Miss Riverwalk Ph 11 & Amenit.TO: FROM: SUBJECT: MEMORANDUM April 10, 2002 The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Mississippi Riverwalk Phase II and Amenities Sealed bids were received for the Mississippi Riverwalk Phase I1 and Amenities Project. Public Works Director Mike Koch recommends award of the contract to the Iow bidder, Portzen Construction, Inc., in the amount of $3,472,612.50, which is 3.8% under the engineer's estimate. The recommendation includes the base bid and all bid alternatives, excluding bid alternate #1. The scope of work for bid alternate #1 includes the reconstruction of the area north of the train bridge. This component will be delayed to a future year to be done as part of a project that includes restoration of the Shot Tower, which is also north of the railroad bridge. For now, these funds would be available to accomplish other portions of the America's River project should funding challenges arise. The scope of work for the Base Bid components includes construction of the Riverwalk from the existing River's Edge Plaza, north to the Alliant Energy (Star Brewery) Amphitheater and the pavement area in front of the Welcome Center-Port Side Building, west to the Mississippi River Discovery Center Museum and Aquarium site. The Base Bid includes the construction of a 300-foot pier wall for docking transient boats and lower river walkway; the construction of two-sets of concrete steps which will extend from the riverfront cascading stairs; the construction of the Alliant Energy (Star Brewery) Amphitheater plaza area; and the installation of the River's Edge Plaza pavilion; and installation of ornamental lighting, decorative benches, litter receptacles, bicycle loops, drinking fountains, landscaping and automated irrigation systems. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment CC: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM Apdll0,2002 TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director Mississippi Riverwalk Phase II and Amenities INTRODUCTION The enclosed resolution provides for the award of the construction contract for the Mississippi Riverwalk Phase II and Amenities Project. BACKGROUND The Riverwalk and the downtown pathway linkages are efforts to revitalize the Riverfront, the Fourth Street Peninsula, and the Ice Harbor areas. This project is an integral part of the America's River Project. The Riverwalk Phase II project involves construction of the riverfront promenade and amenities along the Mississippi River and Ice Harbor from the existing River's Edge Plaza, north to the Alliant Energy (Star Brewery) Amphitheater and from the Welcome Center-Port Side Building, west to the Mississippi River Discovery Center Museum and Aquarium site. The Riverwalk will be constructed by placing engineered fill te cover the floodwall, placing riprap on the riverside and a grass slope on the landward side and then constructing a 15-foot wide decorative concrete pavement walkway. Riverwalk amenities include the installation of ornamental lighting, decorative benches, litter receptacles, bicycle loops, drinking fountains and shade structures. URS-BRW completed the design and construction documents for the Mississippi Riverwalk Phase II and Amenities Project. The Durrant Group will be the City's Project Manager (currently under contract for Project Management of all public improvements in the America's River Project) and provide project management and coordination services. City Engineering will also provide their normal construction engineering and inspection services. To assist staff in evaluating bid proposals received and to allow for more flexibility in selecting a scope of contract, which is in the best interest of the City, the Riverwalk Phase II project was separated into a base bid component and five (5) construction bid alternates. The following is a summary of the project bid components: CONSTRUCTION BASE BID The