Loading...
Airport Entrance Rd ReconstructMEMORANDUM March 22, 2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Dubuque Regional Airport - Entrance Reconstruction Airport Manager Andrew Perry is recommending acceptance of the Dubuque Regional Airport Entrance Reconstruction Project, as completed by Tschiggfrie Excavating, in the final contract amount of $183,500.40. The cost overrun was caused by the additional storm sewer along the front of the main terminal. The project was closed in September 1998, however, it was never submitted to Council for approval. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Andrew Perry, Airport Manager TO: FROM: SUBJECT: February 25,2002 Michael C. Van Milligen, City Manager Andrew Perry, Airport Manager Dubuque Regional Airport - Entrance Reconstruction INTRODUCTION The enclosed resolutions provide for the acceptance of the contract for the Dubuque Regional Airport Entrance Reconstruction Project. DISCUSSION The project was completed by Tschiggfrie Excavating of Dubuque, Iowa in the final contract amount of $183,500.40. The overrun was caused by the additional storm sewer along the front of the main terminal. This work consisted of the reconstruction of 700 feet of roadway and installation of 2,276 feet of watermain. The project was closed in September, 1998; however, it was never submitted to Council for acceptance. RECOMMENDATION I would recommend that the City Council accept the improvements and the final contract be established at $183,500.40 BUDGET IMPACT A summary of the project costs is as follows: Construction Contingency Engineedng Bid $145,220.40 44,491.63 7,970.30 Final $183,500.40 0 0 Total Project Cost $167,682.33 $183,500.40 The project was funded from a Fiscal Year 1998 appropriation of $100,000 for the Domestic Water Well System from the General Fund, and $50,000 in Road Use Tax Fund for the Dubuque Regional Airport Entrance Road Construction. RECOMMENDATION The City Council is requested to adopt the attached resolutions accepting improvement and establishing the final contract amount. AP:vjd Prepared by Michael Felderman RESOLUTION NO. -02 ACCEPTING IMPROVEMENT Whereas, the contract for the Dubuque Regional Airport - Entrance Reconstruction Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Fiscal Year 1998 General Fund and the Road Use Tax Fund in amount equal to the amount of this contract, less any retained percentage provided for therein. Passed, approved and adopted this day of ,2002. Attest: Terrance M. Duggan, Mayor Jeanne F. Schneider, City Clerk RESOLUTION NO. __-02 FINAL ESTIMATE Whereas, the contract for the Dubuque Regional Airport - Entrance Reconstruction Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $183,500.40 and the said amount shall be paid from the Fiscal Year 1998 General Fund and the Road Use Tax Fund of the City of Dubuque, Iowa. Passed, approved and adopted this day of ,2002. Attest: Terrance M. Duggan, Mayor Jeanne F. Schneider, City Clerk 03/11/2002 PROJECT NAME: CONTRACTOR: CODE 1201.0200 2 1202.0100 3 1301.0500 4 1301.1300 5 1301.1301 6 1301.1400 7 1301.t800 8 1503.1260 9 1503.1280 10 1503.1290 11 I503.2600 12 1503.2601 13 1503.2602 14 1503.2616 15 1503.2617 16 1503.2618 17 1503.2619 18 1503.2625 19 1503.2626 20 1503.2629 21 1503.2635 22 1503.2636 23 1503.2650 24 1503.2651 25 1503.2653 26 1503.2654 27 1503.2655 28 1503.2661 29 1503.2663 30 I503.2666 31 1503.2668 32 1503.2709 33 1503.2710 34 1503.2711 35 1503.2717 36 1503.2900 37 1503.4255 38 I503.7006 39 1601.0101 40 1703.0t09 41 2000.0000 42 43 44 45 46 47 48 49 DubuqueAirpo~ City ofDubuque PARTIAL PAYMENT NO: Fiual Tschiggfi-le