Loading...
JF Kennedy Rd ReconstructionMEMORANDUM April 11, 2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager John F. Kennedy Construction A public hearing has been set for April 15, 2002 on the plans and specifications for the reconstruction of John F. Kennedy Road. The City has received two petitions against the inclusion of sidewalks as part of the project. These petitions represent 30.7% of the assessable portion of the project. At this public hearing, the City Council will need to approve the plans and specifications with a simple majority vote for either including or excluding the sidewalks. At the May 6, 2002 public hearing on special assessments, a 3/4-vote of the City Council will be required to approve the special assessments for the project. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director Mike Felderman, Civil Engineer RESOLUTION NO. 214-02 APPROVAL OF PLANS AND SPECIFICATIONS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans and specifications as amended by the City Council on Apdl 15, 2002, to eliminate the public sidewalks, form of contract and estimated cost for the John F. Kennedy Reconstruction Project in the estimated amount of $1,300,142.54, are hereby approved and ordered filed in the office of the City Clerk for public inspection. Passed, adopted and approved this 15th day of April, 2002. Terrance M. Duggan, Mayor Attest: /s/ Jeanne F. Schneiider, CMC, City Clerk BIDDER NAME: Bid Proposal For: CODE DATE: Reconstruction of JFK (from Spring Vally to Barony Dr.) ITEM UN~ QUAN~f'ITY 1 2101 --100100 Clearing & Grubbing Unit 2 2102--100100Class I0 Excavation, Roadway And Borrow M^3 3 2102--230100 Special Backfill Matarial MG 4 2105--842505Topsoil,FumishandSpread . M^3 5 2110-~I 00200 Granular Material MG 6 2111 --100000 Granular Subbase M^2 7 2121 --200100 Granular Shoulder, Type B MG 8 2123--100100Earth Shoulder, Finishing M 9 2123-100200 Earth Shoulder, Construction M 10 230I-132260 Standard or slip - Form Portland Cement Concrete Pavement, Class C, Class 2 Durability 260mm M^2 11 2303--042120HMA (3M EASL)intermediate, I2.5 mm MG 12 2303--043124HMA (3M EASL) surf, I2.5 mm. Fric L-4 MG 13 2303-236422Asphalt binder, PG 64-22 M^2 14 2303--600000 Adjustment of Fixture Each 15 2416-240525Concrete Pipe Aprons 525 mm Dia Each 16 2416--240750Concrete Pipe Aprons 750 mm Dia Each 17 2416--320525Pipe Aprons Gttard (PF-26) 525 mm Each 18 2416~-320750pipeApronsGuard(PF-26) 750 mm Each 19 2502--300193 Subdrain Outlet, IEg - t9C Each 20 2502--250100Longitude Subdrain (Shoulder) I00 mm M 21 2503--120525 Concrete 75D Storm Sewer pipe 525rran DIA, M 22 2503--120750Concrete 75DStorm Sewer pipe 750mm DIA M 23 2503--140375 Concrete 100D Storm Sewer pipe 375mm DIA. M 24 2503--140450Concrete 100D Storm Sewer pipe 450mm DIA M 25 2503--140525 Concrete 100D Storm Sewer pipe 525mm D1A: M 26 2503-400500Storm Sewer Utility Access RA~50 Each 27 2507--001100Revetment Class A M^2 28 2510--001000 Removal ofpuvement M^2 29 2511-100000Removal o£Sidewalk M^2 30 2511--200100 Portand Cement Concrete Sidewalk 100mm M^2 31 2515--000100Removal of Paved Drive~vay M^2 32 2515-100150Portand Cement Concrete Driveway 150mm M^2 33 2516--101000Removal Retaining Walls and Steps M^3 - 34 2525--002000SiltFence M 35 2527--101000 painted Pavement Marking M 36 2527--104000painted Symbols&Legend Each 37 2598--190050RelocateWater Servlce Stop Boxes Each 38 2599--999901Watermain 300mm (12") DIP, Push on Joint w/PoIywrap, Class 52 M 39 2599--999901 Watarmain 200mm (8") DIP, Push on Joint w Poly~wap, Class 52 M 40 2599--99990l Watermain 150mm (6') DIP, Push on Joint w/Polywrap, Class 52 M 41 2599--999902 Modular Block Retaining Wall M^2 42 2599--999915 Fitting 300x300x300mm( 12x 12x 12) Anchor Tee Each 43 2599--999915Storm Sewer, Intake 101-B Each 44 2599--999915 Water Valve Box Adjustment, Repair and Clean Each 45 2599--999915 Water Valve Box, (Street) Replace Upper Sections and Lids Each 46 2599-999915Hydrants MI Each 47 2599--999915Bend IS0mm (6") (90 deg) MJ Each 48 2599--999915Fitting 300x300x300mm (12x12xS) Anchor Tee Each 49 2599-999915Mega Lug 300mm (12") Each 50 2599-999915Mega Lug 200 mm (8") Each 51 2599--999915 Valve, Gate 150mm (6") RS "O" Ring MI Each 52 2599--999915 Valve, Gate 200mm (8") RS "O" Ring MJ Each 53 2599--999915 Valve, Gate 300mm (12") RS "O" Ring MJ Each 54 2599--999915 Sleeve #441,200mm (8") MI Each 55 2599-999915 Sleeve #441,300mm (12") MJ Each 98.9 17686 6670 1178 318 3005 68 1918 322.22 11992 3.74 1.87 43d 1 1 1 I 38 2375 7.6 14.3 677.3 271.5 75.5 1 60 6334 53 2126 1075 64I 6 420 2839 16 3 118 4 20 30 30 10 10 4 1 1 7 4 3 1 7 1 9 BIDDER NAME: Bid Proposal For: CODE DATE: Reconstruction of JFK (from Spring Vally to Barony Dr.) ITEM UNIT QUANTITY 56 2601-101200Seeding, Fertilizing (Urban) 57 2601-I 04200 Mulching 58 2601-I06000 Sodding 59 2601--109000Watering I-La 0.3 Ha 0.3 M^2 6022 KL 2640 TOTAL BID NOTE: SEE REVERSE SIDE 15-3.00 WATER MAIN February 16, 1996 15-3.01 Description. This work shall consist of furnishing all labor, material, and equipment necessary to complete the water main installation in accordance w/th the plans and specifications. All new water main installations shall have a minimum p~pe size of 200mm (8") ~n diameter, except that ali hydrant branches shall have a minimum pipe size of 150mm (6") in diameter. 15-3.02 Materials 15-3.0201 Ductile-Iron Pipe. 15-3.02011 Ductile-iron pipe shall be manufactured and tested in accordance with ASA Specifications A21.51 or AWWA Specifications C151. ASA Class and wall thickness shall be as shown below. WALL TIIlCKNESS ASA CLASS NUMBERS Pipe Size Ductile-Iron Cast-Iron Ductile-Iron Cast-Iron 100mm (4") 7.4mm (.29'~) 9.6mm(.38") 52 23 150mm (6") 7.8mm(.3t") 10.4mm(.41") 52 23 200mm (8") 8.3mm(.33") Il.lmm(.44") 52 23 250mm (10") 8.9mm(.35") 13.2mm(.52") 52 24 300mm (12") 9.4mm(.37") 14.2mm(.56") 52 24 350mm (14") 9. hm'n(.36") 16.3mm(.64") 51 25 400mm (16") 9.4mm(.37") 17.3mm(.68") 51 25 450mm (18") 9.6mm(.38") 18.5mm(.73") 51 25 500mm (20") 9.9mm(.39") 19.8mm(.78") 51 25 600mm (24") 10.4mm(.41") 39.4mm(.92") 51 26 15-3.02012 Alt ductile iron pipe shall be cement mortar lined in accordance with ASA Specification A21.4 or AWWA Specification C 104. All ductile iron pipe shall have an asphaltic coating approximately 1 mil thick. The weight,, class, or nominal thickness, and casting per/od shall be shown on each pipe. The manufacturer's mark, country where cas~, the year in which the pipe was produced, and the letters DI or "Ductile" shall be cast or stamped on the p~pe. 15-3.0202 Pipe Joints 15-3.02021 All newly laid water main shall have push-on joints with rubber gaskets per ASA Specification A 21.11 or AWWA Specifications C 11 I. Ail pipe with the single gasket type joint shall have the spigot end marked with a painted stripe so as to indicate when the pipe is "home". Standard laying 15 - 29 15-3.0203 15-3.0204 15-3.0205 February l6, 1996 lengths shall be 6.lin (20 feet). Random lengths will not be acceptable. Class 150 water pipe measuring 75mm(3") through 300mm (12") in nominal diameter shall be used unless otherwise directed by the Municipal Water Department. Valve, Fitting, and Hydrant Joints. Ail valves and fire hydrant inlets shall have mechanical joint ends that conform to specifications in AWWA standard C11 l/A21.11. Alt compact fittings for sizes 125mm(5"~ to 300mm (12") inclusive shall be mechanical joint and conform to AWWA standard C 153/A21.53. All other fittings shall be mechanical joint and conform to AWWA standard C 1 t 0/C 110A. Nuts, Bolts, and Glands. All nuts and bolts shall conform to AWWA standard Clll/A21.i1, be coated with a rust resistant lubricant, and shall be marked to identify the material and producer. All glands used on mechanical joints shall be gray or ductile iron and have an asphaltic coating. All glands shall have cast or stamped on them the manufacturer's ID, nominal size, and the letters DI or the word "Ductile" if made of ductile iron. All glands shall be produced and tested in accordance with AWWA C111. Fittings. Ail fittings shall have apressure rating of 250 psi, cast-iron or ductile-iron, and shall be manufactured and tested in accordance w/th ASA specifications C110 and C110A and C153/A21.53 for compact fittings sized 75mm(3") to 300mm (12") inclusive except that the plain end shall be beveled. 15-3.0206 Valves. I5-3.0206t 15-3.02062 15~3.02063 Ail gate valves shall conform to AWWA C500 and may include Ctow, Kennedy, Mueller, or approved equal, with a working pressure of 175 pounds, and be tested at 300 pounds pressure. Gate Valves, (100mm (4")-300mm (12")). All gate valves shall be standard design, cast-iron bodied, bronze mounted, double disc, resilient seated, and non-rising stems with "o" ring stuffing box. Valves stems shall be of hard bronze, and the design of the valves shall be such that the gate when opening or closing shall be in contact with the seats but shall be forced to contact by wedge action following intermission ora transverse movement. All valves shall mm right to open, with a square operating nut (5mm or 1 7/8" square). Butterfly Valves, (350mm (14")-600mm (24")). Butterfly Valves shall be Ctow, Pratt, Mueller, Dresser, or equal, and shall conform to AWWA C504. 15 - 30 February 16, 1996 15-3.02064 Ball Valves. Ball Valves shall be in accordance with AWWA C507, shaft or trunnion-mounted. 150mm (6 ") through 1200mm (48")) for water pressures up to 300 psi. 15-3.02065 Check Valves. Check Valves shall be in accordance with AWWA C508, swingcheck valves. 15-3.02066 Backflow Prevention. Backflow Valves shall be in accordance with AW~VA 506, reduced pressure principle and double check valve types. i5-3.0207 Valve Boxes. Furnish and install standard three (3) piece valve box, equal to that manufactured by the Chicago-Foundry Corporation, on each of the gate valves. Valve boxes shall be of the three-piece slide type. Extensions shall be the slide type and bases shall be round. Valve covers shall bear the word "Water" on top. Valve boxes shall be considered integral un/ts and shall have at least six inch ( 1 5 0mm (6"))adjustment above and below the specified depth of cover over the pipe. 15-3.0208 Fire Hydrants. 15-3.02081 Fire hydrants shall be manufactured and tested in accordance with AWWA standard C502. The model of hydrant used for water main construction will be determined by the municipal water department but shall include the following manufactures: Clow, Kennedy, Mueller, and Waterous or approved equal. 15-3.02082 These hydrants shall have a 125mm (5") valve opening, with a 150mm (6") mechanical joint connection for a depth of 1 .Sm (6'), one (1) 100mm (4")) steamer nozzle and two (2) 65mm (2 1/2") hose nozzle with National Standard thread. Hydrants must open to the fight and have a 22mm (7/8") square operating nut. 15-3.0209 Corrosion Control. 15-3.02091 All ductile iron water main shall be protected from corrosion using a polyethylene encasement. Polyethylene shall be a minimum of 8 mil in thickness and have a minimum tensile strength of 1200 ps~. 15-3.02092 Polyethylene installation shall conform with Methods A, B, or C as stated in AWWA C 105/A21.5. 15 - 31 February16,1996 15-3.02093 Ali valves shall be protected from corrosion by attaching a 21.75 kilogram (48) pound, sacri~ficial magnesium anode to the bonnet of the valve. 