scope of work for the Base Bid components includes construction of the Riverwalk from the existing River's Edge Plaza, north to the Alliant Energy (Star Brewery) Amphitheater and the pavement area in front of the Welcome Center-Port Side Building, west to the Mississippi River Discovery Center Museum and Aquarium site. The Base Bid includes the construction of a 300-foot pier wall for docking transient boats and lower river walkway; the construction of two-sets of concrete steps which will extend from the Riverwalk down to the river's edge; the construction of the Conference Center riverfront cascading stairs; the construction of the AIliant Energy (Star Brewery) Amphitheater plaza area; and the installation of the River's Edge Plaza pavilion; and the construction of the Ice Harbor Park. The Base Bid includes amenities such as the installation of ornamental lighting, decorative benches, litter receptacles, bicycle loops, drinking fountains, landscaping and automated irrigation systems. CONSTRUCTION BID ALTERNATE #1 The scope of work for the Bid Alternate #1 includes the reconstruction of the area north of the train bridge to the Council Ring. This section of the Riverwalk project shall consist of decorative concrete pavement, landscaping, and amenities. This alternate is not being recommended for award. CONSTRUCTION BID ALTERNATE #2 The scope of work for the Bid Alternate #2 includes furnishing and installing four (4) shade structures along the Riverwalk. CONSTRUCTION BID ALTERNATE #3 The scope of work for the Bid Alternate #3 includes the removal of the existing guardrail fencing adjacent to the Welcome Center-Port Side Plaza and the Diamond Jo Casino docking area and the installation of new decorative fencing. CONSTRUCTION BID ALTERNATE The scope of work for the Bid Altemate #4 includes the reconstruction of the outdoor plaza area in the rear of the Welcome Center-Port Side Building. This section of the Riverwalk project shall consist of the removal of the deteriorated brick pavement and the construction of decorative concrete pavement, landscaping, and amenities. CONSTRUCTION BID ALTERNATE #5 The scope of work for the Bid Alternate #5 includes the construction of a set of pedestrian steps from the Riverwalk to the northerly side of the Alliant Energy Amphitheater and the construction of decorative concrete pavement, landscaping, and amenities which will match into the improvements north of the train bridge (when Alternate No. 1 is built at a later date). BID RESULTS Sealed bids were received for the Mississippi Riverwalk Phase II and Amenities Project on April 4, 2002. The Iow bid was submitted by Portzen Construction, Inc. of Dubuque, Iowa in the amount of $3,679,324.85. The following is a summary of the bid proposals received: Base Bid: Bid Alternate #1: Bid Alternate #2: Bid Alternate #3: Bid Alternate ~4: Bid Alternate #5: Portzen Construction, Inc. $ 3,155,754.60 206,712.35 98,836.00 96,763.20 76,481.40 44,777.30 Tschiqgfrie Excavating Co. $ 3,218,800.50 195,388.56 132,200.00 90,986.16 69,612.85 42,101.34 Total Project Bid: $ 3,679,324.85 $ 3.749._089.41 DISCUSSION Upon reviewing the bid proposals received, staff is recommending the construction base bid and all bid alternates excluding bid alternate #1 be approved at this time. Bid Alternate #1 would be included in a future expanded project to include site improvements around the Shot Tower area. For now, these funds would be available to accomplish other portions of the America's River project should funding challenges arise. RECOMMENDATION I recommend that the construction contract be awarded to Portzen Construction, Inc. in the amount of $3,472,612.50, which is 3.8% under the engineer's estimate. BUDGET IMPACT The construction cost estimate for the Mississippi Riverwalk Phase II and Amenities Project is as follows: Construction Contract-Base Bid Bid Alternate #1: Bid Alternate #2: Bid Alternate #3: Bid Alternate #4: Bid Alternate #5: Estimate Bid $ 3,233,409.81 $ 3,155,754.60 208,214.50 166,000.00 98,836.00 112,200.00 96,763.20 53,700.50 76,481.40 42,971.00 44,777.30 Contingency 375,040.00 375,040.00 Construction Engineering & inspection 198,577.00 198,577.00 Total Project Cost $ 4,390,112.81 $ 4,046,229.50 The Mississippi Riverwalk Phase il and Amenities Project is funded in the current capital improvement budget and includes $2,354,250 of G.O. bond funds sold in December 2001, a 9500,000 Iowa DOT State Trails grant, a $150,000 DRA grant, a DRA Surplus Distribution (91,383,885) and private donations (9150,000) for a total of 94,538,1 35. ACTION REQUESTED The City Council is requested to adopt the attached resolution awarding the construction contract to Portzen Construction, Inc. Prepared by Robert Schiesl, P.E., Civil Engineer cc: Pauline Joyce, Administrative Services Manager Laura Carstens, Planning Services Manager Jim Kolf, Project Manager RESOLUTION NO. 215-02 RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on the 20th day of February, 2002, plans, specifications, form of contract and estimated cost were filed with the City Clerk of Dubuque, Iowa for the Mississippi Riverwalk & Amenities Project. Whereas, notice of hearing on plans, specifications, form of contract, and estimated cost was published as required by law. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications, form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost for said improvements for said project. Passed, approved and adopted this 15th day of April, 2002. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk day of A~ '1 ~ 2002. / T-errance M-. Dugg.~'~,l y RESOLUTION NO. 216-02 AWARDING CONTRACT Whereas, sealed proposals have been submitted by contractors for the Mississippi Riverwalk Phase II & Amenities Project pursuant to Resolution No. /'~/,Y:~..~and notice to bidders published in a newspaper published in the City of Dubuque, Iowa on the 26th of February, 2002. Whereas, said sealed proposals were opened and read on the 4th day of April, 2002, and it has been determined that the bid of Portzen Construction, Inc. of Dubuque, Iowa, in the amount of $3,472,612.50 was the lowest bid for the furnishings of all labor and materials and performing the work as provided for in the plans and specifications. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the contract for the above improvement be awarded to Portzen Construction, Inc. and the Manager be and is hereby directed to execute a contract on behalf of the City of Dubuque for the complete performance of the work. BE IT FURTHER RESOLVED: That upon the signing of said contract and the approval of the contractor's bond, the City Treasurer is authorized and instructed to return the bid deposits of the unsuccessful bidders. Passed, approved and adopted this 15th Attest: day of April ,.20Q2. Terrance M. Duggan, Mayor Jeanne F. Schneider, CMC, City Clerk ITEM NO. CONTRACT ITEM BASE BID MOBILIZATION 2 FIELD OFFICE SITE SAFETY AND SECURITY CONSTRUCTION STAKiNG DEWATERING 6 CLEAR AND GRUB TP~E CITY OF DUBUQUE, IOWA MISSISSIPPI RIVERWA/K PHASE II BID TABULATION FORM ENGINEER'S ESTIMATE BIDDER'S NAME: PORTZEN CONSTRUCTION, INC, BIDDER'S NAME: TSCHIGGFRIE EXCAVATING CO, UNIT UNIT TOTAL PRICE TOTAL ]~RICE TOTAL $94,321.81 $61,50000 $61,500.00 $4,00000 $3,00000 $3,00000 $15,00000 $10~000 00 St0,000.00 $54~79R40 $33a000 00 $33,000.00 $20,00000 $30~000 00 __ $30,00000 $4~200 00 $200.00 $4,20000 $4,000.00 $4,000.00 $4,000.00 $4~000.00 $4,000.00 $4~000.00 $22~400.00 $1200 $19~200.00 $65~600.00 $1890 $61~992 00 $68,690.50 $19.40 $72~032.20 $92~308.00 $400 $92,308.00 $344,265.00 $13.60 $312~133 60 $3~295 00 $5.20 $3,42680 $43~875.00 $13.60 . $44~200.00 $600,00 $13.00 $650.00 __ $500.00 $1200 $600.00 $4.84 $242.00 $20~000.00 $19~215 00 $19~215,00 $21,800.00 $21~800 O0 $351000.00 $331000.00 $331000.00 $33~200,00 $33~200 00 $150~000 00 $253~00000 $253,000.00 $221~000.00 $221~000.00 $~528,748 O0 $974.00 $383175600 $11059.63 $417149422 $4,440.00 $95.00 - $14,060.00 $90.00 $13~320 00 $16,16700 $5,40 $29~100 60 $4.19 $22,579.91 $7,029 O0 $5.95 $9,293.90 $5 06 $7,903 72 $153~910 00 $7.10 -- $2t 8~552.20 $691 $2121703.62 $198,901.50 $7.70 -- ~161~214.90 $801 $167~705.37 $282,150.00 $805 $227~130 75 $885 ~249~702 75 , $50000 $1~500 00. $1,500 00 $700.00 $700.00 $6~040.00 $1350 -- $10,192 50 $2145 $16,19475 $5,34000 $27.50 $9,79000 $2365 $8~419 40 -- $9,720 00 $5775 $46177750 $3[00 $25~110.00 $1~045 O0 $1750 -- $3,32500 $2318 $4,40420 $15,30000 $38.15 $38,913.00 $3100 $31~620.00 $3,952 50 $1750 $9~222.50 $2318 $12,215.86 $16~300 00 $15000 $24~450.00 $130.00 $21~190.00 $24~000 O0 $1,053.00 $50,544.00 $560.07 $26~883 36 $62500 $50000 $2~500 O0 $479.30 $2~396 50 $50000 $14,000 00 $775.00 $21,70000 $707.02 $19~796 56 $t~000.00~ ___ $18~000 00 $1,05000 $18,900 00 $1~053.44 $18~961 92 CITY OF DUBUQUE, IOWA MISSISSIPPI RIVERWALK PHASE II BID TABULATION FORM ENGINEER'S ESTIMATE BIDDER'S NAME: PORTZEN CONSTRUCTION~ INC, UNIT PRICE TOTAL ;134.40 $7,25760 $51.45 $41a623.05 ;702 00 $2~808.00 ;555.00 $2~220.00 ;837.00 $I2~555.00 ;7720(1 $6~176.00 ;151.00 $1~$10.00 ;475.00 $4,750.00 $95~000 O0 $95,000,00 $6,600.00 __ $19~800.00 $2,80000 $5~600 O0 $250.00 $2~500.00 $1~800 O0 $3,60000 $525.00 $1~050.00 $30.00 $1~740.00 $350 $2~422 00 $550.00 $2~200.00 $1,80000 $3~600.00 $25.00 $1,075.00 $20000 $400.00 BIDDER'S NAME: TSCHIGGFRIE EXCAVATING CO. UNIT PRICE TOTAL $128.00 $6,91200 $49.00 _$39,641.00 $807.20 $3~228 80 $807.20 $3,22880 -- $1~120 26 $16~803 90 $95702 $7~656 16 $201.94 $2,019.40 $620~00 $6,200 00 $134,00000 $134~000.00 $12~600.00 $37~800.00 $2~475 00 $4,950.00 $196.70 $1,967.00 $1~629 50 $3~259.00 $67930 $1,358.60 $32.28 $1,872.24 $513 $3~549 96 $659.00 $2,636.00 $3~694.00 $7,388.00 $22.87 $983.41 $449.33 $898.66 $375.00 $75000 $449.33 $898.66 EA 7 $40000 $2,80000 $30000 $2fl00~00 $336.40 $21354.80 LF 16 $25000 $~000.00 $22500 $3~60000 $17823 $2,851.68 EA I $25000 $25000 $600.00 $60000 $246.00 $~6.00 EA I $15000 $150,00 $500.00 $50000 $136.67 $136.67 EA I $15000 $15000 $50000 $500.00 $314.90 $314.90 CY I $35000 $35000 $100.00 $10000 $96.23 $96.23 LF 83 $250.00 $20~750 00 $125.00 $10~375.00 $216.34 $17,956.22 EA 9 $350.00 $3,150.00 $28500 $2,565~00 $43578 $3,922.02 EA 5 $15000 $75000 $1,35000 $6,750.00 $1,27800 $6,390.00 EA 2 $350.00 $70000 295000 $3,90000 $437.68 $87536 EA I30 $20.00 _$_2~,600.00 $3200 $4,16000 $39.95 $51193_.50 EA 74 $25.00 $1,850.00 $40.00 $2,960.00 $43.31 $3~204.94 LF 20 $55.00 $1~I00.00 $48.00 $960.00 $5474 $1~094 80 LF 20 $150.00 .$~3 000.00 $100 00 $2,00000 $113 01 $2~260.20 LF 416 $&00 $3~328.00 $750 $3d20 00 $17.88 $7,438.0~8 EA 641 $1600 $10~256.00 $12.00 $7,692 00 $18.54 $11~884 14 EA 3 $25000 $75000 $75.00 $22500 $277.70 $83310 EA I $350.00 $35000 $100 00 $I00 00 $277.70 $277 70 LF 40 $15.00 $60000 $4000 LF 23 $_[:60000 $18.89 $75560 $20.00 $46000 $3500 $80500 $2324 $534 52 LF 40 $15.00 $60000 $1500 $60000 $19.22 $76880 CITY OF DUBUQUE, IOWA MISSISSIPPI RIVERWALK PHASE II BID TABULATION FORM ENGINEER'S ESTIMATE BIDDER'S NAME: BIDDER'S NAME: PORTZEN CONSTRUCTION~ INC, TSCHIGGFRIE EXCAVATING CO. UNIT UNIT UNIT PRICE TOI~L PR[CE TOTAL PRICE TOTAL $750.00 $1150000 $225,00 $45000 $247.13 $49426 $500.00 $1.000 O0 $1.500~00 $3.00000 $596.00 $1.19200 $275.00 $55000 $500.00 $1~000 O0 $447.00 $89400 $12.00 $312.00 $5000 $1~300 O0 $14.90 $38740 $300 $4,050~00 $6.00 $8~100.00 $233 $3~145.50 $3.00 $26,256.00 $300 $26,256.00 $3.17 $27~743 84 $3.00 . $4~500 O0 $3.00 $4~500.00 $2.55 -- $3~825.00 $20.00 $480.00 $I500 $36000 $14.83 $35592 $20,00000 __$20,00000 $40,169.00 ~$40,169 O0 $38~256.00 $38,25600 $30000 $ 1.800.00 $25000 $ 1,500 O0 $329.50 $1.97700 $50000 $3,000.00 $315.00 $1~890 O0 $250.00 $1,500.00 $2.00 $40000 $5.00 $1~000.00 $450 $900.00 $150.00 $150.00 $300,00 $30000 $20000 $20000 $300.00 $900.00 $250.00 $750.00 $15200 $456.00 $250.00 $750.00 $100.00 $300.00 $109.33 $327.99 $100.00 $200.00 $75.00 $15000 $140.00 $28000 $3~000 O0 $3~000 O0 ~2~500 O0 $2~500.00 $3,520~00 - $3~520.00 $3~50000 $3,50000 $3.00000 $3~000 O0 $4.400.00 $4~400 O0 $2000 $1,18000 $2500 $1~475.00 $2366 $11395.94 $2,50000 $2,500~00 ~$2,250.00 $2,250.00 $67000 $670.00 $200 $50000 $12~00 $3.00000 $5.90 $1,47500 $25.00 $525.00 $50.00 $1,05000 $1476 $309.96 $5000 $15000 $50.00 $15000 $4967 $149.01 $5000 $600.00 $5000 $60000 $282.67 $3,392.04 __~2~ 10000 $75,60000 $2.25000 $81,000.00 $2.50000 $~90~000.00 $4.40000 $5¢.800 O0 $~4~810.00 $~7~720. 