Improvement Contract/Bond_Midwest Concrete, 2016 Asphalt Overlay Ramp Two SECTION 00500
Page 1 of 6
I
PUBLIC IMPROVEMENT CONTRACT
SECTION 00500
2016 ASPHALT OVERLAY ACCESS RAMP PROJECT TWO
THIS IMPROVEMENT CONTRACT (the Contract), made in triplicate, dated for references
purposes the 23rd day of August, 2016 between the City of Dubuque, Iowa, by its City Manager,
through authority conferred upon the City Manager by its City Council- (City), and Midwest
Concrete, Inc. (Contractor).
For and in consideration of the mutual covenants herein contained, the parties hereto
agree as follows:
CONTRACTOR AGREES:
1. To furnish all material and equipment and to perform all labor necessary for the 2016
Asphalt Overlay Access Ramp Project Two (Project).
2. CONTRACT DOCUMENTS
A. The Contract Documents consist of the following:
8. Project Title Page (Section 00100),
9. Project Directory Page (Section 00101).
10.This Public Improvement Contract (Section00500).
11.Performance, Payment, and Maintenance Bond (Section 00600).
12.Out-of-State Contractor Bond (Section.00610).
13.Other Bonds:
a. (Bond Name) (pages—to — , inclusive).
b. (Bond Name) (pages —to , inclusive). �I
c. (Bond Name) (pages _to^ , inclusive).
14.The Iowa Statewide Urban Design and Specifications (SUDAS) 2015 Edition.
15.CITY OF DUBUQUE Supplemental Specifications 2015 Edition.
16.Other Standard and Supplementary Specifications as listed on the Title Page of the
Contract Document Manual:
17.Special Provisions included in the project Contract Document Manual.
18.Drawings –Sheet No. through No. (00 pages) or drawings consisting of
sheets bearing the following general title:
Special Provisions (attached) and intersection aerial photos(attached)
19.Addenda (numbers_to— , inclusive),
20.Insurance Provisions and Requirements (Section 00700).
21.Sales Tax Exemption Certificate (Section 00750).
22.Site Condition Information (Section 00775).
23.Construction Schedule and Agreed Cost of Delay (Section 00800).
e
ti
SECTION 00500
i
Page 2 of 6
24.Erosion Control Certificate (Section 00900).
25.Consent Decree (Section 01000).
26.Other Project Information and Permits (Section 01100).
27.Exhibits to this Contract (enumerated as follows):
a. Contractor's Bid (pages _to T, inclusive).
b. Bidder Status Form (Section 00460).
c. Contractor Background Information Form (Section 00471)
d. The following documentation that must be submitted by Contractor prior to Notice
of Award.
i. NA
ii. NA l
iii. NA
e. None.
28.The following which may be delivered or issued on or after the Effective Date of the
Agreement:
a. Notice to Proceed (Section 00850).
b. Project Certification Page (Section 00102).,
c. Change Orders (Not attached to this agreement). ?
There are no other Contract Documents. The Contract Documents may only be amended,
modified, or supplemented as provided in General Conditions.
3. All materials used by the Contractor in the Project must be of the quality required by the j
Contract Documents and must be installed in accordance with the Contract Documents. h
4. The Contractor must remove any materials rejected by the City as defective or improper, or
any of said work condemned as unsuitable or defective, and the same must be replaced or I�
redone to the satisfaction of the City at the sole cost and expense of the Contractor.
5. Five percent (5%) of the Contract price will be retained by the City for a period of thirty (30)
days after final completion and acceptance of the Project by the City Council to pay any
claim by any party that may be filed for labor and materials done and furnished in
connection with the performance of this Contract and for a longer period if such claims are l
not adjusted within that thirty (30) day period, as provided in Iowa Code Chapter 573 or
Iowa Code Chapter 26. The City will also retain additional sums to protect itself against any
claim that has been filed against it for damages to persons or property arising through the
prosecution of the work and such sums will be held by the City until such claims have been
settled, adjudicated or otherwise disposed of.