15 -3.0210 Thrust Restraint 15-3.02101 Reaction backing shall be concrete of a mix not leaner than 1 cemem; 2-1/2 sand; 5 stone, and having a compressive strength of not less than 2,500 psi at 28 days. 15-3.02102 Steel rods or approved equal shall be 20mm (3/4") in diameter and rustproof treated or painted as shown or directed by the design Engineer. 15-3.02103 In additi6n, movement can be prevented by installing retainer glands as tong as the retainer is rated for use on the class of ductile iron pipe being installed. Alt retainer glands shall comply with AWWA standard C 11 l/A21.11. 15-3.0211 Bedding Sand. Bedding Sand shall be used for bedding which is free of rock and foreign materials. t 5-3.0212 Cement. Cement shall be of the best quality of Portland Cement, complying in all respects with the requirements as set forth in the latest designation ofASTM C~150. t5-3.0213 Stone or Gravel. Broken stone or gravel shall consist of particles of hard, durable mineral of such size as will be retained on a quarter inch mesh screen and pass a one and a half mesh. It shall be free from shale, clay or other material that will be detrimental to the strength or lasting qualities of concrete. 15-3.0214 Encasement For Water Main 15-3.02141 Jacked-in-place water lines beneath existing structures, pavemems, and railroad tracks shall be encased with steel pipe having welded joints and a minimum yield strength of 35,000 psi and an inside diameter 150mm (6") to 200mm (8") larger than the outside diameter of the water main bells. The thickness of the encasement shall be determined by referencing the following chart: t5 - 32 15-3.03 15-3.0301 February 16, 1996 Minimum Welded Steel Casing Pipe Thickness Inside Diameter 150rmn (6")-300mm (12") 3500mm (14") 400mm (16") 450m_rn (t8") 500mm (20") 550mm (22") 600mm (24") 650mm (26") 700mm -760mm(28"-30") 810mm (32") 860 ,nm~ (34") 910mm (36") 960m_m - 1060mm(38 "-42 ") 1220rmm (48") Highways/Streets 4.8mm/0.188" 4.8mm/0.188" 6.3mm/0.250" 6.3mm/0.250" 6.3mm/0.250" 6.3mm/0.250" 7.2mm/0.281" 7.2mm/0.281" 7.9mm/0.312" 7.9mm/0.312" 7.9mm/0.312" 8.7mm/0.344" 8.7mm/0.344" 8.7mm/0.344 Railroads 4.8mm/0.188" 7.2mm/0.282" 7.2rnm/0.282" 7.9mm/0.312" 8.7mm/0.344" 9.5mm/0.375" 10.3mm/0.406" 11.1mm/0.438" 1 t.9mm/0.469" 12.7mm/0.500" 13.5mm/0.531" 13.5mm/0.531" 14.3mm/0.563 15-3.02142 Water main crossing a waterway shall be encased with concrete equal to or greater than what is used for concrete reaction backing. Excavation and Preparation of Trench General. The Contractor shall excavate all pipe trenches to provide a minimum cover of 1.68m (5-1/2')above the top of the water main, or as otherwise shown in the contract documents or directed by the Engineer. Whenever the Contractor shall excavate below the grade shown for the barrel of the pipe, he shall backfill the trench to grade with selected sand tamped in place at no additional cost to the City. Whenever the Engineer deems it advisable to explore or excavate ahead of the trenching to determine the location of existing underground structures, the Contractor shall make such excavations and explorations at no additional cost. If any unexpected obstruction is encountered during the progress of the work, the Engineer may order a deviation from the established grade or alignment or make other changes necessary to overcome the obstruction. Changes in alignment will not be basis for extra payment, however, grade changes exceeding one foot (I') will be compensated as outlined in these specifications. Any existing structure encountered which requires temporary removal or support or other maintenance while construction proceeds shall be adequately protected and maintained so that they are not damaged in any way. 15 - 33 February 16, 1996 The Contractor shall do all clearing necessary for access, stringing of pipeline materials and construction of the pipeline and appurtenant structures. In areas wl-rich are to be seeded or sodded the Contractor shall remove and stockpile sufficient topsoil (if present) to a minimum depth of I00mm (4"). Topsoil shall be free from trash, debris, and surface vegetation more than 150mm (6") in height. After all other work has been completed in each area, topsoil shall be placed and graded to the satisfaction of the Engineer. The ground shall be excavated in open trenches except where tunneling is indicated in the contract document or is considered necessary or proper by the Engineer, to the width and depth necessary for the proper construction of the water main and appurtenances according to their contract documents. The trench shall be dug only as far in advance of the pipe laying that is necessary to expedite the work. All work must be done in a dry trench and the Contractor shall provide and maintain adequate dewatering equipment to remove and dispose of all surface and ground water entering excavations, trenches or other parrs of the work. All excavated material shall be piled within the construction limits or in a location obtained by the Contractor and approved by the Engineer in a manner that will not endanger the work and that will avoid obstructing sidewalks, driveways and fire hydrants. Gutters shall be kept clear or other satisfactory provisions made for street drainage at all times. 15-3.0302 15-3.03021 15-3.03022 Trench Bottom & Bedding. All water main shall be laid on 150mm (6") of sand or limestone screenings that is free of rock and foreign material. The bed shall be slightly rounded to provide a uniform and continuous bearing and support for the pipe at everypoint between bells. Bell'holes shaltbe of sufficient depth to insure an even bearing of the main body of the pipe, avoiding and bearing directly on the bell joints. Water main may be bedded on native soil if it is granular in the opinion of the local water department. Elevation of the bottom of the trench shall be checked before pipe is laid. 15 - 34 February 16, 1996 15-3.0303 Trench Width. 15-3.03031 The trench width at the bottom shall be at least 0.6m (2') plus the outside diameter of the pipe and no more than 0.9m (3') plus the outside diameter of the pipe for water main greater than 450mm (18") inchesin diameter. Trench width at a level 150mm (6") above the p~pe shall be a minimum of 300mm (12") plus the outside diameter of the pipe and the minimum of 220mm (9") plus the outside diameter of the pipe for pipe 450mm (18") inches or greater. 15-3.03032 If the Contractor creates a trench width greater than that specified for the level six inches (150mm (6")) above the top of the pipe, he shall be required to alleviate the situation by methods approved by the Engineer. Approved methods may require the Contractor to install pipe with a greater strength than the specific pipe' or to upgrade the class of bedding. No extra con/pensation shall be allowed for any increase in materials or construction costs created due to greater than specified trench width at the top of the pipe. 15-3.0304 Sheeting and Bracing. The Contractor, in order to maintain safe working conditions in compliance with the Federal Occupational Safety and Health Administration regulations, to confine his work within the construction limits, or to prevent the disturbing or settlement of adjacent road surfaces, curbs, foundations, structures, fences, walks, utility lines or railroad tracks, shall furnish and place all sheeting and bracing which may be necessary, including safety boxes. The Contractor shall be responsible for the placement of the sheeting and bracing and for its strength and sufficiency. Any damage to the work under this contract or to adjacent structures or property caused by settlement, water or earth pressures, slides, cave-ins, or other factors due to failure or lack of sheeting and bracing, or improper bracing, shall be repaired by the Contractor. All sheeting and bracing, unless otherwise specified, shall be installed and removed from the work site at no additional compensation. Metal sheeting or bracing may be left in place in the trench if written approval is obtained from the Engineer. Any sheeting or bracing left in place shall be cut off approximately two feet (2') below the final ground level and the cur-off portion removed. 15 - 35 February16,1996 The Contractor shall receive no compensation for sheeting and bracing left in place. 15-3.0305 Rock Removal. Wherever the word "rock" appears in these specifications, it shall include granite, trap, quartzite, chert, limestone, sandstone, hard shale, or slate in natural ledges or displaced masses. It shall also include rock fragments or boulders larger than .38cubic meter (½ cubic yard) when their size, number or location prevents them from being handled in a manner consistem with normal backhoe excavation. Material which can be removed by the use of backhoe frost teeth shall be paid for ar the rate of fifty percent (50%) of the cost or rock removal. Should rock be encountered in the excavation, it shall be removed by blasting, jackhammer, hoe-ram, or otherwise. Where blasts are made, the excavation shall be carefully covered to prevent danger to life or property. The Contractor, prior to blasting, shall secure a City permit and any additional insurance required. No blasting shall be done by the Contractor until the necessarD, cross sections of the top of the rock have been taken. If, in the event rock excavation is a separate bid item, the following basis ofpaymem will be used. The measurements for rock will be a width equal to 300mm fl2") greater than the outside diameter of the p~pe installed. Measurement for depth will be 150mm (6") below the bottom of the outside of the pipe. No allowance wilt be made for rock excavation in excess of the above limits. If rock is not anticipated or is not a separate bid item, but is encountered, payment will be made at $50.00 per .75 cubic meter as measured above. Before the pipe is laid, all irregular/ties of the rock are to be filled with suitable granular material compacted into place the bottom of the trench brought to the proper grade. Furnishing and placing of the granular material shall be paid for at the unit price for bedding stone. 15-3.0306 Dewatering. All water entering the excavations or other parts of the work shall be removed until all the work has been completed. No sanitary sewer shall be used for the disposal of trench water. 15-3.04 Lnstallation and Backfillin~ 15-3.0401 Line and Grade. The Engineer will provide the Contractor with line and grade stakes set on the natural ground surface. It shall be the Contractor's responsibility to transfer the line and grade to the bottom of the ditch. 