections thereto. The scope, of the Proj- ect is as follows: rojectisasfollows: The 30" Sanitary Sew- er Force Main. Reloca- tion Phase II: project will extend the pipe in- stalled underthe phase I contract, from' the northeast corner of the intersection of 11th Street, and Elm Street, to the cul-de-sac at the east end of 12th Street. This; contract will not tie in to the existing;; live 30" force main. The project consists of; 458 LK of 30 inch DIP, '68.LF;; of •42'. inch' bored and; jacked steel casing, and an air release strut Any visual or hearing- impaired persons needing special assis- tance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4100 ,, or TDD at (563) 690-6678 at least 48 hours prior to the meeting: Published by order of the City Council given on the 6th day of. June, 2016. Kevin S. Firnstahl, City Clerk 1t'6/10 NOTICE TO BIDDERS SECTION 00120 CITY OF DUBUQUE, PUBLIC IMPROVEMENT PROJECT 30" Sanitary Sewer Force Main Relocation - Phase II Intersection of llth St. and EIm St. Dubuque, IA 120.1 Time and Place for ' Filing Sealed Bids for the work comprising each, improvement as stated below must be filed be- i fore 2:00 p.m. on June 23, 2016, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Du- buque, Iowa. 120.2 Time and , Place Sealed Propos- als Will be Opened and Considered Sealed proposals will be opened and Bids tabulated at 2:OOp.m. on June 23, 2016, at City Hall - Conference Room B, 50 West 13th Street, Dubuque, Iowa,; for consideration' by the City Council at its meeting on July 5, 2016. The City of Dbbu- que, Iowa, reserves the right to reject any and all Bids.' utes. 120.7 Sales Tax 2000d-4 and Title 49, The Bidder should not code of Federal Regu- nclude State of Iowa lations, Department of sales tax in its Bid. -A Transportation, tle Subti- sales tax exemption certificate will be avail- retaryA,, PartOffice 21,of Nondis- theSec able for .all material crimination in Federal purchased? in Iowa for " ly assisted programs of incorporation into the the Department of Project.Transportation issued 120.8 General Na0 pursuant to such Act, tune of flubhc" lm3 ° hereby notifies all bid - prevenient Project ders that it will affir- matively insure that in Force Main ,ReADOO* i any contract entered. tion Phase 11 xa ,g'. Dubuque, IA CIP 7102413 ;. I into pursuant to this The 30"Sanitary Sew- 1 advertisement, mmori- er Force Main Reloca- I ty,business„enterprises :I tion :, Phase II project ' will be afforded full Op-) will extend the pipe in- po'rtumty • to submit, stalled under the phase 1 bids in responto sethis' I ,_ contract,- from the , invitation and will not northeast corner of the be discriminated iogrgblaoig, against oncolorthe grounds 1 Street.a d'hElm' Street, � of race, , national' to the cul-de-sac at the origin, sex, age or dis- 'i east end ofi1.2th Street. ability in considerat on This contract will not for an award.! tie in to the existing On the following date, live 30” force main. The , June 10, 2016 this No- Project consists of; tice was posted at the LF of 30 inch DIP, 68 LF 1 following locations: yefD3bu q ' ste an air release strut- 2 Telegraph He 120.3 Time for Com- mencement and Completion of Work Work on the°Project must be: commenced; within ten (10) calen dar days after the`, No- tice to `'Proceed ` has been issued and shall be fully completed by September 30, 2016. 120.4 Bid Security Each Bidder must ac- company its :Bid :with a 1 Bid security as security that the successful Bid- der will enter into a contract for the work n and will fur - Bid upo nish after the award of contract a corporate surety Bond, accepta- ble to the governmen- tal entity, for the faith- ful performance of the contract, in an amount equal to one hundred percent ,of the amount of the contract. The Bid security must be in the amount of ten percent - (10%) of the amount of the contract and must be in the form of a cashier's check or cer- tified check drawn on a state -chartered or fed- erally chartered bank, or a certified'`share draft drawn on a state chartered or federally chartered credit union, or the Bidder may pro- vide a Bid Bond with corporate surety satis- factory to the govern- mental: entity. The Bid Bond m, ust contain no conditions except as provided in this sec- tion. 120.5- Contract Docu►nents Copies of the Contract Documents may be ob- tained at the Engineer- ing Department, City Hall - Second Floor, 50 West 13th Street, Du- buque, u buque,'lowa 52001. The Contract Documents will also be available on the City's website at www.cityofdubuque.or g/bids.aspx. No plan deposit is required. 120.6 Preference for lowa : Products and' Labor By virtue of statutory authority, preference will be given to. prod- ucts and provisions grown and coal pro- duced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully re - r hired under Iowa stat- ofh b ue W ab raid ture. The bored and it;6/10 jacked section is under . will a quire proper insurance and coordination with therailr Canaoaddian Pacific Thaie�site isatin existing brownfield site and is within, 500 feet of a superfund site. The City has retained HR Green as its envi- ronmental consultant for this project. HR Green conducted phase I and II environ- mental investigations along the alignment and has made'recom- mendations for the work to be conducted under this contract. The general contrac- tor and all personnell'. with exception ofuthe, boring contractor;, ,n volved with excavat ing, dewatering i hauling operations, must have a 40 .hour-. HAZWOPER Certifica- tion and 8 hour re- fresher e,training if ap- plicable. Proof of the required certifications must be provided with- in 24 hours of the bid I opening as •a condition of award. If the low bidder cannot produce the required documen- tation, the bid will be deemed non- responsive. Base' Bid Estimated Total Cost = $347,197.50 120.9 Pre -Bid, Con- struction Conference Each prospective bid- , der is encouraged:to attend the Pre -Bid Con- ,struction Conference` to be held at 9:00 AM on June 15, 2016, at City Hall,,Conference room A (lower level) in Dubuque, Iowa. At- tendance by all pro- spective bidders is not mandatory but highly recommended. 120.10 Title VI `= Non - Discrimination Clause The City of Dubuque in accordance with Ti- tle VI of the Civil Rights Act of 1964, 78, Stat.', 252, 42 U.S.0 2000d-; jacked steel 42 me casing oand red and 1 The Ciit