00 $5.30000 $63~600 O0 $35000 $3,50000 $35200 $3.520.00 $19000 $1~900 O0 $50000 $6,000 O0 $85000 $ 10.200.00 $50000 $6~000 O0 $5 50 $34~441 00 $480 $30.05760 $2 O0 $12.52400 $1 50 $22~980 O0 $1 O0 $I5,320 O0 $0 45 $6.89400 $1 25 $8,242 50 $090 $5~934 60 $040 $2,63760 $7~500 O0 $7.50000 $6.70000 $6,70000 $2~750 O0 $2,75000 YFEM NO. CONTRACT ITEM 120BPOWER PEDESTAL (BREWERY PLAZA) 121 TORO EZ-AD~JST ROTORARY S PR INKLE]~ NOZZLES, ADJ USTA BLE 122 TORO 570Z~PRX-4P-COM, 4" SPRAY HEAD, PRESS. KEG , SIdUT-OFF, C'K VALVE BID ALTERNATE #1 156 RIPRAP CLASS B BORROW (STONE ILEVETMENT) 157 GRANLrLAR BORROW (CV) 158 COMMON EXCAVATION (BV) CITY OF DUBUQUE, IOWA MISSISSIPPI RIVERWALK PHASE II BID TABULATION FORM ENGINEER'S ESTIMATE CONTRACT UNIT UNIT QUANTITY PRICE TOTAL EA 2 $500.00 $1,00000 EA 149 $5300 _$7~897.00 EA 84 $26.50 $2,226.00 EA 97 $5250 $5,092 50 EA 35 $13200 $4~620 00 EA 5 $250,00 $1~250 00 LS I $4,00000 $4,000.00 LS I $5,000.00 $5~000.00 LS I $3~000 00 $3~000.00 LS I $5~000.00 $~5~000.00 EA 12 $31500 $3~780.00 EA 54 $8000 $4,320.00 LF 1125 $1.00 $1~[25.00 LF 400 $1.60 $640.00 LF 2346 $2.10 $4~926 60 LF 2218 $4.50 $9~981.00 EA 2 $250.00 $500.00 EA 2 __$1~400.00 $2,800 00 EA 4 $15000 $60000 LF 6613 $0.50 $3~306.50 LF 1605 $1.00 $1~605 O0 EA 56 $400.00 $22~400 00 EA 11 $35000 $3~850 00 EA 7 $400.00 $2~800 00 EA 44 $35.00 $1~540.00 EA 60 $3500 $2~100 00 EA 1678 $I500 -- $2~5,170.00 EA 80 $1500 $1,200 00 LF 503 $200 $1~006.00 CY 132 $45.00 ~40.00 SY 843t $1.50 $12~646 50 ACRE 2 $3,000.00 $6,000 00 8Y 2219 $300 $6~657 00 LF 4309 $350 $15~08150 EA 3 $100.00 $300.00 EA 54 $6.00 $324.00 BIDDER'S NAME: BIDDER'S NAME: PORTZEN CONSTRUCTION~JNC. TSCHIGGFRIE EXCAVATING CO. $39.90 $5,945A0 $38.00 $5,662.00 $18.40 $I~545 60 $17.50 $1~470 00 $30.50 $2,95850 $29.00 $2~813 00 $12500 $4137500 $119.00 $4,165.00 $17850 $892.50 $170.00 $85000 $5,775.00 $5~775.00 $5~500.00 $5,500.00 $4~610 00 $4,610.00 $4~388.00 $4~388 00 $857.00 $85700 $62500 $625.00 $3,875.00 $3,875 00 $3,500.00 $3~500.00 $183.75 $2~205.00 $175.00 $2fl00 00 $75.60 $41082A0 $7200 $3~888 00 $0.90 $1~012 50 $0.85 $95625 $1 75 $700.00 $1.65 $66000 $2.05 $4,80930 $195 $4.20 $87.20 $1~628.00 $63.00 $065 $135 -- $9~315.60 $4.00 $17440 $8300 $3~256.00 $1~550.00 $25200 $6000 $4,298.45 $0.60 $2d66.75 $1.25 $462.00 $25,872.00 $420.00 $28350 $3fl18 50 ~270 00 $31500 $2~205 00 $300.00 $37.80 $1,66320 $36.00 $5985 $3~59I 00 $57.00 $9.45 $15~g57 10 $900 $6.80 $544.00 $650 ~4,574.70 $8,87200 $166.00 $3,967.80 $2,970.00 $15d02 00 $52000 $13.60 $520 BASE B][D TOTAL: $I9.40 $420 $2,11260 $400 $2~012.00 $42.00 $5~54400 $40.00 $5,280.00 $120 $10~117.20 $115 $9,695.65 $2,57500 $5,150.00 $2,45000 $4,900.00 $340 $7~544.60 $3.25 $7,211 75 $3.00 $I2,927.00 $1.70 $7,32530 $82500 - - $2~475.00 $1~302 92 $3,90876 $1000 $54000 $3560 $1~922 40 ITEM NO. CONTRACT ITEM 159 TOPSOIL BOR~.OW (LV) 160 CRUSHED AGGREGATE BASE (LV) 161 $1JBORADE CORRECTION EXCAVATION (BV) 162 CONSTRUCT LIGHT FOUNDATION 163 INTEGRALLY COLOKED CONCILETE WA LKWAY - 4" DEPTH 164 INTEGRALLy COLORISD CONCRETE WALKWAY WITH THICKENED EDGE - 4" DEPTH CITY OF DUBUQUE, IOWA MISSISSIPPI RIVERWALK PHASE II BID TABULATION FORM CONTRACT UNIT QUANTITY CY 75 TON 50 CY 50 EA 6 SF 3033 $F 2948 LS LS 1 SY 655 EA 3 LF 30 LE 354 1 LS t LS l LF 193 LF 50 LF 100 SY 300 BIDDER'S NAME: BIDDER'S NAME: ENGINEER'S ESTIMATE PORTZEN CONSTRUCTION~ INC. TSCHIGGFRIE EXCAVATING CO, UNIT UNIT UNIT PRICE TOTAL PRICE TOTAL ' PRICE TOTAL $1350 $1,012 50 $1360 $1,020 00 $22.67 $1,700.25 $12,00 $600 00 $1300 $650,00 $13.83 $691,50 $10.00 $50000 $500.00 $5,00 $5.50 $15,00000 $15,000.00 $25.00 $1,20000 $160.00 $6000 $500.00 $12,00 . $600.00 $4,84 $242.00 $3,00000 $1,05300 $6,318.00 $500.00 $3,000.00 $15,16500 $710 - $21,534.30 $6.91 -- $20~958 03 _$]6,214 00 $7,40 $21,815.20 $775 $22,847.00 $15,00000 $12,935.00 $12,935.00 $15,110.00 $15,110.00 $15~000.00 $t0~100,00 $10~100 00 $14,51000 . $14,51000 $16,375,00 $3780 __ $24,759.00 $36.00 $23,5}1000 $3,600.00 $83700 -- $2,511 00 $911.00 $2~733,00 $4,80000 $134.40 $4,032.00 $12800 $3,840.00 $21~240.00 $5145 __$18~213 30 $49.00 -- $17~346.00 $2,00000 $775.00 $3~100.00 $88900 $3,556.00 $3,500.00 $3,50000 -- $2,800 00 $2,800.00 $2,47500 $2147500 EA 2 EA 6 LF 2747 LF 7784 LF 2826 EA 5 EA 57 EA 18 EA 7 EA 2 LF 260 LF 190 LF 60 LF 1000 LF 250 EA 167 EA $53.00 $2550 $52.50 $I32.00 $1,453.50 $1840 $1,048.80 $17.50 94500 $3050 $549.00 $2900 9~00 $125.00 $87500 $11900 $31500 63000 $2.00 520.00 $210 $450 $050 $370.00 $17500 $220 $57200 $205 399.00 $1.75 $33250 $165 $100 $185.00 270.00 $4.20 50000 $25200 $400 $65000 $060 ;997.50 250.00 $337,50 $125 ;52200 ;833.00 ;35000 ;53300 ;313.50 ;240.00 ;60000 ;312.50 LF 295 $200 $59000 $420 ~1,23900 $4.00 $1,18000 CY 23 $4500 $10350~0 $42.00 $96600 $40.00 $920.00 SY 383 $150 $57450 $1.20 $45960 $115 $440.45 ACRE I $3,000 O0 $30g_O00 __$2,575 O0 $2,575 O0 - $2,450.00 $2,450.00 ITEM NO. CONTRACT ITEM 201 SODDING 202 FUKNISH AND INSTALL SILT FENCE (TYPE HEAVY DUTY) 203 FURNISH AND INSTALL BALE CIcLECKS BID ~4LTEPdVdTI~ #4 208 STANDARID CONCRETE WALKWAY - 4" DEPTH 209 INTEGRALLY COLORED CONCRETE WALKWAY - 4" DEPTH 210 SALVAGE LIGHTING UNIT 2I ISAWCUT CONCRETE OR BITUMINOUS PAVEMENT (FULL DEPTH) 212 REMOVE PAVEMENT (KEGARDLESS OF TYPE OR DEPTH) 213 REMOVE LlOlcI'l' FOUlqI)ATION BID ALTERNATE #$ 216 CONSTRUCT STAIRWAY #3 217 INTEGRALLY COLORED CONCRETE WALKWAY - 6" DEPTH 218 INSTALL OWNER FURNISHED BRICK PAVERS 219 ADJUST WATER VALVE & BOX 220 REMOVE PAVEMENT (REGAKDLESS OF TYPE OR DEPTI~ 221 FURNISH AND INSTALL BIKE LOOP 222 FURNISH AND LNSTALL CONCRETE BOLLARD 223 FURNISH AND FNSTALL LITTER KECEPTACLE 224 FURNISH AND 12qSTALL HANDRAIL 225 FURNISH AND INSTALl, STEEL EDGER 226 SODDING CITY OF DUBUQUE, iOWA MISSISSIPPI RIVERWALK PHASE II BiD TABULATION FORM EA 4 EA 4 LF 603 LF 786 SI: 3258 SF 7252 EA 3 LF 325 SY 1[68 EA 3 LF 50 LF 325 ENGIN EER~S ESTIMATE BIDIDER'S NAME: PORTZEN CONSTRUCTION, INC. BIDDER'S NAME: TSCHIGGFRIE EXCAVATING CO. UNIT UNIT UNIT PRICE TOTAL PRICE TOTAL PRICE TOTAL $300 $615.00 $340 $697.00 $325 $66625 $350 ~-- $2,36250 $3.00 $2,02500 $I70 -- $11147.50 $600 $72.00 $1000 $120.00 $35.60 $427.20 $40,000.00 $ 160~000.00 $24,000.00 $96,000.00 $32,000 00 __ $128~000.00 $1,500.00 $6,000 O0 $709.00 $2,83600 $1,050.00 $4,20000 $160.00 $961480,00 $134.40 $811043.20 $128.00 $771184.00 $20.00 $15~720.00 $20.00 $15~720.00 $17.56 $13~802.16 $3.00 $9,77400 $5.40 $17,593.20 $4.11 $13,39038 $500 --. ~36,260.00 $7,10 $51,48920 $691 ~50,111.32 $500.00 $1,50000 $315.00 $94500 $25000 $750.00 $3.00 $97500 $3.00 $97500 $3 17 $1,03025 $3.OO $3,50400 $300 $3,504.00 $Z55 $2~978 40 $150,00 $450.00 $25000 $750.00 $250.00 $750.00 $2.00 $100 00 $500 $250.00 $1.00 $50.00 $3.50 $1,t37 50 $3.00 $97500 $1.70 $55250 LS I $20~000.00 ~20~000.00 SF 1006 $950 $9,557.00 SY 256 $25.00 $6~400 00 EA 2 $25000 $500.00 SY 290 $3.00 $870.00 EA 6 $20000 $1~200 00 EA 2 $100 00 $200.00 EA I $50000 $50000 LF 54 $6000 $3,240 00 LF 10B $2.00 $216 00 SY 96 $3.00 $288.00 $20~245.00 $2~245.00 $17,185 00 $17,18500 $7.70 $7,746.20 $80I $8~05806 $37.80 $91676.80 $36.52 $9~34912 $250,00 $50000 $120.53 $241.06 $3.00 $87000 $3.17 $91930 $151.00 $90600 $200 00 ~$1~200.00 $250.00 $500.00 $43490 $86980 $775.00 $77500 $88900 $889.00 $~5.1.4~5 ..... $2,775 30 $49.00 - $2,646 00 $4.20 $453 60 $400 $432.00 $3.40 $326 40 $3 25 $312.00 iTEM NO. CONTRACT ITEM BID SUMMARY CITY OF DUBUQUE, IOWA MISSISSIPPI RIVERWALK PHASE II BID TABULATION FORM ENGINEER'S ESTIMATE CONTRACT UNIT UNIT QUANTITY PRICE TOTAL ENGINEER'S ESTIMATE BASE BID $3~233~409.81 -- BID ALTERNATE #1: $208~214.50 BID ALTERNATE #2: $166,000 ~0 BID ALTERNATE #3: $I12,20000 BIDDER'S NAME: BIDDER'S NAME: PORTZEN CONSTRUCTION_ I~LNC. TSCNiGGFRIE EXCAVATING CO. UNIT UNIT PRICE TOTAL PRICE TOTAL BIDDER'S NAME: BIDDER'S NAME: PORTZEN CONSTRUCTION, INC. TSCHIGGFRIE EXCAVATING CO. BASE BID: $3~155~754.60 BASE BID: $3,218~800.50 BID ALTERNATE #h $206~712 35 BID ALTERNATE #1: $195~388 56 BID AI~FERNATE #2: $98~836 00 BID ALTEKNATE #2: $132~200 00 BID ALTERNATE #3: $96~763.20 BID ALTERNATE #3: $90~986 I6 BID ALTERNATE #4: $76~48 L40 BID ALTERNATE #4: $69~612 g5 BID ALTERNATE #5: $44,77730 BID ALTERNATE #5: $42~101 34 MEMORANDUM April 12, 2002 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Design Documents for the Mississippi Riverwalk and Amenities Project The City Council is scheduled to award the construction contract for the Mississippi Riverwalk, and Amenities Project at the April 15th meeting (Public Hearing #10). A request has been made for typical cross-sections and plan views of the project for review prior to the public hearing. Attached are the following design documents for the project: Page: Sheet Number: Desiqn Item: 1 45/120 2 34/120 3 72/120 4 73/120 5 8/ 120 6 37/120 7 75/120 8 95/120 9 12/120 Overall Plan view of project Plan view with break of 3 sections Boat dock/sidewalk behind wall Stairs connect to dock Cross section of stairs/boat pier Cross section Stairs for Education and Conference Center Amphitheater Cross section Amphitheater Michael C. Van Milligen ~- MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Michael A. Koch, Public Works Director Pauline Joyce, Administrative Services Manager ICE BARBOR I RIVERVALK #3 NOTES) NOTES~ I) COORDINATE CONSTRUCTION ~ITH ADJACENT MUSEUM, HDTEL/WATERPARK & CONVENTION/CONFERENCE CENTER PRDJEOT$ R) CONTRACTOR ~ILL OLEAN AND SECURE CDNSTRUCTIDN SITE THE FIRST ~EE~ENO IN AUGUST FOR THE 'TASTE OF 9UBUQUE' CELEBRATION, THE CITY WILL TAKE NO RESPONSIBILITY fOR INJURy, DAHAGE, THEFT, OR OTHER ACTIONS AT THE CONSTRUCTION SITE, OTHERS I~ISBIBSIPPI ONMENTIDN/CDNFERENOE (UNBER CnNSTRUCTinN MISSISSIPPI RIVERWALK PHASE CITY OF DUBUQUE ~ ~E ROD /--SEE NEXT SHEET RAClUS EXIST. WALKWAY EXIST. WALKWAY~- / / "~- ____ / / / WALKWAY/ PROP. WALKWAY / SHEE'JPIUN SCS BW 2/22/2002 ~--SHEETPIUNG 13'-D" MAX. SPACING (TYP.) PIER PAYMENT LIMITS EL A" EXP. NTEGRALLY COLORED CONC. "A" SEE EL, BO9.~-... ~" EXP, JOINT- COLORED CONCRETE UMIT- ~" EXP. EL SHEE]PILING STAIRWAY #1 ITEM QUAN. UNITS STRUCTURAL CONCRETE 29 CU, YD. REINFORCEMENT BARS 2420 POUND MISSISSIPPI RIVERWALK PHASE II CITY OF DUBUQUE 602.5 / / 12'-O'INTEGRALLT COLORED -CONCRETE WALK-~' DEPTH CTYP.) 5ER DETAIL ;~AHP HANDRAIL /-CTTP.D 5ER DETAIL G' INTEGRALLY COLORED CONCRETE /-WALK-WITH A Z'X2' GRID- /COLOR 'A' CTTP,D LITTER RECEPTACLE CTTP.) /-SEE DETAIL G' BENCH CTYP.) DETAIL TOE OF 5,1 SLOPE I5'-0' INTEGRALLY COLORED '-CONCRF'TE WALK WITH THICKENED EDGE CTTP.) 5ER DETAIL I LEXPANSION JOINT CTTP.) SEE INTEGRALLY COLORED CONCRETE PAVEHENT., EXISTING CONCRETE DETAIL COLORED CONCRETE WALK-COLOR 'D' CTYP.) JOINT G' STANDARD CONCRETE WALK DETAIL INTEGRALLY COLORED ~-)'~,~ CONCRETE WALK '~,_.PROTECT EXISTING -COLOR 'A' CTT?D MOORING ~SASE 2/22/2002 SINGLE LUMINAIRE PEDESTRIAN LIGHT CTYP.).,~' SEE DETAIL 2'-0' WIDE INTEGRALLY COLORED WALK-COLOR F,, CTTP.3 PREOA$- PLANTER / POT ~2 WITH ANNUAL5 PLANTED'-' BT OTHER5 CTTP.) SEE DETAIL SHEET PILING WITH CONCRETE CAP CTYP.) 5ER PIER SECTION AND DETAIL5 MISSISSIPPI RIVER \ x__EMERGENCY CALL BOX CTYP.) 5ER DETAIL INTEGRALLY COLORED SEAT/STEP ~--e PEDESTRIAN NODE-COLOR 'B' CTYP.) SEE DETAIL DRYSTACK -LIMESTONE WALL CTYP.) 5ER DETAIL MISSISSIPPI RIVERWALK PHASE II CITY OF DUBUQUE ~ 10 20 I NFILL WALL OPENING WITH CONCRETE -SEE CLO.SURE'"~ GATE tNPfLL DETAIL~ PROTECT EXI.STIRG FLOODWALL.