15 - 36 15-3.0402 February16,1996 It shall be the Contractor's responsibility to protect the original line and grade stakes set by the Engineer. Should the stakes become destroyed or damaged, the cost of their replacement will be at the Contractor's expense. Pipe Laying and Assembly. Laying of pipes shall commence at the lowest point so the spigot or tongue ends point do,~mb_ill. Proper methods shall be used for handling and placing pipe to avoid spilling or breaking and to avoid unnecessary disturbance of bedding surface in trench bottoms. Each pipe shall be laid on an even, firm bed so that no uneven strain will come on any pipe, and particular care shall be exercised to prevent the pipe from bearing on the joints. Bell holes for belt-and-spigot pipe shall be dug ar each point as herein before specified. The bell end of all pipe shall be laid up-grade. Wood blocks shall not be used to support the pipe or to adjust the final grade of the p~pe. The interior of the water main shall, as the work progresses, be cleared of all dirt. jointing material and superfluous materials. Pipe shall be joined in strict accordance with the Manufacturer's recommendations On pipe 600mm (24") and larger, pressure must be applied to each pipe as it is laid by a winch and cable or other mechanical means to insure that the spigot is home in the socket. When pipe laying is suspended for any reason, watertight bulkheads shall be placed in the end of the pipe. Open ends of pipes and fittings shall be effectively sealed. Before laying any ductile iron pipe, all lumps, blisters from excess cold tar coating shall be r-emoved from the bell and spigot end of each pipe. The outside of the spigot and the inside of the bell shall then be wire brushed and wiped clean and dry. The pipe ends shall be kept clean until all joints are made. The cuttin~ of pipe for inserting valves, fittings, or enclosure pieces shall be done in a neat workmanlike manner without damage to the pipe or cement lining and so as to leave a smooth end at right angles to the axis of the pipe. The flame cutting of pipe by means of an acetylene torch will not be allowed. Cutting of pipe shall be done in a neat and workmanlike manner without damage to pipe or lining. Pipe shall be handled properly. Materials must at all times be handled with care to prevent damage. Under no circumstances will pipe be dropped or damaged. Hook ends shall not be used for installing or removing pipe. 15 - 37 February 16, 1996 The gasket and gasket seat inside the bell shall be wiped clean with a cloth. The gasket shall be p}aced in the bell according to the manufacturer's direction. 15-3.0403 Backfill Around Pipe. The Contractor shall not backfill water mains until elevations, alignment, and the pipe joints have been checked and inspected by the Engineer. Unless otherwise directed, all trenches and excavations shall be back_filled as soon as is practically possible, and the work shall be prosecuted expeditiously. Ail water main, as soon as laid, shall have the space between the pipe and the sides of the trench packed full by hand and thoroughly tamped with a shovel or light tamper in 150mm (6") lifts up to a level of 300mm (12") above the top of the pipe with sand or limestone screening. Haunching initial backfilling from bottom of pipe to one foot above the pipe shall be carefully placed and compacted to provide side support to the pipe. The balance of the trench may be trench may be filled with suitable backfill material as herein described. Water main may be backfilled from the bottom of the pipe to 300mm (12") above the top of the top of the pipe with native soil if it is granular in the opinion of the local water department. 15-3.0404 Backfill General. All backfill material shall be subject to the prior approval of the Engineer. If in the opinion of the Engineer, the material excavated constitutes unsuitable backfill, the Contractor shall provide, unless otherwise stated, at his own expense, acceptable backfill material, or dry and replace the unacceptable material at his expense. No frozen material shall be used for backfilling. All surplus excavated material which is not used in backfilling shall be loaded and disposed of by the Contractor at his own expense. 15-3.0405 Compaction. The compaction required in streets, alleys, sidewalks, driveways, around structures or within 1.5m (5') to the edge of the pavement, shall be: 15-3.04051 Ninety-five percent (95%) of standard proctor density from 300mm (1') above the top of the pipe to the fin/shed surface. Individual lifts shall not exceed 300mm (12") loose thickness. February16,1996 15 - 38 15-3.04052 The compaction required at all other areas shall be eighty five pement (85%) of standard proctor density from 300mm (I') above the top of pipe to the finished surface. Individual ligs shall not exceed 600mm (2'). 15-3.04053 In the case where a separate item is included in the bid proposal to cover any unsukable back fill material, the cost of the backfill shall not include any compaction. The compaction o£the existing into the unit price of the pipe. 15-3.0406 Deflection at Joints. When it is necessary to deflect ductile iron pipe from a straight line in either the horizontal or vertical plane, the mount of joint deflection shall not exceed that shown in Table 15-3.04061 The deflections listed are maximum deflections and should not be exceeded unless authorized by the municipal water department. 15-3.04062 . For design purposes, deflection should be limited to 80 pement of the values shoCrn. TABLE 1 Maximum Joint Deflection Ductile Iron Pipe-Push On Type Joint Nominal Pipe Maximum Offset mm (Inches) Approx. Radius of Curve Size mm (Inches) for 4.5m-0.9m(15-3') Length pipe for 4.Sm-0.9m(15-3') Len~-~ch pipe 750mm (3") 100mm (4") 150mm (6") 200mm (8") 250mm (10") 300mm (12") 350mm (14") 400mm(16") 450mm (18") 500mm (20") 600mm (24") 760mm (30") 910mm (36") 1060mm (42") 1220mm (48") 1370mm (54") 15-3.0407 530mm(21) 530mm(21) 530mm(21) 530mm(21) 530mm(21) 530mm(21) 300mm(t2) 300mm(12) 300mm(12) 300mm(12) 300mm(12) 300mm(12) 300mm(12) 200mm (8) 200mm (8) 150mm (6) 70.1m (230') 70.1m (230') 70. lm (230') 70.1m (230') 70.1m (230') 70.1m (230') 115.8m (380% 115.8m ~380') 115.8m ~380') 115.8m ~380') 115.8m ~380') 115.8m (380') 115.8m I380') 173.5m (570') 173.5m (570') 231.6m I760') Valves and Fittings. Prior to installation, valves shall be inspected for direction of opening, number of rams to open, freedom of operation, tightness of pressure-containing boking and 15 - 39 February16,1996 test plugs, cleanliness of valve ports and especially seating surfaces, handling damage, and cracks. Defective valves shall be corrected or held for inspection by the Engineer. Valves shall be closed before being installed. 15-3.04071 Valves, fittings, plugs, and caps shall be set and joined to the pipe in the manner specified in Section 15-3.04 (B) 6, 7, 8. Valves should be provided with special support, such as treated timbers, crushed stone or concrete pads so that the pipe will not be required to support the weight of the valve. 15-3.04072 A valve box or a vault shall be provided for every valve. 15-3.04073 A valve box shall be provided for every valve that has no gearing or operating mechanism or in which the gearing or operating mechanism is fully protected with a gear case. The valve box shall not transmit shock or stress to the valve and shall be centered over the operating nut of the valve, with the box cover flush with the surface of the fin/shed area or such other level as may be directed by the owner. t5-3.04074 A valve vault designed to prevent settling on the pipe shall be provided for every valve that has exposed gearing or operating mechanisms. The operating nut shall be readily accessible for operation tkrough the opening in the valve vault, which shall be set flush with the surface of the fin/shed pavement or such other level as may be specified. Vaults shall be constructed to permit minor valve repairs and afford protection to the valve and pipe from impact where they pass through the vault walls. 15-3.04075 In no case shall valves be used to bring misaligned pipe into alignment during installation. Pipe shall be supported in such a mariner as to prevent stress on the valve. 15-3.04076 All dead ends on new mains shall be closed with plugs or caps that are suitably restrained to prevent blowing offunder test pressure. If a blowoff valve precedes the plug or cap, k too shall be restrained against blowing off. All dead ends shall be equipped with suitable blowoff facilities. 15 - 40 Februmy16,1996 15-3.0408 Fire Hydrants 15-3.04081 Hydrants shall be located as shown or as directed and in a manner to provide complete accessibility, and also in such a manner that the possibility of damage from vehicles or injury ro pedestr/ans will be minimized. When placed behind the curb, the hydrant barrel shall be set so that no portion of the pumper or hose nozzle cap will be less than 300mm (12") from the g-utter face of the curb. When set in the lawn space between the curb and the sidewalk, or between the sidewalk and the property line, no portion of the hydrant or nozzle cap shall be within 150mm (6") of the sidewalk. 15-3.04082 All hydrants shall stand plumb and shall have their nozzles parallel with or at right angles to the curb, with the pumper nozzle facing the curb, except that hydrants having two hose nozzles 90 degrees apart shall be set with each nozzle facing the curb ar an angle of 45 degrees. Hydrants shall be set to the established grade, with nozzles at least 300mm (12") above the ground, as shown or as directed by the municipal water department. 15-3.04083 The fire hydrants shall be placed on a concrete slab six inches (150mm (6")) thick, to prevent them from settling. The fire hydrants shall be backfilled around with 75mm (3") clean crushed rock m a height of 0.9m (3') above bottom of trench and for the width of the trench, in accordance with AWWA C600. A layer of plastic shalI be placed between the clean stone and earth backfilled. 15-3.0409 Thrust Restraint 15-3.04091 Thrust restraint is required on all horizontal and vertical bends, dead ends, tees, crosses, and other locations as directed by the Engineer. Wood bracing will notbe allowed against thrust blocking. 15-3.04092 Concrete reaction backing shall be placed between solid ground and the fitting to be anchored; the area of bearing on the pipe and on the ground in each instance shall be shown or directed by the design Engineer. The backing shall, unless otherwise shown or directed, be so placed that the pipe and fitting joints will be accessible for repair. The concrete shall be allowed a minimum 24 hour set time before charging the line. 15 - 41 15-3.04093 15-3.04094 15-3.0410 Febmary16,1996 Metal tie rods of adequate strength to prevent movement may be used instead of concrete backing, as directed by the design Engineer. Rodding with metal rods and clamps or returner glands is required on all vertical bends, fire hydrant branches, repair elbows, between the tee and valve on temporary stubs, and other locations as directed by the Engineer. Encasement of Water Main. Water main crossing a waterway shall be of ductile iron pipe with flexible watertight joints and shall be installed in a concrete encasement and installed as follows: I5-3.04101 15-3.04102 15-3.04103 The stream bed at least 300mm (1') when located in rock. when crossing major streams. The water main shall be securely anchored to prevem movement of the pipe and provided with easily accessible shutoff valves located outside of the floodway at each end of the water crossing. The area of waters of the United States that is disturbed must be limited to the mimmum necessary to construct the water main. Excess material must be removed to upland areas immediately upon completion of construction. Appropriate erosion and siltation controls must be used and maintained in effective operating condition during construction, and exposed soil and other fills must be permanently stabilized at the earliest practicable date. No discharge of dredged or fill material may consist of unsuitable material. (e.g. trash, debris, car bodies, etc.) and material discharged must be free from toxic pollutants in toxic amounts (see Section 307 of the Clean Water Act). Discharges must not permanently restrict 6r impede the passage of normal or expected high flows or cause the relocation of the water (unless the primary purpose of the fill is to impound waters). In any case, this must be limited to the maximum extent practicable. If the discharge cremes an impoundment of water, adverse impacts on the aquatic system caused by the accelerated passage of water and/or the restriction of its flow shall be minimized to the maximum extent practicable. 