6. The Contractor has read and understands the Contract Documents herein referred to and I
agrees not to plead misunderstanding or deception related to estimates of quantity,
character, location or other conditions for the Project.
7. In addition to any warranty provided for in the specifications, the Contractor must also fix
any other defect in any part of the Project, even if the Project has been accepted and fully
1
SECTION 00500 I
Page 3 of 6
paid for by the City. The Contractor's maintenance bond will be security for a period of two
years after the issuance of the Certificate of Substantial Completion,
8. The Contractor must fully complete the Project under this Contract on or before the date
indicated in the Construction Schedule and Agreed Cost of Delay Section of the Contract
Documents. j
9. INDEMNIFICATION FROM THIRD PARTY CLAIMS. To the fullest extent permitted by law,
Contractor shall defend, indemnify and hold harmless City, its officers and employees, from
and against all claims, damages, losses and expenses claimed by third parties, but not
including any claims, damages, losses or expenses of the parties to this Contract, including
but not limited to attorneys' fees, arising out of or resulting from performance of this
Contract, provided that such claim, damages, loss or expense is attributable to bodily
injury, sickness, disease or death, or injury to or destruction of property, including loss of
use resulting there from, but only to the extent caused in whole or in part by negligent acts
or omissions of Contractor, or anyone directly or indirectly employed by Contractor or
u
anyone for whose acts Contractor may be liable, regardless of whether or not such claim,
damage, loss or expense is caused in part by a party indemnified hereunder.
10. The Contractor hereby represents and guarantees that it has not, nor has any other person
for or in its behalf, directly or indirectly, entered into any arrangement or Contract with any
other Bidder, or with any public officer, whereby it has paid or is to pay any other Bidder or
public officer any sum of money or anything of value whatever in order to obtain this
Contract; and it has not, nor has another person for or in its behalf directly or indirectly,
entered into any Contractor arrangement with any other person, firm, corporation or a
association which tends to or does lessen or destroy free competition in the award of this
Contract and agrees that in case it hereafter be established that such representations or �l
guarantees, or any of them are false, it will forfeit and pay not less than ten percent (10%)
of the Contract price but in no event less than $2,000.00 (Two Thousand Dollars) to the
City.
11. The surety on the Bond furnished for this Contract must, in addition to all other provisions,
be obligated to the extent provided for by Iowa Code 573.6 relating to this Contract, which
provisions apply to said Bond.
1
12. The Contractor agrees, and its Bond is surety therefore, that after the Certificate of
Substantial Completion has been issued by the City, it will keep and maintain the Project in
good repair for a period of two (2) years.
13. The Project must be constructed in strict accordance with the requirements of the laws of
the State of Iowa, and the United States, and ordinances of the City of Dubuque, and in
accordance with the Contract Documents. .
A. All applicable standards, orders, or regulations issued pursuant to the Clean Air Act of
1970 (42 U. S. C. 1958 (H) et. seq.) and the Federal Water Pollution Act (33 U. S. C.
1368 et. seq.) as amended, Executive Order 11738, and Environmental Protection
Agency regulations (40 CFR, Part 15). Contractor must comply with Section 103 and
107 of the Contract Work Hours and Safety Standards Act (40 USC 327-330) and
Department of Labor Regulations (29 CFR, Part 5).
SECTION 00500
Page 4 of 6
B. The City and the Contractor agree to comply with all provisions of the Davis-Bacon
Federal Prevailing Wage Act, if applicable, and related labor,requirements and
regulations and the Federal Wage.Determination for this Project.
C. Equipment or products authorized to be purchased with federal funding awarded for
this Contract must be American-made to the maximum extent feasible, in accordance
with Public Law 103-121, Sections 606(a) and (b).
