30-Inch Sanitary Sewer Force Main Project Phase 11 Award Copyright 2014 City of Dubuque Action Items # 4. ITEM TITLE: 30-Inch SanitarySewer Force Main Project Phase II Award SUMMARY: City Manager recommending award of the construction contract for the Phase I I of the 30 -Inch Force Main Relocation Project from 11 th Street to 12th Street to the low bidder Top Grade Excavating, Inc. RESOLUTION Awarding the public improvement contract for Phase I I of the 30-Inch Force Main Relocation Project from 11 th Street to 12th Street. SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type 30 Inch Force Main Relocation Project-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF Dubuque UBE I erica .i Masterpiece on the Mississippi 2007-2012-2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 30 Inch Force Main Relocation Project from 7th Street to 12th Street around the former Public Works Garage Site and the Alliant Energy Site DATE: June 29, 2016 Sealed bids were received for Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street. City Engineer Gus Psihoyos recommends award of the construction contract to the low bidder, Top Grade Excavating, Inc., in the amount of $338,888.00, which is 2.4% under the engineer's estimate of$347,197.50. 1 concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DUB E Il Masterpiece on the Mississippi zuoi•2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer n SUBJECT: 30 Inch Force Main Relocation Project from 7th Street to 12th Street around the former Public Works Garage Site and the Alliant Energy Site DATE: June 29, 2016 INTRODUCTION The enclosed resolution authorizes the award of the construction contract for Phase II of the 30 inch Force Main Relocation Project from 11th Street to 12th Street. There will be one remaining phase to this project. Phase III will be between 7th and 9th Streets, on Washington St. BACKGROUND In 1969 the existing 30 inch force main was constructed from the Cedar Street lift station to the Terminal Street lift station. The route went through the former A.Y. McDonald site, the former City Public Works site, and the Alliant Energy site. During the early 1990's highway 151/61 was constructed through Dubuque. During the highway construction portions of the 30 inch force main were relocated and the portion running through the A.Y. McDonald site was abandoned. However the portion running through the old Public Works Site and the Alliant Energy site remained in place. In October of 2011, the City experienced a significant failure in the existing force main. Two breaks occurred simultaneously, one at the former Public Works garage site and the other at the Alliant Energy site. After repairs were completed, a third break was experienced at the former Public Works garage site. The cost to repair the breaks, which occurred on the former Public works site, was significant as the site is a super fund site. During the repair work some corrosion of the pipe was noted and it was also found that when constructed the pipe was set on blocking prior to bedding, and the blocking was not removed. The areas of corrosion and the failed sections of pipe were near the old blocking that was found to be still in place. Soil and ground water contamination has been identified on or near the existing 30 inch force main route that may be a contributing factor to its deterioration. The adopted budget for FY2017 includes $615,000.00 for constructing the Phase II and Phase III, of the relocation project. DISCUSSION With the adoption of the FY2017 Five Year Capital Improvement Program Budget, there will be a $640,683.88 balance to continue the Relocation of the 30 inch Force Main around the former Public Works Garage Site. A description of the force main relocation is as follows: Construct Phase I: The first phase of the relocation project was completed in 2013, ahead of the intermodal project start. Construct Phase II (Current project): Phase II is the section of force main from the Northeast corner of the 1 1th Street and Elm Street intersection, to the tie-in point near 12th Street. Construct Phase III (Future Proiect): Phase III is the section of force main on Washington Street, 7h Street to ()"','Street. This section is planned to be completed in conjunction with the reconstruction of Washington Street from 7th to 9th Streets. Phase III would also include the tie-in, at 12th Street and 7th street, and the abandonment of the existing force main through the old Public Works Garage and the Alliant Energy Site. Completing phase III will complete the re-routing project. BID RESULTS The City of Dubuque received the following bids for Phase II of the 30 inch Force Main Relocation Project on June 23, 2016. Contractor Bid Results Top Grade Excavating, Inc. $ 338,888.00 Miller Trucking & Excavating $ 342,215.00 Tschiggfrie Excavating $ 456,476.25 Portzen Construction, Inc. $ 462,940.00 Top Grade Excavating, Inc. of Farley, Iowa, submitted the low bid in the amount of $338,888.00. This amount is 2.4% under the Engineer's estimate of$347,197.50. RECOMMENDATION I recommend that the Contract for for Phase II of the 30 inch Force Main Relocation Project from 11 th Street to 12th Street be awarded Top Grade Excavating, Inc. of Farley, Iowa, in the amount of$338,888.00. 2 BUDGET IMPACT The estimate of probable cost for Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street Project is summarized as follows: Estimate Award Construction $ 347,197.50 $ 338,888.00 Contingency 34,719.75 34,719.75 Engineering Design, Administration & Inspection 57,287.59 57,287_59 Total Project Cost $ 439,204.84 X430, 95,34 The project balance is summarized as follows: CIP No. FY Fund Description Fund Amount 7102413 2017 Relocation of 30" Force Main Around $1,289,452.45 Old Public Works Garage Total Project Funding $1,289,452.45 Phase II of the 30 inch force main relocation project will be funded through the FY2017 capital improvement project appropriation in the amount of$430,895.34 as noted above. ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding Phase II of the 30 Inch Force Main Relocation Project from 11th Street to 12th Street to Top Grade Excavating, Inc. in the amount of$338,888.00. Attachments Prepared by Todd Irwin cc: Jenny Larson, Budget Director William O'Brien, Water Pollution Control Manager John Klostermann, Public Works Director Denise Ihrig, Environmental Engineer Todd Irwin, Engineering Technician 3 RESOLUTION NO. 270-16 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR PHASE II OF THE 30 INCH FORCE MAIN RELOCATION PROJECT FROM 11TH STREET TO 12TH STREET Whereas, sealed proposals have been submitted by contractors for Phase II of the 30 inch Force Main Relocation Project from 11th Street to 12th Street, (the Project) pursuant to Resolution No. 222-16 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 10th day of June, 2016. Whereas, said sealed proposals were opened and read on the 23rd day of June, 2016 and it has been determined that Top Grade Excavating, Inc. of Farley, Iowa, with a bid in the amount of $338,888.00 is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded Top Grade Excavating, Inc. and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 5th day of ,Jte, 2016. July Attest: Kevin S. Firnstahl, CMCity Clerk oy D. Buol, Mayor