15 - 42 15-3.0412 15-04121 15-3.04122 15-3.04123 February l6, 1996 Any temporary fills must be removed in their entirety and the affected areas returned to their pre-existing elevation. Protection of Water Supplies Horizontal Separation of Water Mains from Gravity Sewers Water and sewer mains generally shall be separated a distance of at least 3.0m (10') horizontally. If such lateral separation is not possible, the bottom of the water main shall be at least 450mm (I 8") above the top of the sewer and the water main placed in a separate trench or in the same trench on a bench of undisturbed earth at a minimum horizontal separation of 0.9m (3') from the sewer. When it is impossible to obtain the required horizontal clearance of 0.9m (3') and the vertical separation of 450mm (18 "), the sewer must be replaced with ductile iron pipe meeting alt requimmems as set forth in these specifications for water main. However, a linear separation of at least 600mm (2') shall be provided. Separation of Water Mains from Sewer Force Mains Water mains shall be separated from sewer force mains by a horizontal distance of at least 3.0m (10') unless the following conditions exist. The force main is constructed of material meeting all requirements as set forth in these specifications for water main and the water main is laid at least 1.2m (4') from the sewer force main. Separation of Water Main and Sewer Crossovers Vertical separation of water mains crossing over any sanitary sewer shall be at least 450mm (18"1 when measured from the bottom of the water main to the top of the sewer. If physical conditions prevent this separation, then the water main shall not be placed closer thzn 150mm (6") above a sewer of 450mm (18") below a sewer. The separation distance shall be the maximum feasible in alt cases. Where the water main crosses a sewer, one fall length of water p~pe shalI be located so both joints are as far as possible from the sewer. The water and sewer pipes must be adequately supported and have water tight joints. A lower permeability soil shall be used 15 - 43 February 16, 1996 for backfill material within a 3.0m (10') radius from the point of crossing. 15-3.04124 Separation of Sewer MamSoles No water pipe shall pass through or come in contact with any part of a sewer manhole. A minimum horizontal separation of 0.96m ~3') shall be maintained. 15-3.04125 Exceptions Should physical conditions exist such that exceptions to Section 15- 3.0412 of these specifications are necessary, the municipal waer engineer must design a course of action that will provide equal protection to the water supply as outlined in Sections 15-3.04121, 15 - 3.04122, 15-3.04123, and 15-3.04124. 15-3.0413 Tapping of Water Main. Any sized water tap shall be installed by employees of the local water department, only. No employee will enter a trench or other excavation to install a corporation stop, make repairs, or perform other related duties until the excavation is secured by sloping, shoring, or other means recognized and in accordance with the Occupational Safety and Health Administration Standards. The City of Dubuque Water Department will furnish all material and labor necessary to perform water taps and the cost of all labor and materials will be reflected in the price of the water connection permit. 15-3.0414 Disinfecting Water Mains 15-3.04141 General. The disinfecting of water mains shall be done in conformance, with AWWA C 601. Precautions shall be taken to protect the interiors of pipe~, fittings and valves against contamination. Al1 openings in the pipeline shall be closed with watertight plugs when pipe laying is stopped at the close of the day's work or during break periods. If dirt enters the pipe that, in the opinion of the Engineer, will not be removed by the flushing operation, the interior of the pipe shall be cleaned by mechanical means and then swabbed with a 1 percent hypochlorite disinfecting solution. 15-3.0415 Methods of Chlorination. Calcium hypochlorite ~anules. construction, calcium hypochlorite granules shall be placed the During 15 - 44 February 16, 1996 upstream end of the first section of pipe, at the upstream end of each branch main, and at 152.4m (500') intervals. The quantity of granules shall be as follows: Pipe Diameter in. 100mm (4") 150mm (6") 200mm (8") 300mm (12") 400mm (16") and larger Calcium Hypochlorite Granules. ~ams (oz.) 14.2 (0.5) 28.3 (1.0) 56.7 (2.0) 113.4 (4.0) 226.8 (8.0) 15-3.04151 Calcium hypochlorite granules. During construction, calcium hypochlorite granules shall be placed the upstream end of the first section of pipe, at the upstream end of each branch mare, and at 152.4m (500') intervals. The quantity of granules shall be as follows: Pipe Diameter in. lOOmm (4") 150mm (6") 200mm (8") 300mm (12") 400mm (16") and larger Calcium Hypochlorite Granules. ~ams (oz.) 14.2 (0.5) 28.3 (1.0) 56.7 (2.0) 113.4 (4.O) 226.8 (8.0) 15-3.04152 15-3.04153 The tablets shall be attached by an adhesive such as Permeate No. I, or equal. There shall be no adhesive on the tablet except on the board side attached to the surface of the pipe. Attach ail the tablets inside and at the top of the main with approximately equal numbers of tablets at each end of a given pipe length. When installation has been completed, the main shall be filled with water at a rate such that water within the main will flow at a velocity no greater than 1 fps. Precautions shail be taken m assure that air pockets are eliminated. This water shall remain in the pipe for at least 24 hours. If the water temperature is less than 4.4C (40 F), the water shall remain in the pipe for at least 48 hours. Valves shail be poskioned so that the strong chlorine solution in the main being treated will not flow into water mains in active service. 15-3.04154 Alternate methods as described in AWWA C601 may be utilized by the Contractor and in some applications may be preferred and directed by the Engineer. 15 - 45 15-3.0416 I5-3.0417 15-3.0418 15-3.0419 February16,1996 Final Flushing. After the applicable retention period, the heavily chlorinated inated water shall be flushed from the main until chlorine measurements show that the concentration in the water leaving the main is no higher than generally prevailing in the system or is acceptable for domestic use. The environment to wh/ch the chlorinated water is to be discharged shall be inspected and if there is any question that the chlorinated discharge will cause damage to the environment, then a reducing agent shall be applied to the water to be waste neutralized thoroughly the chlorine residual remaining in the water. Bacteriological Tests. After final flushing and before the water main is placed in service, a sample or samples shall be collected from the end of the line, shall be tested for bacteriological quality in accordance with Standard Methods, and shall show the absence of coliform organisms. A standard plate count may be required at the option of the Engineer. At least one sample shall be collected from the new main and one from each branch. In the case of extremely long mains, it is desirable that samples be collected along the iength of the line as well as at its end. Samples for bacteriological analysis shall be collected in sterile bottles treated with sodium thiosulfate as required in Standard Methods. No hose or fire hydrant shall be used in collection of samples. Re-disinfection. If the initial disinfection fails to produce satisfactory bacteriological samples, the main may be re flushed and shall be resampled. If-check samples show the presence of coliform organisms, then the main shall be re-chlorinated by the continuous feed or slug method or chlorinated as prescribed in AWWA C601 until satisfactory results are obtained. Disinfection Procedures when Cutting into or Repairing Existing Mains. 15-3.04191 When an old main is opened, either by accident or design, the interior of all pipe and fittings used in making the repair shall be swabbed or sprayed with 1 percent hypochlorite solution before they are installed. 15~3.04192 Thorough flushing is the most practical means of removing contamination introduced during repairs. If valve and hydrant locations permit, flushing toward the work location from both directions is recommended. Flushing shall be started as soon as the repairs are 15 - 46 15-3.04t93 15-3.0420 15-3.0421 15-3.0422 15-3.0423 February 16, 1996 completed and shall be continued until discolored water is eliminated. Bacteriological samples shall be taken after repairs to provide a record by which the effectiveness of the procedures used can be determined. If positive samples are recorded, daily sampling shall be continued until two consecutive negative samples are recorded. Air Relief Facilities. Water mains shall be laid to avoid high points where air can accumulate. When high points occur, measures shall be taken to remove the air when the main is initially filled with water. Air relief valves should be located at ail high points where air can accumulate. Automatic air relief valves shall not be used in situations where flooding of the manhole or chamber can occur. The'open end of an automatically operated air relief valve discharge pipe shall be covered with a sixteen (t6) mesh or' finer corromon resistant screen and terminated in a down-turned position at least 300mm(l') above ground elevation. The open end of a manually operated air-relief valve discharge pipe shall be extended to no less than 150mm (6") from the top of a manhole or chamber. Chambers. Chambers, pits and manholes containing valves, blowoffs, meters, or other such appurtenances to a distribution system, shall not be connected directly to any storm drain or sanitary sewer, nor shall any blowoffs or air relief valves be connected directly to any sewer. Chambers shall drain to the ground surface, when possible, providing the hamber is not subject to flooding. Underground absorption its may be used when draining to the ground cannot be provided. Inspection, Handling, and Storage. All pipe and appurtenances are subject to inspection by the owner at the point of delivery. Material found to be defective due to manufacture or damage in shipment shall be rejected and removed from the job site. All pipe, fittings, valves, hydrants, and accessories shall be loaded and unloaded by lifting with hoists or skidding m avoid shock or damage. Materials, if stored, shall be kept safe from damage. The interior of ail pipe fittings and other appurtenances shall be kept free from dirt or foreign matter at ali times. Repair and Transition Couplings. Repair and transition couplings will be utilized to join two spigot ends of watermain pipe together. All couplings shall be constructed from grey or ductile t5 - 47 15-3.05 February 16, 1996 iron pipe and manufactured in accordance with ASTM A 126 Class B. Follower glands shall be meltable or ductile iron and conforming