Loading...
Lowell Street Reconstruction Project Acceptance Copyright 2014 City of Dubuque Consent Items # 14. ITEM TITLE: Lowell Street Reconstruction Project Acceptance SUMMARY: City Manager recommending acceptance of the construction contract for the Lowell Street Reconstruction Project as completed by Drew Cook and Sons Excavating. RESOLUTION Accepting the Lowell Street Reconstruction Project and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Lowell Street Reconstruction Project-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Engineers Certificate of Completion Supporting Documentation THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Lowell Street Reconstruction Project Cl P 74025041 71024061 71024071 7202414 DATE: June 29, 2016 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Lowell Street Reconstruction Project, as completed by Drew Cook and Sons Excavating, in the final contract amount of$230,680.83, which is 11% above the original contract of$207,725.00. The increase in the contract was due primarily to additional water main repairs. I concur with the recommendation and respectfully request Mayor and City Council approval. Micliael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF 11111-1 I DU , D.`` V B All-Amer1 Chy 1-1 � Masterpiece on the Mississippi -1007.21112.x013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: June 13, 2016 SUBJECT: Lowell Street Reconstruction Project CIP 7402504, 7102406, 7102407, 7202414 INTRODUCTION The following resolution provides for the acceptance of the construction contract for the Lowell Street Reconstruction Project. BACKGROUND The water main on Lowell Street between Woodworth and Abbott Streets has experienced a number of breaks leading to private property damage; undermining of road base materials; and causing sanitary sewer flooding and overflows leading to claims against the City. The most recent main break on February 27, 2015 caused debris to enter the sanitary sewer system causing a sanitary sewer overflow in the 2400 block of Hempstead Street. The sanitary sewer portion of the project was originally scheduled for CIPP lining rehabilitation in FY2015 between Abbott and Woodworth on Lowell, however it has been determined the very poor condition of the 6 inch diameter pipe is beyond CIPP rehabilitation and it is recommended the pipe be replaced. These improvements are in Consent Decree Sewershed 7 and were identified in the Sewershed 7 Corrective Action Plan as a source of inflow and infiltration. The original scope of the project included the replacement of approximately 400 LF of 6- inch diameter sanitary sewer between Abbott and Woodworth Streets, approximately 515 LF of 6-inch diameter water main, and approximately 140 LF of 15-inch diameter storm sewer, along with ancillary street pavement and ADA curb ramp replacements. The Lowell Street Reconstruction Project was completed by Drew Cook And Sons Excavating Inc. of Dubuque, Iowa in the final contract amount of$230,680.83. This is 11% above the original contract of$207,725.00. The increase in the contract was due primarily to additional water main repairs. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $230,680.83 for the Lowell Street Reconstruction Project. BUDGETIMPACT The project cost summary for the Lowell Street Reconstruction Project is as follows: Award Final Construction Contract $207,725.00 $230,680.83 Contingency 20,772.50 0.00 Construction Engineering & Inspection 10,386.25 11,534.04 Total Project Cost $238,835.75 $242,214.87 The Project funding summary is as follows: CIP No. Fund Descril2tion Fund Amount 7102639 Lowell Street Sanitary $ 133,997.70 7402639 Lowell Street Water Main 108,237.17 Total Project Funding $ 242.214.87 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvements and establish the final contract amount of$230,680.83, for the payment of the contract amount to Drew Cook and Sons Excavating for the Lowell Street Reconstruction Project. cc: Jenny Larson, Budget Director Denise Ihrig, PE Environmental Engineer Deron Muehring, Civil Engineer II Charlie Gau, Engineering Technician 2 RESOLUTION NO. 259-16 ACCEPTING THE LOWELL STREET RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Lowell Street Reconstruction Project (the Project) has been completed by the Contractor, Drew Cook & Sons Excavating, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $230,680.83; WHEREAS, the Contractor has previously been paid $219,146.79, leaving a balance of $11,534.04; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $11,534.04 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 5th day of July, 2016. Attest: Kevin r5 ° Firnstahl, CM°C City Clerk Roy D. Be, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE LOWELL STREET RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Lowell Street Reconstruction Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $242,214.87. Dated this day of , 2016. u j I� Gus Psihoyos, City Engineer ! i Filed in the office of the City Clerk on the �day of v , 20 . KeA- Firnsta I, CTVIC, City Clerk it !I i N ! a