Excavating ITEM Stone Shoulder Granular Subbase Removal of Asphalt Pavement ACC Binder Course ACC Surface Course ACC Hand Patching Adjuslment of Fixtom in Asphalt Pavement Watermaln 6" D.I.P. Watermain 8" D.I.P. Watermain 12" D.I.P. 6" Mega Lug Retain~g Glads 8" Mega Lug Retaining Glands 12" Mega Lug Retaining Glands Fitting 6x6 Anchoring Tee MJ Firing 8x6 Anchoring Tee MJ Fitting 12x6 Anchoring Tee MJ Fitting 12x8 Anchoring Tee MI Fitting 8x4 Tee MI Fitting 8x6 Tee MI Fitting 12x12 Tee MI Fitting 8x4 Cross MI Fi;flag 8x6 Cross MI Bend 4" (45 deg) MI Bend 6" (45 deg) MI Bend 8" (22.5 deg) MI Bend 12" (90 deg) MI Bend 8" (45 deg) MI Reducer 8"x4" MI PE Reducer 12"x8" MI PE 6" Plug MI 12" Plug MI 6" Gate Valve MI 8" Gate Valve MI 12" Gate Valve MI Water Stop Box Fire Hydrant Solid Sleeve 4x7.5 MI Water Service Line, 3/4" Copper pipe Seeding, Fertilizing & Mulching Sub0rain, Perforated Plastic Pipe 4" dia Traffic Conlxol Watermaln 4 DIP Fitting 4 x 4 TeeMJ Watermai~ 4" Value Asphalt Sawcut Excavation Binder Patch Surface Patch Hand Patch of Runway EXTRA WORK CONTRACT AMOUNT: $145,220.40 TOTAJ~ UNIT QUANTITY UNIT COST CO~ 1 Ton 369.65 $10.75 $3,973.74 Ton 522.55 $8.75 $4,572.31 SY 1766 $0.95 $1,677.70 Ton 731.93 $25.00 $18,298.25 Tort 344.55 $25.00 $8,613.75 Ton $80.00 $0.00 Each 3 $150.00 $450.00 LF 169.2 $24.60 $4,162.32 LF 264.77 $27.10 $7,175.27 LF 1840.4 $30.65 $56,408.26 Each 20 $55.00 $1,I00.00 Each 2 $65.00 $130.00 Each 9 $110.00 $990.00 Each I $160.00 $160.00 Each 1 $180.00 $180.00 Each 5 $285.00 $1,425.00 Each 1 $315.00 $315.00 Each $175.00 $0.00 Each $185.00 $0.00 Each 1 $285.00 $285.00 Each $85.00 $0.00 Each $185.00 $0.00 Each $75.00 $0.00 Each 2 $125.00 $250.00 Each 2 $150.00 $300.00 Each 1 $300.00 $300.00 Each 2 $ I 10.00 $220.00 Each 1 $85.00 $85.00 Each 1 $125.00 $125.00 Each 1 $70.00 $70.00 Each 2 $100.00 $200.00 Each 8 $445.00 $3,560.00 Each 3 $625.00 $1,875.00 Each 5 $995.00 $4,975.00 Each 1 $I 15.00 $115.00 Each 6 $1,550.00 $9,300.00 Each 1 $80.00 $80.00 LF 6 $25.00 $150.00 SY $0.55 $0.00 LF 710 $6.50 $4,615.00 LS 1 $1,600.00 $1,600.00 LF 8.2 $31.50 $258.30 Each 1 $125.00 $125.00 Each 1 $450.00 $450.00 LF 549 $2.50 $1,372.50 CY 125 $3.80 $475.00 Ton 154.89 $45.00 $6,970.05 Ton 51 $45.00 $2,295.00 Ton 32.35 $100.00 $3,235.00 03/11/2002 PROIECT NAME: CONTRACTOR: CODE Dubuque Airport City of Dubuque PARTIAL PAYMENT NO: Final Tschiggfi'ie Excavating ri'EM I 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 1201.0200 Stone Shoulder Limestone Solid Sleeve 6" 2 Ft. Hydrant Extension RCP Aprons Storm Sewer 18" RCP Storm Sewer 15" Remove Culvert Headwall Storm Sewer, 8" P.V.C. Bedding Stone 1" Clean Repair Sign Pole (Concrete C-4) Storm Sewer, Intake 101-C Storm Sewer, 10" P.V.C. RCP Storm Sewer 12" Subdrai~ Perforated Plastic Pipe 6" dia Backfill Ditch PCC Side~valk Replacement Touch up Ga'ading TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael Van Miliigen, City Manager City of Dubuque,Iowa The undersigned, , contractor for the above improvement, does hereby accept the above "Total Due Contractor", as fifll settlement for ali claims for said improvement. CONTRACTOR: BY: CONTRACT AMOUNT: $145,220.40 UNIT QUA]'/iIi¥ ~ COST TOTAL COST Ton 369.65 $10.75 $3,973.74 Ton 404 $4.50 $1,818.00 Eacli 1 $75.00 $75.00 Each t $944.00 $944.00 LF 29.5 $27.50 $811.25 LF 376.1 $21.85 $8,217.79 Each 3 $150.00 $450.00 LF 96.5 $15.25 $1,471.63 Tons 16 $8.00 $128.00 CY 2 $2,00 $4.00 Each 8 $1,400.00 $11,200.00 LF 19 $16.75 $318.25 LF 87 $20.00 $1,740.00 Each 258 $1.75 $451.50 LS I $2,139.00 $2,139.00 SF 172.26 $3.00 $516.78 LS 297.75 1 $297.75 $183,500.40 $0.00 $183,500.40