to material standard ASTM A47 Grade 32510 or ASTM A536. All couplings shall have external coatings that are resistant ro corrosion. Pressure Testina and Leak Detection. The pressure test shall consist of complete filling of the section of main under observation with water applied by means of the pump connected to the pipe in a satisfactory manner. The pump, pipe connection and all necessary apparatus for testing shall be furnished by the contractor. Such tests, unless otherwise specified, shall provide a hydrostatic pressure of at least 1.5 times the normal operating pressure at the point of testing. The duration of the test under the specified pressure shall be at least two (2) hours. The test shall not vary by more than + or - 5 psi for the duration of the test. No pipe installation.will be accepted if the leakage is greater than thai determined by the following formula: L = SD P/133,200 Where L is the allowable leakage, in gallons per hour; S is the length of pipe tested, in feet; D is the nominal diameter of the pipe, in inches; and P is the average test pressure during the leakage test, in psig. Before applying the specified test pressure, all air shall be expelled from the pipe by means of taps located au the points of highest elevation or as necessary. Said taps shall afterward be tightly plugged. After the required pressure has been obtained, all exposed joints shall be carefully examined. The Contractor shall provide suitable means of determining the quantity of water lost by leakage under the specified test pressure. No pipe installation shall be accepted until this leakage is less than 43.9 liters (11.6 gallons) per twenty-four (24) hours per 2.5mm (inch) of diameter per 786m (mile) of p~pe. Where practical, unless otherwise approved by the Engineer, pipe lines shall be tested in length of not more than 457.2m (1,500'). Leakage shall be defined as the quantity' of water to be supplied ro the newly laid pipe necessary to maintain specified leakage test pressure after the pipe has been filled with water and air expelled. Water will be made available without charge to the contractor by the Engineer for testing the pipe line, in accordance with AWWA C600. 15 - 48 February16.1996 15-3.06 Completion of Water Main Proiect. After water main installation is completed, it shall be the responsibility of the project contractor to ensure that ali valves closed during construction are reopened and raised to the street subgade. 15-3.07 Water Service. The water service items shall follow the City of Dubuque, City Ordinances under the Utility section, Article IH, Water. 15-3.08 Method of Measurement Watermain. The linear feet of each size of water main shall be the actual length measured. Deductions will be made from the measured length for valves and other appurtenances. Fitting, Values, Hydrant and other Watermain appurtence. Each valve, hydrant, or other appurtenance will be measured as a single unit. This shall be full payment for materials, equipment, excavation, installation and all work incidental. Coupling Repair. Repair of Coupling will be measured as a single unit. This shall be full payment for materials, equipment, excavation, installation and ali work incidental. Water Service Pipe. The linear feet of Water Service shall be the actual length measured. Deductions will be made from the measured length for valves and other appurtenance. Water Service Value Boxes. Each valve, or other appurtenance will be measured as a single unit. This shall be full payment for materials, equipment, excavation, installation and all work incidental. 15-3.09 Basis of Payment General. The unit and lump sum prices stated in the contract to be paid for the respective items shall be payment in full for the completion of all work specified and described to be included in the respective items, complete and ready for use and operation, as shown on the drawings and as specified. Water Main. The unit prices as bid shall include the furnishing of all labor and equipment necessary to install the water main in accordance with the plans and specifications. The work hall include ali excavation, installing and joining of pipe and fittings, removal and disposal of water, backfill, sheeting and shoring, disposal of excess excavated material, protection of existing structures and utilities, clean-up and all other operations 15 - 49 February 16, 1996 unless specifically covered by other pay-items specified under this contract. When the plans indicate the elevations at which the water main is to be constructed, and the pipes are laid as indicated in the contract documents or to a changed flowline not lower than 300mm (i') below the plan elevations, the Contractor will be paid the contract price per lienal foot of water main completed. If it becomes necessary to lower the flowline by more than 300mm (1'), payment for the overdepth excavation will be made as follows: From the original contract price per foot shall be deducted one hundred twenty-five percent (i25%) of the cost per foot of pipe, delivered to the work site. The remainder :~vill be considered the contract "price for excavation and laying of pipe" The contract "price for excavation and laying of pipe" shall be divided by the average depth from original ground profile of the total footage of that particular size of pipe shown on the plans, and this quotient considered the "basis excavation and laying price" per foot of pipe, per foot of depth. For depth of excavation for more than 300mm (1') below the plan flowline elevation, payment for overdepth excavation will be made in accordance with the following schedule: Percentage of Basic Excavation Overdepth and Excavation* La¥in~ Price 300mm 100% 600mm 120% 900mm 140% 1.2m 160% 1.5m 180% 1.8m 200% For. depth of excavation greater than 1.83m (6') below plan flowline elevation, payment will be made as extra work. Encased Water Main The leng~th of encased water main shall be considered as the assembled leng~th inside the pipe encasemem. The contract price per linear foot of encased water main. This shall be fail payment for materials, equipment, excavation, installation and all work incidental 15 - 50 February 16, 1996 there to. Excavation, regardless o£nature, will not be measured or paid for separately, but shall be considered as incidental to the encased water main. Valves. Hydrants and Other Water Main Appurtenances. For construction of valves, hydrants, and other water main appurtenances including PVC tracer wire, the Contractor will be paid the contract unit price each, for the g~pe indicated. Couplin_o Repair. Construction of coupling will be paid the contract unit price each, for the type indicated. This shall be full payment for materials, eqmpment, excavation, installation and ali work incidental Water Service Pipe. The length of water service pipe shall be considered as the assembled len~h. The contract price per linear foot of water service pipe. This shall be full payment for materials, eqmpment, excavation, installation and all work incidental there to. Excavation. regardless of nature, will not be measured or paid for separately, but shall be considered as incidental to the encased water main. Water Service Valve Boxes. For construction of water service valves boxes. the Contractor will be paid the contract unil price each, for the type indicated. This shall be full payment for materials, equipment, excavation, installation and all work incidental. 15 - 51 15-4.00 15-4.01 15-4.02 15-4.03 February16,1996 ABANDON PIPE OR MANHOLE. Description. All sanitary or storm sewer to be abandoned as shown on the plans shall be plugged off at the lower end or the Iine and filled with flowable mortar. Any concrete used for plugging shall follow the City's specifications for flowable mortar in Section 14. Manholes to be manholes to abandon shall be filled to within 300mm(l') from the finished grade, and have the ring and cover removed. Method of Measurement. The abandoning of a pipe or manhole will be computed by the Engineer as the volume to be filled as shown in the contract documents. Basis of Payment. The Contractor shall be paid the contract price per cubic yard, for the abandoning ora pipe or manhole. This shall be full payment for materials, equipment, excavation, installation and all work incidental. The Contractor shall be paid the lump sum price, for the abandoning of a pipe or manhole. This shall be full payment for materials, equipment, excavation. inst~llation and all work incidental. 15 - 52 JFK RD. City of Dubuque RECONSTRUCTION PROJECT End of Project 1064+82.107 Location Map UTILITIES WATER CITY DF DUBUQUE WATER DIVISION ELECTRIC ALLIAN-flNTERSTATE POWER 910 Kemer Blvd. DUBUQUE, IOWA Ron Saae rBIgl 584-7372 Mike Roth [319] 584~7371 SEWER CITY OF DUBUQUE ENGINEERING DIVISION ]3TH & CENTRAL DUBUQUE. OWA. J3IR) 589-4270 GUS PSlHOYOS GAS TELEPHONE U,S, WEST COMMUNICATIONS CABLE fV PREPARED BY: Cl~ OF DUBUQUE Cit¢ 3oundar y CortlDJex INDEX OF SHEETS Cover Page, H. 01 Legend & Symbol Information H. 02 Deto~ H. 03 - H. 04 Typical Cross Sections H. 05 Bid Est. &general Intormafion H. 0B - H. 09 Plan and Profile H. 10 - H. 11 Storm Sewer H. 12 Water Details H, 13- H. 14 Joint Layout H. 18 Control Points H. 19 Cross Sections H. 20 - H. 27 DSQ Botanical NORTH -Beginning of Project1051 +08.00 METRIC STANDARD ROAD PLANS Sheet Number H. OI ED OTREE B4 CTREE 30 TREE-BUSH TREE UINE GATE POST FENCE-CDR FENCE CH-LINK FENCE WOOD FENCE WIRE STAR DRILL SET BEkSH MARKER eND-NAIL/SPIKE FND-IRON PIN FND-IRON ROD FND-CONC HONUMENT FND-ROW RAIL SET-CUT X SET ROD SET ~K NAIL SET-SPIKE TOP OF STREAM BOTTOM OF STREAM FLOW LINE OF STREAM FLOW LINE OF DITCH WP_K-EDGE SIDEWALK-COR SIDWALK STOOP COR CL ROADWAY CL DRIVEWAY CURD DACK OF CURD GUTTER SANATARY MANHOLE CMP TOP CNP F-LOWLINE RCP TOP RCP FLOWLINE STORM SEWER HEADWALL CULVERT HEAD WALL FLOW LINE OF FES STORH SEWER MANHOLE CB GRATE CDR CORNER OF CB CORNER OF PROPOSED CD ELECTRICAL MANHOLE ELECTRICAL PAD ELECTRICAL METER UNDERGROUND ELECTRICAL CABL ELECTRICAL PEDESTAL GAS VALUE UNDERGROUND GAS LINE TELEPHONE NANHOLE UNDERGROUND TELEPHONE CABLE TELEPHONE PEDESTAL TELEVATION PAD UNDERGROUND TELEVATION TELEVATION PEDESTAL UTILITY POWER POLE UTILITY POLE LIGHT UTILITY GUY ANCHOR UNDERGROUND WATER _INE WATER VALVE WATER STOP BOX FIRE HYDRANT TRAFFIC SIGN TRAFFIC SIGNAL POLE TRAFFIC CONTROL BOX CDR PKG HETER BUILDING BUILDING DOORWAY BUILDING FLOOR ELEVATION //son.s. //son.s.-- EXISTING SANITARY SEWER //stm.s~-//stm.s.-- --XISTING STORM SEWER //w.m.--,-/~'.m.-- WATER dAllk (#=SIZE) gas gas GAS MAIN [e ~e~ JNDERCROUND TELEPHONE u~v u~v UNDERGROUND CABLE TV GRADING LIMITS PROPOSED STORiV SEWER ................. PROPOSED DRAIN TILE '- // , '-- WOOD "-ENCE --x ^ - NIRE FENCE ---O O C)-- STEEL FENCE R,O.w beagenc~ &: Sym~)o nformation ~)ES,GN TE^M FELDERMAN I METRIC l IOWA DOT / C, TY OF OUaUQUE - OFFICE OF )ESiCN DUBL )UE COUNTY :ROJECT NUMBER STP -32-1<2) --2C-51 [SHEET NUMaER -. 02 ~% CITY OF DUBUQUE ENGINEERING DEPARTMENT CITY OF DUBUQUE ENGINEERING DEPARTMENT RESIDENTIAl. DRIVEWAY TYPE Bt (DROP CURB) J t JULY B2 NO SCALE DESIGN TEAM FELDERMAN J METRIC J IOWA DOT /CtTY OF DUBUQUE "OFFICE OF DESIGN J INTAKE. iOtB 91.44cm ~C '~20.32cm § 15.24cm 116.84cm 6'j15,24cm~ REIN~0RCINO SCHEDULE 1. Grates shall be Neenah R-3246AL Asphalt coated 2. Catch Basins deeper than ~ ~t. shall include #4 bars on 12 inch or 30.48 cm centers in base and sidewalls. 