~ \. REHOVABLE STAIR HANDRAIL .SEE DETAIL5 LIHE.STONE WALL 5ER DETAIL SHEET PILING WITH CONCRETE CAP CTYPD 5ER PIER SECTION AND DETAIL5 &TANDARD CONCRETE WALK CTYPD 5ER DETAIL LITTER RECEPTACLE CTYP.) t-SEE DETAIL 5MADE .STRUCTURE CTYP.) .SEE DETAIL (BID ALTERNATE :~2.) 8' BENCH CTTP.) DETAIL 3.5' INTEGRALLY COLORED --CONCRETE WALK WITH CTY?..) 5ER DETAIL PLANTER POT ~: 2 CTYP.) ANNUAL& PLANTED BY OTHER.S 5ER DETAIL INTEGRALLY COLORED CONCRETE WALK WITH A Z'XZ° GRID-COLOR 'A' CTYP.) INTEGRALLY COLORED .SEAT/.STEP PEDESTIAN NODE-COLOR B CTYP..) 5ER DETAIL INTEGRALLY COLORED OONCRETE A CTTP.) 5FE STAIR ~3. DETAIL REHOVALBLE .STAIR CTYP.) .SEE DETAIL 5LOPED STANDARD CONCRETE 5ER DETAIL MISSISSIPPI RIVER THICKENED EDGE RAISE GATE WELL -SEE UTILITY PLANS-~ + DETAILS~ G' BENCH CTYP.) 5ER DETAIL~ ~'-'NORHAL WATER LEVEL 5INGLE LUMINAIRE 'PF'DESTRIAN LIGHT CTYP.) 5ER DETAIL CONCRETE PAVING o FIXED OBJECT CTYP.) SEE DETAIL"~ 34.320-005 JCO iHS-07 MISSISSIPPI RIVERWALK PHASE CITY OF DUBUQUE 0 5 10 20 HARDSCAPE PLAN EXIS33NG RIVER BOTTOM CONCRETE RIVERWAL~ - SEE DETNL (MATCH TOP OF FLOODWALL) PEDESTRIAN NODE - BEE D SEAT/STEP AT PEDES~IAN NODE - SEE DETAIL- WALKWAY GRANULAR EXISTING TOP OF RIPRAP - 18" DEPTH (MAY INCLUDE SALYASED RIPRAP) UMESTONE BLOCK BENCH STNRWAY ~1 LANDING -- SEE D PIER - SEE DETAIL -- EL VARIES FROM 601.5 TO NWL SDS.O± (V^R~ES)· LWL 592.0± RIVER BOTTOM (1RAN.~J'RON TO EXIS~NG RIVER BOT¢OM) ! REMOVE ~y MECHANICAL BREDGING~ SEE GRADING PLAN (NO BYDRAUUC DREDGING aLLOWED) fEXIS33NG HYDRAUUCl FILL----~~ SEE DETAIL 4G CONCRETE PLOODWALL - 6" DEPTH EXIERNG SLOPE EXIS~NG BEDOING MATERIA~ TO REMAIN N PLACE (~5" DEPTH) ~EXISTING IMPER¥1DUS FILL ~'---EXIS~NG TOE DRAIN ~EXIS~3NC STEEL SHEET PILING (Z27) EL. 58t.5~ TYPICAL PROPOSED SECTION D-D STA~ON 109+60 (MATCH TOP DP R. ODBWAM.) ~ I GEOTEX'RLE FILLER FABRIC GRANULAR RLL--~ 1_ _~_=~EL ~ EXIS'~NGBRANULARCONCRETEFiLL FLOOOWALL TOP O~ R~PR~ ~ m ~ ~ REMAIN IN P~CE TYPICAL PROPOSED SECTION C-C STA'RON 110+90 MISSISSIPPI RIVERWALK PHASE II CITY OF DUBUQUE T~ICAL SEC'RON C-C AND TYPICAL SEC330N )-D Of CHEEK WALLS D .e~ 607.41 607.36 NEXT SHEET LANDING PLAN eXP. JOINT INTEGRALLY COLORED CONC. COLOR "A" (~YP.) SEe EXP. JOINT 518.91 DIM. 0 INSIDe FACE OF CURS 0 41 RADIUSI EL. 607.41 /-- EXP. JOINT JOINT [ '~. el 598.36 ~ STAIRWAY ~2 REINFORCEMENT BARS 4002 POUND 148 LIN. FT. .~F_j.L~ OeTAIL A ~ tOOLED CONTROL JOINT ('PIP.) DIM. ~' INSIDE FACE OF CURS ~1 41' RADIUS 4-~5J MISSISSIPPI RIVERWALK PHASE II CITY OF DUBUQUE STAIRWAY PLAN. SEC~ONS, AND DETNLS CONVENTION/ CONFERENCE CENTER ~_.C OHVENTION/CONFERENCE -~ CENTER FLAZA CDY OTHERS) CONVENTION/CONFERENCE CENTER ~AVEMENT (N.I.O. - BY OTHER5) ~-,,__ C ONVENTION/O ONFERENCE CENTER PLAZA CBT OTHERS) !.5' NTEGRALLY COLORED CONCRETE WALK /'-WITH THICKENED EDGE CTTP.) SEE DETAIL / ;I 5INGLE LUNINAIRE PEDESTRIAN LIGHT CTTP.) SEE DETAIL MISSISSIPPI RIVER INTEGRALLY COLORED CONCRETE STAIRWAY ~G -COLOR 'C' SEE DETAIL ORNAHENTAL GUARDRA~L · CN.LC. - DY OTHERS) NORHAL WATER LEVEL__ BENCH CTYP.) SEE DETAIL LITTER RECEPTACLE CTTP.) SEE DETAIL 51NGLE LUMINAIRE PEDESTRIAN LIGHT CTYP.; SEE DETAIL 0 5 10 20 MISSISSIPPI RIVERWALK CiTY OF DUBUQUE HARDSCAPE pLAN PHASE II NO. , I STAR BREWERY · ... ~.,.~ ~,,,,,,~. ~.,¢c.,.,o. MISSISSIPPI RIVERWALK PHASE II~'~' ''°' .~s~s oES~l,~O. T~.~ ..... ,~,~ ~,~ ~, m^T I ~ ^ ou~¥ CITY OF DUBUQUE LS-11 ~ LANDSCAPING PLAN NWL 595.0~: (VARIES) · RI~ER BOTrOU DREDGE TO E1 586.0 PIER - EL VARIES APPROX. 598.50 TO 601,50 SEE DETNL SHSET PILE EXISTiNG GRADE REMO~ BY MECHANICAL DREDGING SEE GRADING PLAN (NO HYDRAULIC DREDGING ALLO~.D) BOTFOM OF TYPICAL PROPOSED SECTION L-L AT PIER APPROX. WATER'S EDGE NO'IE: SEE GRADING PLAN FOR CROSS SECTION LOCATIONS 5+00 TYPICAL PROPOSED SECTION STA"~ON 96+30 MISSISSIPPI RIVERWALK PHASE II CITY OF DUBUQUE TYPICAL S[C'~IDR K--K AND TYPICAL SEC910N L-L