3. The minimum depth from gutter to intake base shall be 4.5' ar 137.16 cm unless othe~ise 4. Catch Basins will be backfilled with select malapai approved by fha city. rhis mate~al shall be mechanically tamped in 6" or 15.24 cm lilts, The Catch Basin shall include back~llMg. 5. Intake shall be separated fram ad[acent rigid pavements by I" expansbn mafedaL Drain Tile Detail Backfill 9, JBmm Meter 100 mm 50mm Trench Longitudinal Wi Storm Sewer' Trench Longitudinal Details Of Integral Curb DUBUQUE COUNTY J PROJECT NUMBER STP -32-1(2) --2C-31 J SHEET NUMBER H. 0,~ TABULATION OF PAVEMENT MARKINGS SYMBOLS AND LEGENDS RO,,O ,.OOA~',ON ~ ~ "'*'~ ~ / 'X ~ ~ STOP AHB~D O~LI SCHOOL XING C.,~ REMARK: D~NTIFICATION STATION SlOE I 09-27-94 DETAILS OF INTERG~L ~PICAL SECTION EARTH SHOULDER 150 mm STANDARD CURB A~iacent to A.C.C. ~sawment FELDERMAN I ~'~ I ,ow~ ~o~ / c,~ o~ ou~,~u~, o~,o~ o~DESIGNI DUBUQUECOUNTY J PROJECT NUMBERSTP -52-1(2) --2C-51 JSHEET NUM~E~H. 04 DES~CN TEAM LOCATION 7/ /PT 5 POT red'us 3 / -- 1. Dimensions Shown Are Measured to Back of curb PT , POT rodius, Sc ~h,rn cu[b ~ ~n~, ~,,~ ~d. 1, Dimensions Shown Are Measured to Back of curb POINT NO, STATION OFFSET ELEVATION CURVE / ~' "- qorthe n ? POINT NO, STATION OFFSET ELEVATION CURVE I 1051+12.86 JFK 6.25 Rt. 263.23 ~/' 1 1058+17.7 JFK 6.25 Rt. 285.382 ~ / 2 1051+16.42 JFK 7.97 Rt. 263.55 ~ 2 1058+28.2 JFK 10.77 Rt. 285,475 3 1051+17.79 JFK 11,67 Rt. ~u~.o~ ;~G ~,~ ~ ~3 ~- 2~3 3 1058+32.6 JFK 21.41 Rt. 285.57 4 1051+12.49 JFK 11.53 Rt. 5.3M ~*uo u,~ u*~u ~+~ ~zu 4 1058+17.4 JFK 21.5 Rt. 15.25M ~;~ 0+05 o+1o 0+15 0+201 0+25 5 1051+27.33 JFK 11.53 Rt. ~'~< z, ~ ~ 5 1058+42.0 JFK 21.42 Rt. 285.57 6 1051+29.95 JFK 8.00 Rt. 264.53 6 1058+46.5 JFK 10,78 Rt. 285.70 7 1051+33.40 JFK 6.25 Rt. 264.76 7 1058+57.1 JFK 6.25 Rt. 285,936 8 1051+33.18 JFK 12.08 Rt. 5.8M 8 1058+57.3 JFK 21,55 Rt. 15,31M -/ /-¢ 0+05 0+10 0+15 0+20 0+'~~-- l1 2101-100100 Refer to Tabulation T-10 for additionalinformation. 2 2102-100100 All undesirable material such as asphalt and concrete shall be thc contractor's responsibility to provide waste disposal site. No pavement for overhaul will be allowed for material hauled to disposal site. 3 2102-230100 Place 300 mm of Stone in areas of unsuitable Soil condition as agreed to by engineer a 2105-842505 Topsoil shall be placed l00mm thick on back filled areas. Topsoil shall have no stones or rubble larger than 10mm in diameter. Contractor will be responsible for grading and back fill behind curb before topsoil is placed. No stones or rabble larger than 50mm diameter shall be place within lm below the topsoil 2123-100100 The estimate for back filling behind the curb is 288m^3 Which is included tmder class 10excavation 2123-100200 The estimated backfill is 117m^3 I0 2301-132260 PCC Pavement will require perpendicular ed joints. The euxb and gutter is ineidential to paving. 1I 2303-042120 Applicationoftackoilincedentaltobiditem Application rate 0.2 Idm2 Refer to Tabulation T-19 for additional information. 12 2303-043124 Application of task ell ineedental to bid item Application rate 0.2L/m2 Refer to Tabulation T-18 for additional information. 13 2303-236422 Place 100mmofasphaltover 100mmofgranularsubbase Refer to Tabulation T- 17 for additional information. 14 2303-600000 Refer to Tabulation T-22 for addltional in formation. 20 2502~250100 Drain tile is to be placed 1.22m below the top back of curb and shall tie into the catch basins as per plan. Refer to Tabulation T-I 1 for additional information. Pourous backfill (9.38mm) to be incidental to this bid item 21 2303-120525 Stonfi sewer pi~e ioints require an "O" ring 22 2503-120750 _Storm sewer ! e ~ints re uire an "G~ 23 2503-140375 Storm s_ewer pipe lomts require an "O" ting 24 2503-140450 Storm sewer pipe ointa require an "O" ring 25 2503-140~25 Storm sewer pipejoin s require an "O" ring 26 2503-400500 Bid item includes RA-53 accessory and KA-54 or RA-55 Grate as necessar 28 2510-001000 The average pavement thickness of JFK is 120mm Refer to Tabulation T-23 for additional information. 29 2511-100000 Refer to Tabulation T-15 for additional information. 30 2511-200100 Refer to Tabulation %12 for additional information. 32 2515-100150 Refer to Tabulation %17 for additional information. Contractor shall maintain access to all resident except at time of paving 34 2525-002000 Refer to Tabulation %26 for additional information. 352527-101000 Refer to Tabulation T-25 for additional information. 362527-104000 Refertodetailsheetfurad~.tionalinformation. 37-2598-190050 The contractor will need to relocate the water stop boxes to back of curb or in the parkway. The price shall include 2.5 meters of 3/4" copper water pipe. The Plumbing Contractor must flush the newly laid copper service line after the City Water Distribution personnel makes the water tap(s) on the water main. Flushing the service lines may be controlled at the corporation cock or the curb stop. Flushing must occur on all copper service lines whether or not the properq, owner decides to connect to the water service. Flushing will occur outside the dwelling and before the new service ts connected to the water meter. Flushing is not allowed to occur through any water meter. After the water meter is installed or reconnected, close the outlet shut offvalve by the meter. Open the inlet shut off valve slowly until the meter is dell of water. Open the outlet valve slowly until air is out of the meter and service line. Introducing water too quieldy into the meter will damage the meter's internal components. The entire service connection must be filled slowly with water to help prevent any loose particles inside the internal plumbing from becoming water borne. The flow nfwater into the water service can he controlled at the corporation cock or the curb stop. In either case, do not open any valve instantaneously. This procedure wii1 prevent a water hammer from damaging the internal plumbing system Refer to Tabulation 1'-20 for additional information. 2599-999915 Water Distribution personnel will shut offwatar main service to the residents on JFK between the hours of 8:00 am and 4:00 pm weekdays. The Contractor must schedule the shutting down of the water main at least two (2) days in advance to properly nofity residents. Lots adjacent to JFK Road where existing water main is located that require water service will have a llne tap exeoutad. City Water Department will not shut down water Contractor must verify upon completion of project that all water valves within the project limits are left in the e correct position. Open valve= Fully open minus one mm. Closed valw-- Fully closed General rule: size of valve times three plus three Example: 6" valve x 3 = 18 + 3 = 21 full tums. 38-552599-999901 Refer to Tabuintion T- 16 for additional informatlon. 4I 2599-999902 Refer to Tabulation T-24 for additional information. 43 2599-999915 Preeast intakes will not be allowed 44 2599-999915 Contractor is responsible to leave all water valve boxes in the project limits in a neat, clean and obstruction free condition. 45 2599-999915 Contractor will provide and imtall new water valve box sections and lids on all existing water valve boxes along IPK Road. 46 2599-999915 Contractor to maintain field measure of hydrants relocated and provide them to Water Departmem Distribution Staff. Hydrant located to meet minlmunl measurements on hydrant setback. Ali water valve and hydrant installations including f'mal flushing nfall water mains will be completed no later than 4:00 p.m. weekdays. The Contractor will pressure test each fire hydrant after installation to verify proper operation and installation. 56 2601-101200 Refer to Tabulation T-14 for additional information. 58 2601-106000 Refer to Tabulation T-I4 for additional information. 59-2601-109000 Application rate 401dm2 per application UNIT CODE ITEM __ UNIT ~UAi,~T 1 2101-100100 Clear'_m_g&Gmbbing Unit 98.9 2 2102-100100 Classl0Excavation~RoadwayandBerrow M"3 17686 3 2102-230100 SpecialBaeldillMaterial ~G 6670_ 4 2105-842505 Topsoil, Fumish and Spread M^3 1178 5 2110-100200 GranularMatarial MG 318 6 2ii1-100000 GranularSubbaee MM 3005 7 2121-100100 Granular Shoulder, TypeB MG 68 8 2123-100100 Earth Shoulder Finishing M 1918 9 2123-i00200 Earth Shoulder, Conslraetion M 322.22 10 2301-132260 Standard or slip - Form Portinmi Cement Concrete Pavement, Class C, Class 2 Durability 260 mr M^2 11992 11 2303-042120 HMA (3M EASL) Intermediate, 12.5 mm MG 3.74 122303-043124 HMA (3M EASL) anrf, 12.5 mm, Frie L-4 MG 1.87 ~230%236422 Asphalt Binder PG 64-22 M^2 434 14 2303-600000 Adjustment Of Fixtore -- Each 14 15 2416-240525 Concrete Pipe Aprons 525 nun Dia. Each 1 16 2416-240750 Concrete Pipe Aprons 750 nam Din. Each 1 17 2416-320525 Pipe Aprons Guard (PF-26) 525mm Each 1 ~8 2416-320750 Pipe Aprons Guard (PF-26) 750 mm Each I 19 2502-300193 Subdrai~Oufiet, RF- 19C Each 38 20 2502.250100 Longitade Subdrain (Shoulder) 100 mm M 2375 T1 2503-120525 Conomta 75D Storm Sewer pipe 525mm Dia. M 7.6 22 2503-120-750 Concrete 75D STorm Sewer pipe 750 mm Dia. M 14.3 23 2503-140375 Concrete }00D Storm Sewer pipe 375 mm Dia. M 677.3 4~2~503-140450 Concrete 100D Storm Sewer pipe 450 mm Dia. M 271.5 25 2503-140525 Concrete 100D Storm Sewer pipe 525mm Dia. M 75.5 26 2503-400500 Storm Sewer Utility Access RA-50 Each 1 ~T2507-001100 Rovetment Class A M^2 60 28 2510-001-ff00 Removal of PavemenC' M^2 6334 292511-1ffff000 Removal~-f-gihewalk M^2 53 -302511720'0100 Portl~fi-dCementCoanrcte~lk-T0~lmm M^2 212~- 31 2515-000100 RemovalofPavedDrivewa~t M^2 1075 32 2515-I00150 Portland Cement Concrete Driveway 150 mm M"2 64i 332516-101000 RemoveRetamingWallsandSteps M^3 6 34 2525-002000 Silt Fence M 420 352527-101000 Palntad Pavement Marking M 2839 36 2527-104000 Painted Symbols & Legend Each 16 37 2598-190050 Relocate Water Service Stop Boxes Each 3 38 2599-999901 Watarmain 300mm (12") DIP, Push on Joint w/Polywrap Class 52 M I 18 39 2599-999901 Watarmain 250mm, (8") Push on Joint w/Polywrap, Class 52 M 4 40 2599-999901 Watarmain 150mm (6") DIP, Push on Joint w/Polywrap, Class 52 M 20 41 2599-999902 Modular Block Retaining Wall M^2 30 42 2599-999915 Fitting 300mm x 300mm x 300mm (12x12x12) Anchor Tee Each 1 43 2599-999915 Storm Sewer, intake 101-B Each 30 44 2599-999915 Water Valve Box Adiustment, Repair and Clean_. Each 10 45 2599-999915 WatEr Valve Box, (Street) Replace Upper Sections and Lids Each 10 46 2599-999915 Hydrants MJ Each 4 47 2599-999915 Bend 150mm (6") (90 Deg.) MJ Each 1 48 2599-999915 Fitting 300mm x 300mm x 200mm (12xl 2x8) Anchor Tee Each 1 49 2599-999915 Mega Lug 300mm (12") Each 7 50 2599-999915 Megs Lug 200mm (8") Each 4 51 2599-999915 Valve, Gate 150mm (6") RS "0" Ring MJ Each 3 52 2~599-999915 Valve, Gate 200mm (8") RS "O" Ring MJ Each 53 2599-999915 Valve, Gate 300mm (12") RS "O" Ring MJ Each 7 54 2599-999915 Sleeve ~t441,200mm (8") MJ Each 1 55 2599-999915 Sleeve g44I, 300mm (12") MJ Each 9 56 2601-101200 Seeding, Fertlizing (Urban) Ha 0.3 ~7 2601-104200 Mulching -- Ha 0.3 582601-106000 Sodding M^2 6022 59 2601-109000 Watering KL 2640 O[S, ON T[^~ FELDERMAN I I'ow* oo' / o, oo uo,,, o, o s,o I DU UeU I ,~o,~c, uu~sER STP -52-1(2) --2C-31 I TABULATION OF CLEARING AND GRUBBING T-I0 STATION LEFT RIGHT [ REMARKS 1052+23.2 11,7 1054+54.8 9.2 1054+63.7 9.2 10_59+50.0 12.7 1059+53.9 12.7 I059+76.0 14.7 1059+89.9 14.0 1060+02.9 13.9 ____ TABULATION OF ASPHALT SURFACE COURSE TYPE-B 12.5 mm T-18[ MIX 75% CRUSHED PARTICALS LOCATION STATION ASPHALTIC CEMEN~-C~PA~T[~ FROM TO FROM TO AVERAGETHICICNrESS (mai-) [ ---4 1063+31 10fM&82 50 1.87 I TABULATION OF ASPHALT SURFACE COURSE TYPE-A 12.5 mm %19 [ ML'< 75% CRUSHED PARTICALS LOCATION STATION I ASPHALTIC CEMENT CONCRETE PAVEMENTI Mg FROMI TO I FI!. TO~M~D~xf~RAGETHICK]~I~a~S (mm/ ~] 1 1063+3q1064+s21 I [ 100 - 3.71 TABULATION OF S1DEWALK REMOVAL (108TZ) ST^TIONTOSTA ,ON I 1051+28.41 TO 051+72.04 53 RT. SIDI~ TABULATION OF SIDEWALK T-12 STATION TO STATION AREA I~EMAKKS m2 I051+28.41 TO 1055+83.55 426.7 RT. SIDE 1051+00.03 TO 1055+59.73 560.83 LT. SIDE 1055+87.93 TO 1058+30.45 311.4 RT. SIDE ~56 TO 1063+02.9 885 ~ 1058+44.03 TO 1059+1Y4.3 121.75 RT. STDE [ TOTAL 2305.68 NOTE: TOTAL LENGTH INCLUDES DRIVEWAYS TABULATION OF WATERMAIN PIPE AND FIXTURES %16 STATION [ PIPE SIZE LENGTH ANCHOR TEE BEND MEGA LU( VALUE SLEEVES HYDRANT FROMI TO INCH M_ 12XI2XI2 12X12X8 6" 90 De 8" 12!' 6" 8" 12" 8" 12" 1051+22,70 12 4 1 2 1 2 1 12 2 8 4 2 lO53+24.5o 6 8 i 1 1 lO54+76.5o 6 4 1 1 3 1 12 6 3 io56+oo -1o57+oo 12 1oo 1 2 2 lO58+66.1o 6 4 1 1 1 1 12 4 1 1o6o+63.6o 6 4 i i i 12 4 TABULATION OF LONGITUDINAL SUBDRAIN T-1t SHOULDER AND BACKSLOPE LOCATION LONGITUDIN_AL SUBDRAIN CLASS "A'i ROAD C~ BACKSLOPE 2 SUBDRAIN OUTLET POROUS CRUSHEr OR DEPTH RF-I 9E OR RF.22 BACKFILL STONE REMARKS LIN~ LANE D DIA. LENGTH DIA. LENGTI- NO. IDENT. STATION TO STATION SIDE M nun M mm M STATION TYPE Mg Mg 1051+09.82- 1055+59.75 LT 1.22 100 44_3.91 327 1051+08.82- i054+30.00 RT 1.53 I00 320.18 233 1054+30.00- 1055+53.85 RT 1.22 100 123.85 90 1055+87,93-1063+14.11 RT 1.22 100 726.18 527 1056+03.53 ~ 1060+38.01 LT 1.5 100 434.48 315 1060+39.02- 1061+88.24 LT 1.22 100 149.92 108 1061+88.94- 1063+ 14.81 LT 1.5 100 125.87 91 - iTOTAL 1691 mg~ *DEPTH IS BASED ON TOP OF CURB TO BACK OF TRENCH REFER TO DKAIN TILE DETAIL SUBDRAIN TO BE TIED INTO iNTAKES ADJUSTMENT OF WATER STOP BOX T-20 NO. LOCATION STATION TYPE OF FIXTURE ADJUSTMENT REMARKS I ]-1~53+20 9.6 LT S~'OP BOX 1M LT TOWARD CURB 2 10521~76.27 8.00 RT STOP ~X 1M LT TOWARD CURE 3 1053+20 9.6 LT STOP BOX 2M RT TOWARD CURB 4 1053+98.80 7.40 RT STOP BOX 1M LT TOWARD ~-URB 5 1056+74 11.22 RT STOP BOX 2M LT TOWARD CURB REMOVAL OF EXISTING CULVERTS %21 LOCATION DESCPd~TION DISPOSAL I051+43 7.94 RT CULVERT 2 1051+78 6.60 RT CULVERT 2 1052+07 7.51 LT CULVERT 2 1052.17 6.60 RT CULVERT 2 1052+32 8.90 LT CULVERT 2 105,~54 7.90 LT CULVERT 2 1052+57 6.40 RT CULVERT 2 -- 1052+84 It .xJDnL-~l' cUEVER~ 2 1052+96 8.90 LT CULVERT 2 1053+20 5.1 RT, CULVERT 2 1053+29 8.90 LT CULVERT 2 1053+65 17 LT CULVERT 2 1053+71 4.80 RT CULVERT 2 1053+89 4,80 RT CULVERT 2 1054+13 4.80 RT CULVERT 2 1059+43 0 CULVERT 2 1060+53 5.0LT CULVERT 2 1061+22 2.7 LT CULVERT 2 (2) DISPOSAL SHALL BE AS PER STANDARD NOTE 213-I NOTE: NOT A BID ITEM INCEDENTAL TO EXCAVATION TABULATION OF SODDING AND SEEDING T-14 SIDE BACKSLOP~ SEED SOD STATION TO STATION LEFT RIGHT SLOPE % M2 M2 REMARKS 1051~+.08 TO 1052+34 ~X 3:1 X 1051+.08 TO 1051+59 X 3:1 X 1052+39 TO 1053+76 X 4:1 X ~-052+34 TO 1052+51 X~ 10:1 X I052+51 TO 1055+13 X 3:1 X 1053+76 TO [05-5+16 X 3:1 X -- 1055+13 TO 1056+20 X -3:1 X 1055+16 TO 1056+70 X -3:1 X 1056+30 TO 1056+90 X 3:1 X 1056+70 TO 1058+35 X -3:1 X 1056+90 TO I058+95 X -3:1 X 1058+35 TO 1061+56 X -3:1 ~( 1058+35 TO 1060+00 X -3:I X 1060+00 TO 1060+81 X 3:1 X 1060+8I TO 1060+41 X 3:1 X 1060+4i TO 1060+90 X 10ft X 1060+56 TO 1063+32 ~- -3:1 X 1060+90 TO 1063+29 X -3:1 X 1063+32 TO End X -3:1 X 1063+29 TO End ~ -3:1 X *SOD SHALL BE PLACED WITHIN TIdE FIRST 3m BEHIND THE BACK OF CURB *TOPSOIL SHALL BE SPREAD ON ALL DISTURBED AREAS BEFORE PLACEMENT OF SOD OR SEED DES,BN rBA~ FELDERMAN [ I,ow, oct / CiTY OF DUBUQUE* OFF'ICE OF DESIGN I DUBUQUE coup. I F'ROJECT'U"B~R stp -32- 0) --2c-z, I B,B...,,E* H. O7 TABULATION OF DRIVEWAYS T-17 GRANULAR SHOULDER GRANULAR SURFACE PORTLAND CEMENT ASPHALT BINDER TYPE B SUBBASE STATION [ TYPE W~_ T}I LENGTH TF~C~NESS LENGTH THICKNESS LENGTH T~CKNESS THICKNESS M M mm M mm M mm mm 1051+43 11.76' KT 1 6 5.51 150 100 1051+78 16.0' RT I 4.6 2.44 150 7.31 100 100 1052+07 13.21' LT 1 7.6 2.44 150 4.53 100 100 1052+17 15.44' RT 2 6.3 2.44 150 6.76 i00 100 1052+32 10.58' LT 1 5.9 2.44 150 1.9 170 100 1052+54 ll.7~'LT I 3.4 2.44 150 3.07 100 100 1052+57 16.0' RT I 3,4 2.44 150 7.32 100 100 1052+84 11.33'LT 1 5.6 2.44 150 2.05 100 100 1052+96 13.49' LT 1 5.6 2.44 150 4.8I 100 100 1052+29 10.51' LT 1 3.8 2.44 150 L83 100 I00 I053+65 10.7'LT __I 5.1 2.44 150 2.02 100 100 1053+71 16.0' RT I 5.1 2.44 150 7.32 100 100 1053+89 12.83' RT 1 7.I 2.44 150 4.15 100 100 1053+95 11.77' LT I 8 5.52 150 10~- 1054+13 14.56' RT 1 6.9 2.44 150 5.9 100 100 1054+38 13.85' RT I I4.1 7.6 150 7.3I I00 100 1054+60 13.05 RT 1 --5.2 6.8 150 100 1054+67 11.I5' L'~' I 3 4.9 150 100 1054+75 11.13'LT I 7 2.44 150 2.44 100 100 1055+13 8.74' LT 1 8.7 2.44 150 1 100 100 1057+86 8.66' LT I 6.1 2.44 150 100 1058+65 9.05' R¥- 1 9.1 2.86 150 100 1058+80 13.23' RT 1 9.2 2.44 150 2.28 100 100 1059+43 16'RT I 3.3 2.44 150 7.31 100 100 060+14 14.40' RT i 4.5 2.44 150 5.72 100 100 1060+53 13.23' LT 2 9.2 2.48 150 4.55 100 100 1060+99 9.12' RT I 4.7 2.44 150 0.44 100 I00 1061+12 12.26'KT,1 1 4.5 2.44 150 3.58 100 I00 1061+61 12.95'RT I I 9.0 2.44 150 4.2 100 100 1062+28 12.18' RT 1 8 2.44 150 3.5 100 100 1062+52 16' KT i I 5.6 2.44 150 7.32 100 100 ~ff62+85 16' RT I 1 8.3 2.44 150 7.32 100 i00 1063+28 9.82' RTI 1 6.9 *2.44 150 1.14 100 ~00 TYPE 1 RESIDENT DRIVEWAY TYPE-BI TYPE 2 COMMERCIAL DRIVEWAY TYPE-B * SUBBASE MATERIAL TO BE PLACED UNDER ALL ASPHALT & PORTLAND CEMENT DRIVEWAYS %22 ADJUSTMENT OF FIXTURES NO. LOCATION STATION TYPE OF PIXUTRE ADJUSTMENT 1 I051+20.92 4ASLT WATER VALVE -0.714 2 1051+22.4~ 2.42 LT WATER VALVE -0.649 ~ 105 I+24.50 4.83u WATER VALVE .0.63 f-- 4 105I+76.55 5.85 RT MANHOLE -0.835 5 1052+58.65 4.13 RT MANHOLE -0.165 6 1054+76.47 3.87 RT MANHOLE .0.617 7 1055+30.89 L34 LT MANHOLE -0,712 8 1055+34.36 4.83 LT WATER VALVE -0.755 9 1055+36.65 2.80LT WATERVALVE -0.685 10 1055+41.08 3.80 LT WATERVALVE -0.581 iiI 1058+66.12 4.30LT WATERVALVE -0.226 ii 1058+66.32 3.60LT WATERVALVE -0.316 13 1060+63~0 1.48 LT WATER VALVE -0.048 1060+63.60 0.88 LT WATER VALVE -0.021 REMOVAL OF PAVEMENT T-23 1051+30 1063+68 ASPHALT 105l~08 MODULAR BLOCK RETAFNING WALL T-24 STATION HEIGHT REMARKS I052+20 TO 1052+51 .75 SILT FENCE T-26 STATION TO STATION 1058+65 I [ 1065+85 RT TABULATION OF PAVEMENT MARKINGS T-25 2 BROKEN CENTER LINE (YELLOW) 5 NO PASSING ZONE LINE (YELLOW) 7 EDGE LINE RIGHT(WHITE) 9 DOTTED LINE (WHITE) 11 CHANNELIlZING LINE C¢/HITE) 13 STOP LINE (WHITE) 15 YELLOW CURB 3 DOUBLE CENTER LINE (VELLOW) 6 BROKEN LANE LINE (WI-IITE) 8 EDGE LINE LEFT 0FELLOW) 10 SOLID LANE LINE (WHITE) 11 CHANNEI,IIZING LINE (YELLOW) 14 CROSSWALK LINE (WHITE) 16 WHITE CURB LOCATION LENGTH (m) ROAD STATION TO ~TATION { SIDE IDENTIFICATION~ 2 3 4 5 6 7 8 9 10 i 1 12 13 14 15 16 REMARKS 1L R _ 1051+28.87 TO 1051+83.85! ~94i 105.96 -- 1051 +28.81 TO 1051 +59.27 1.72 ' 30,40 1051+83.85 TO 1054+99.4~ 1.52 831.16 1081+88.88 TO 1054+99.4~ 1.55 531.16 10~+47.13 11.8c~ 21.6 1054+99.43 TO 1055+62.56 1.94 126.28 1085+32.18 TO 1055+82.56 1.72 3074O __ 1055+56.88 9,7£ 30.40 21.8 --- 1055+96.98 TO 1056+37.38 1.72 1055+96.98 TO 1056+35.69 1.94 77.42 1058+02.78 9.70 21.8 1056+35.69 TO 1058+28,34 1,52 385.30 1056+35.69 TO 1058+28,34 1.52 88573-0 1058+46.36 TO 1058+76.76 1,72 30.40 -- 1058+46.36 TO 1058+98.94 1,94 105.96 1058+99.94 TO 1059+50.0 1.52 102.12 -- 1058+~38.94 TO 1089+50.0 1.5~2 102,12 OESION TEAM FELDERMAN [ UET~C ~OWA ,o7 / C~TY O[ OUeUOU8 * OmCE OS OES{ON DUBUQUE couu7¥ P~OJECT ~UME~E~ STP -32-1 --2C-31 SHEET UUUeEF~ H. 08 1056+67 1056+80 1057+00 1057+20 TABU _ATION OF TEMPLATE QUANTITIES FILL CUT +20% 0 0 181.9 0 312.4 0 38.5 O 199.8 O 241.1 0 31.6 0 353.8 0 0 0 BALANCE 181.9 312.4 38.5 199.8 241.1 31.6 353.8 144.5 209.1 55.7 158.4 -- 381.6 40.9 416 156.3 177.6 105,9 346 165.4 73.1 156.6 386.7 154 76.08 63,4 212.1 60 50 270 17.04 14,2 107.7 29.4 218.7 24.5 194.2 53.28 278.2 44.4 231.8 104.88 225.1 87.4 137.7 10+57.40 1057+60 1064+00 1064+20 t064+40 1064+60 TOTALS 200.2 139.7 60.5 178.4 165,8 12.6 41.3 4.4 20 -15.6 7 6.8 0.2 5.2 10.9 -5.7 6 12.7 -6.7 4.8 5.8 -1 14474.5 T-13 09-27-94- 213-7 Unless otherwise direote(~ or authorized, all asohaltio oemen~ concrete and other bituminous materials which are not soeoifically addressed or described in the p~ans shall become tl~e properly of the contractor. The contractor in accordance with current rules end regulations of the Iowa Deoartment of Natural Resources,may: 1. With the approval of the Engineer, blend or otherwise process the material for use with shoulder or special Back fill aggerga~e, for use on the project, 2. With the aDorova~ of the ENgineer, place with material in areas designated by the Engineer as Soil Aggregate Subbase without extra charge. 3. Remove the mateiral from the project and stockpile for the contractor's future use. 10-27-98 223-20 The surface course shall be 12.5 millimeter mix. At least 95% of the aggregate retained on the 4.75 millimeter sieve shall be type 4 or better frictional classification aggregate and at least 50% retained on the 4.75 millimeter sieve shall be type 3 or better frictional classification aggregate. If type 2 is used in lieu of type 3, the minimum shall be 35% Frictional classification shall be accord with material instructional memorandum T-203. superpave gyration The percent of crushed requirements particles shall be: Nini ides Nmex Surface 75% 7 86 134 Binder 75% 7 86 134 Base (include. widening) 09-27-94 213-1 It shall be the contraotoCs responsibility to provide waste areas or disposal sites for excess material (excavated material or broken concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for material hauled to these sites. No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by the engineer. DES'ON TEAM FELDERMAN I METR,C I,owA DOT × CITY OF BUBUQUE · 0PFICE OF DES,ON I DUBUQUE COUNTY I PROJECT NUMBER STP -Z2-1(2) --2C-,~ I EHEEf NUMBER H. 09 --',--4--F--~ ..... F--',-a--F .... 4--F--',--4 .... ',--4~F~-p-=,~-k-4--F .... ~J~ ~ __[ .... ~__[_i__k .... ~__L__L_J .... 'L_J__L__', .... L__',__i__L ~ ~ J~ · / / / r r ~ ...... --,--~-~-~ ..... ~--,--~--~ .... ~--~-, ........ ~--~=-~,~= __~__,_u~ ~_, ..... ~L ...... ~ .... ~__~ .... ~__~ .... ~ ...... ~__~ ...... ~ .... ~__~ .... ~__~ .... ~ ...... ~__~ ...... ~ .... ~__~_ _~__~__,__~ .... ,_ .... ~- - ~ - -~ ..... ~ - -,- - ~-- ~ .... ~ - ~ ~ - -,- - ~ - - --,- - ~- - ~ - 4~ - ~F:J --~ ~.~-,- - ~ - - ~ - -, .... ~ .... ~ -- ~ .... ~ -- ~ .... ~ ....... ~- - ~ ...... . .... ~ _ - ~ .... ~ __ ~ .... ~ ...... ~ __ ~ ....... ~_ _,__ ~ _ _ ~ .... ~_ _~_ _._ ~ .... ,__. '" '"' '''' ' ''-'' ' ', ', ', ', ', ', ', ', ', ', ', ', ~ M~I ', ', ~, ',~J ', ~g~'~%~2~*~-2t' , , , , ~-,~ , ~ ',-~/ -'-~--',--' , , ~ , , ~ , ~ ~-,--~-, , , , , ..... ~--~ .... ~~ ~ .... 4--Ih~~--~--~ .... ~ ....... , , , ,,~-,~--4-;-,,~!i-~ , , , , , , , , ,~ , , , , , , ,, , ~ ~ ~1~~-~ , , , , , ,¢~ ,~, , , , , , , , , , , , , , , , , , , , , , , , ,, , :,,, , , - ~----J-~- · . ........... ~ ~. - .. .................. ~ .............. ~ ...... ~--,- -,--~__~__~_ _~__,__,__~_ .~__b_,__~_ _,__~ .... ,_ _~ ....... ~ ~__~ ....... ~ .... LIST OF STORM SEWER PIPE PIPE TYPE OR FORM BOTTOM GRANULAR POROUS PROFILI CLASS PIPE LENGTH SLOPE FLOW LINES MATERIAL NUMBER LOCATION STANDARD GRADE WELL NOTE LINE LOCATION "D" NOTE NUMBER DIAMETER OF LINE BACKFILL SHEET ROAD PLAN ELEV ELEV Mg NO. INLET OUTLET OTHER (incidental to longitude Elevation Elevation Elevation subdrain) % PROM t TO mm na CB1 1051 + 09.82 104B 262.76 260.71 Existing CB1A 1051 + 09.82 101 B 262.76 260.85 P-1 l lA 100D 375 11 1.00% 260.85 260.74 24,8 CB4 1052 + 50,00 101 B 273.04 271.513 P-4 3 4 100D 375 54,5 7.08% 271,51 267.65 ' 244.9 CB4A 1052 + 50.00 I01 B 273.04 271.653 P-5 4 4A 100D 375 11 1.00% 271.65 271.54 17.9 CB6A 1053 + 47.38 101 B 277.50 276.268 P-8 6 6A 100D 375 I1 1.00% 276.27 276.16 15.7 CB7 1054 + 30.00 101 B 279.38 278.02 P-9 6 7 100D 375 81.7 2,18% 278.02 276.16 175.3 CB8 1056 + 26.96 I01 B 282.40 281,15 P-11 8A OUTLET 75D 750 14,3 0.50% 281.01 280.94 12.0 CB8A 1056 + 24.01 101 B 282.48 281.01 P-12 8 8A 100D 375 IIi 1,00% 281.15 281.04 16.6 CBIOA 1057 + 02.39 101 B 283.58 282.10 P-15 10A I0 100D 375 II 1.00% 282.24 282.13 17.2 CBII 1057 + 64.88 101 B 284.46 283,14 P-I6 I0A llA 100D 450 61.2 1,42% 283.00 282.13 96.7 CB12A 1058 + 56,88 101 B 285.75 284.32 P-19 12 12A 100D 375 ll 1.00% 284.46 284.35 16.6 CBI3 1059 + 04.03 I01 B 286.42 285.22 P-20 12A 13A 100D 375 46.2 1.58% 285.08 284,35 71.0 CBI4A 1059 + 48.30 101 B 287,04 285.67 P-23 14 14A 100D 375 11 1.00% 285.70 285.81 15.8 CBISA 1060 + 39.01 101 B 288,43 286.80 P-24 14A 15A 100D 375 90.1 1.90% 285,70 287,41 117.7 CBI7 1062 + 22.24 101 B 287.32 286.09 P~27 17 17A 100D 375 11 1.00% 286.09 285,98 18.0 CBI7A 1062 + 22.24 101 B 287.32 285.95 P-28 17A 1SA 100D 375 91.3 -0.99% 285.95 285.04 190.6 Manhole 1063 + 50.96 RA50 285.85 284.517 P-31 MH1 OUTLET 75D 525 7.6 -0.53% 284.52 284.48 12.5 DESIGN TEAM FELDERMAN METRIC DUBUQUE COUN~ PROJECT NUMBER STP-32-'1(2) -~ 2C -31 SHEET NUMBER H 12, Vew 12x12x8 Anchoring Tee ~ ~ /'New 12"-441 Sleeve l WATER DETAILS DESIGNTEAM FELDERMAN METRIC IOWADOT/CITYOFDUBUQUE'OFFtCEOFDESIGN DUBUQUE COUNTY PROJECTNUMBER STP-32-1(2)-2C-31 SHEET NUMBER H.~ 13 DESIGN TEAM FELDERMAJN IOWA DOT / CITY DF DUBUQUE ' OFFICE OF DESIGN DUBUQUE COUNTY PROJECT NUMBER WATER DETAILS STP -52-~(t) --2C-51 I SHEET NUMBER H.14 DESIGN TEAM FELDERMAN METRIC IOWA DOT ' CITY OF BUBUQUE * OFF' DE OF DESIGN DUBUOUE COUNTY PROdECT NUMBER H, 15 Spring Valley Drive STRIPING STF -.32-1 --2C-31 SHEET NUMBER FI. 15 DESIGN TEAM FELDERMAN METRIC IOWA DOT CITY OF DUBUOUE * OFFICE OF DESIGN DUBUQUE COUNTY ~'RO,JECT NUMBER STP -52-1(2) --2C-31 STRIPING SHEET NUMBER n. 1 6 POINT NO. STATION OFFSET ELEVATION CURVE ~ 2~ ,-' 2~ ~-' POINT NO. STATION OFFSET ELEVATION CURVE 1 1051+12.86 JFK 6.25 Rt. 263.23 ~ ~ I 1058+17.7 JFK 6.25 Rt. 285.382 -~ / 2 1051+16.42 JFK 7.97 Rt. 263.55~ ~~ 2 1058+28.2 JFK 10.77 Rt. 285.475 3 1051+17.79 JFK 11.67 Rt. 265.85 2~3 · ~; ~3 3 1058+32.6 JFK 21.41 Rt. 258.57 4 1051+12.49 JFK 11.53 Rt. 5.3M u,~u ~+ ru+~ ~ ~" 4 1058+17.4 JFK 21.5 Rt. 15.25M o*~o a~s ~+~o o+~ ~*:o o+2s 5 1051+27.33 JFK 11.53 Rt. 265.40 5 1058+42.0 JFK 21,42 Rt. 285.57 6 1051+29.95 JFK 8.00 Rt. 264.53 6 1058+46.5 JFK 10.78 Rt. 285.70 7 1051+33.40 JFK 6.25 Rt. 264.76 7 1058+57.1 JFK 6.25 Rt, 285.936 8 1051+33.18 JFK 12.08 Rt. 5.8M 8 1058+57.3 JFK 21.55 Rt. 15.31M ~.~,~N ~,~ ~D~MAN I ~"~"'~ I'ow~ ~o~ / ~,~ o~ ~. o~,~. o~ ~,~N I ~USU~U~ ~O~N,~ ~ ~.~,~ N~..~. PT 3 POT r, / / 2 / / 2as PI # NORTHING EASTING STATION BOP 1117234.540 1728270.906 105100.0 1 1117305.022 1728241.030 105176.6 2 1117721.419 1728065.619 105628.4 3 1117898.781 1727635.259 106078.0 4 1118002.515 1727529.700 106228.0 5 1118133.008 1727409.574 106405.3 EOP 1118210.212 1727388.286 106482.7 E 1792 FELDERMAN 0ESIGN TEAM ~Tn an ~-~ ~Tn nn ~7~ nn - O SIGN EL 268.: L L O~S,ON T6A~ FELDERMAN ~L~ETR'C t,o~* DOT / C,~V O~ eueu~us* OmCE O~ O~S,O~ I DUSUQUE COUNTy I PROaECT,U,e~R STP -52-1(2) --2C-61 t SH~T,U.SE~ H. 20 .......................................... ?.__ .................. ~__ ~.~ ............................................. ~ ......... = ~ - ~ OlSION EL = 278. , J L / OES,O~ TEA~ FELDERMAN ~w* DOT / aw OF OUBU~U<* OmCS OF =ES,O. I DUBUQUE cou~w } *eOaECT*U.BSR STP -52-1 (2) --2C-31 t s.gE; NU~.~* H. 21 ............... .... - ........................ -~?~- - 7--, ~ (]RI( INAL EL = 282,8 ~ DE~;IGN EL ~280'1 ~ ~ 7RO ~~ ~8] ~fl ~ ........ ~ ~ ~ ........ ~___'_ z__ ~~ .__~ ._ .~ ..... O[ SIGN EL = 282,4 ........................... . ___~.L~ ..... ;.__Z ........ ~ ........... Z ......... ..............  ~ ~ ~ ORI( NAL EL 281.2 ~ ~ ~ ~ ..................................... ~ .............. ~- ~I O[ SIGN EL = 278,7~ ~1 I ................................................................. 9~s,o, T~a~ FELDERMAN ~ ~T~,C _l ,Ow~ OOT/ C,,. O~ OUaUOU~ * OFF, Cg O~ O~S,6, L DUBUQUE cou,r, I P~O~CT ~u~egR STP -52-1(2) --2C-51 I SH~, NUM~, H. 22 OE~N E z~7.~ 8 L ~ ,~,.. ~_~ ~-' ~ ~;--, ........ . ................................................... .___~. ................... ~ '~ ...... %~Z .......... ~ .............. ~ ~l~ % % ~¢ ~ .......................... ~ ......................................... ~ --~ ..... ~ ....... ~: 2~', ........ ............ . , - ................ ~ .... ~:~____ ...... ~ ..... ~ ...... ~~-.. ~ ............................... L .... 2%~ ~ ~ ................... ~ ,~ .............................. ....................................... ~ ..... ~ ....... --~: __~ .__~ ____~ ~_ -~.~: _~_ ._ -~ .........~_=~:=~ .... . ................ ~.~.~ ....... _ -, ..... __~__~ ~~ ............ ,~,~ ~ ...................... ~~---~ ~ ~..................... '~-~ ORI(INAL EL = 288.2 ........................... ~- _ .................................... ~ s~6~ E~ ~ 2~¢.~ .......................... ?~4 DP ORR iNAL EL = 285.~ ?a4 O0 ......................... ~: ........................... ~ ................. ~R~!N~ ~ .......... ~ ............... .......... ~. ...................... ~/~ ~ ........ ~ .... =.~ ....... -- ......... ................................................................... :~%- ................................ ~ OI SIGN EL~ ; '2~,] --- ~-=~ .................................... ~% cs,~nn ~ 'r ,.~ ~ ?fl~NN ~ ~ 9~On .m',~ ~ ..... ' ORI ;INAL EL = 285. O ~% ............ -¢ I ORI ;INAL EL' = 285, ................ ~ ~ -- -- % .......................... %-% ~-~ ..................... D SIGnaL ~ ~,~ ~ ~- ..... ~,~.-, ............................... ~ ~,o~ ~. ~ =.~ I ~ ............................... ~ ~,~ --~ -~ _~. __ ., ........ ~ ~ ~%%--~' . _ .......... --.h ~ / .- ..................... .......................... -~ ~_ %~- ~ nn ~ -'--- -~ nn 7~,~ nfl / ' ~,~ .............................. -- ............................. L ....................... . .................. ~  ''- ORIC NAL EL = 289/ .................. ~ .... ~:: ~ ¢¢ D SIGN EL : 287.(7 ?B7 NN ' ~ ~ -- ~ ~ ~7 no ~ ~ u~q nn % ~_ ORI ;INAL EL = 288.~ DESIGN TEAM FELDERMAN I METRIC I,OWA DOT / CITY OF DUBUQUE* OFFICE Or DES'GN I DUBUQUE COUNTY I PROJECT NUMBER STP -52-1(2) --2C-31 SHBET NUMBER H. 24 ~ /_. _ ....~ ............... --~-_~~_%~_ .... ---~. '?o. ........... ~ ~ ~C ......... ~ .............................................. ~ ............................ 0~l~ I~AL EL = 286,~ - -- -~-~- '~ :~ ............. ~c ~*C[t ~.: ....................................... ~--~ ...... ~ ~--~ --~- ~ ....... C~~ ........ ......................... ~ .................................. ~BION EL = 287. ~.~. .~ _-=- ~ .......... ~ ............... ~ - ............................................... i ...... ........................... , ........................ ~ ............................................................. ~___ ............................................................... c ~ -~--' ~ = --- L~- - .......... ~ ~ ............................................. ............. ~-= ~ ....... ......~- .... ~= ~-* -~ ~AV~ c2~.~ ~ .... ' .................................. ............__~._> .................................................. ~ ...... .................. ~ ................................. ~ ............................ "~ ~ ~ ~ .............. ~ -~ .................................. ~ ~ --- _ ............. --~ ............. ....... ~:'--: ~=.. .. = ~ ::- :~: -- _ 7o.~ ................ - - _-_ _ ............_:.-. ....... ......... ----- ~: ............. ................................... ............ ~ .......................................... :~ .... -~- ~ _ ~ ~,~,* ~ ~ ~-_ ~ q.z '-.. ..................................................... ....... __~ ~ O*KINAL EL : 289. 5 ~ ~ DESIGN TEAM FELDERMAN J METRIC ImWA DOT / CITY OF DUBUQUE* OFFICE OF DESIGN j DUBUQUE COUNTY j PROJECT NUMBER _~TP -52-1(2) --2C-51 J SHEET NUMBEB H. ................................. ~ ....................... ~ ~ ~_ ..................... · ~ Io7 FELDERMAN Creating a Home for full-sized Soccer Excitement... JFK Road~ at the Northwest Arterial, Dubuque, IA April 8, 2002 Honorable Mayor and Members of the City Council City. Hall 13th and Central Avenue Dubuque, Iowa 52001 Dear Mayor Duggan and. Membem of the City Council: The Dubuque S66eer Alliance hereby fries formal objection tO the City Cooncil of the City of Dubuque relative to'proposed plans to inClUde gidewalks on the east side of John F. K~nnedy Road as parr of the John~F: Kennedy Road Reconstruction project. The Support Services Committee of the Dubuque Co~ School Dio~ct, in ~r March 28, 2002, meeting with representatives of the Dubuque Soccer Alliance, sup~6ttextth~ ~bjection of the Soccer Alliance in this matter. The specific property to be assessed should sidewalks be included is Lot 2-3-1 (Parc~q[nmber 10-16-176-004) of Helen and Mary Stewart Subdivision Ln the City of Dubuque, Iowa The pr~v~ is located at 3355 John F. Kennedy Road, owned by the Dubuque Community School District angled to the Dubuque Soccer Alliance, a non-profit 50i(C) non-profit tax exempt corporation serving the yoath and other citizens of the community. Specific user groups composed of nearly 3,000 active p~pants include the Dubuque Soccer Club, the American Youth Soccer Organization, Dubuque Communi~ School District Schools and the Adult Steamers. The specific objections to the inclusion of sidewaiks on the ea~ side of Joia,. F. Kemnedy;P,;~ are based on the fact that the Dubuque Soccer Complex is not a walk in recreational facility; hance-~re is no need for sidewalks, that the Soccer Complex is a drive to site with parking stall provisions 40ff C~s, and that the construction of mmecessary s~dewalks would result in a siglfificant f'manci~ obli~tiOato the Dubuque Soccer Alliance asa property temnt under a Lease Agreement w~ Dubuque'~unitv School District. Respectfully submitted, Cc; Dubuque Soccer Alliance By Wi Joe Link, Du~uqu~ C0mmmfity School District Michael Koch~, Pablic Works Director, City of Dubuque Mike Feldermar~ ;Enginee~g Department, City;of Dubuque 290 BRADLEY STREET, DUBUQUE, iA 52003-7257 PETITION TO REVOKE SIDEWALK INSTALLATION ON JFK ROAD RECONSTRUCTION PROJECT We the undersigned land owners on JFK feel a sidewalk along the new road construction is not warranted for the following reasons. 1. Low pedestrian traffic. 2. Most of JFK on this side of Asbury road doesn't have sidewalks. 3. With the expanding of JFK most homeowners are losing driveway parking already. 4. With the additional width of adding sidewalks a large number of well developed trees and shrubs would be damaged or have to be removed. Name 10.,~2~/~ X5 ~,~-'~ 16 ~ Address 23. ~ ~ %~ 3a~o ~ 3~/~'~ ' 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44 45. 46. 47. 48. 49. 50. 51. 52. 53.