I�
CONSENT DECREE
RELATING TO THE PROJECT
14. u THIS CONTRACTOR IS PERFORMING WORK FOR THE CITY OF DUBUQUE RELATED
TO THE WATER & RESOURCE RECOVERY CENTER OR THE SANITARY SEWER
COLLECTION SYSTEM. THEREFORE,THE CONSENT DECREE AND THIS SECTION ARE
APPLICABLE. f
CITY CONTRACTOR
THIS CONTRACTOR IS NOT PERFORMING WORD FOR THE CITY OF DUBUQUE
RELATED TO THE WATER & RESOURCE RECOVERY CENTER OR THE SANITARY
SEWER COLLECTION SYSTEM. THEREFORE THE CONSENT DECREE AND THIS li
SECTION ARE NOT APPLICABLE.
The City has entered into a Consent Decree in the case of The United States of America, and the
State of Iowa v. The City of Dubuque, Iowa, Civil Action Number Case 2:11-cv-01011-EMJ, Civil
Action Number 2000V00041, DOJ Case Number 90-5-1-1-09339, United States District Court for the
Northern District of Iowa. The provisions of the Consent Decree apply to and are binding upon the City
and its officers, directors, employees, agents, servants, successors, assigns, and all persons, firms
and corporations under contract with the City to perform the obligations of the Consent Decree.
The City is required to provide a copy of the Consent Decree to any contractor or consultant retained j
to perform work required by the Consent Decree.
A copy of the Consent Decree is included in the Contract Documents and can be viewed at j
htt :11 ;cit o ubu ue;or ll oc€ame tC nterll-tome/View/ 17 . A hard copy is available upon
request at the City's Engineering'Department Office.
I
The City must condition any contract to perform work required under the Consent Decree upon
performance of the work in conformity with the provisions of the Consent Decree.
The Consent Decree also provides that until five (5) years after the termination of the Consent Decree,
the City must retain, and must instruct its contractors and agents to preserve, all non-identical copies
of all documents, reports, data, records, or other information (including documents, records, or other
information in electronic form) in its or its contractors' or agents' possession or control, or that come
into its or its contractors' or agents' possession or control, and that relate in any manner to the City's
performance of its obligations under this Consent Decree, including any underlying research and
analytical data. This information-retention period, upon request by the United States or the State, the
City must provide copies of any documents, reports, analytical data, or other information required to
be maintained under the Consent Decree. At the conclusion of the information-retention period, the
City must notify the United States and the State at least ninety (90) Days prior to the destruction of any
SECTION 00500
Page 5 of 6 j
documents, records, or other information subject to such requirements and, upon request by the
United States or the State, the City must deliver any such documents, records, or other information to
the EPA or IDNR.
CERTIFICATION BY CONTRACTOR
The undersigned, on behalf of the Contractor, with full authority to act on behalf of the Contractor,
certifies to the City of Dubuque as follows:
1. I have received a copy of the Consent Decree in the case of The United States of
America, and the State of Iowa v. The City of Dubuque, Iowa, Civil Action Number
Case 2:11-cv-01011-EMJ, Civil Action Number 2008V00041, DOJ Case Number 90-
5-1-1-09339, United States District Court for the Northern District of Iowa.
2. All work performed will be in conformity with the provisions of the Consent Decree. I�
3. All documents reports, data, records, or other information (including documents,
records, or other information in electronic form) that relate in any manner to the
performance of obligations under the Consent Decree, including any underlying
research and analytical data, will be retained as required by the Consent Decree.
4. The Contractor agrees to defend, indemnify, and hold harmless the City, its officers,
agents, or employees from and against any claims, including penalties, costs and
fees as provided in the Consent Decree, relating to or arising out of the Contractor's
failure to comply with the Consent Decree.
CONTRACTOR:
Contractor J
By:
Si ature
La V1
I
Printed Name
Title
Date
I�
i
SECTION 00500
Page 6 of 6
THE CITY AGREES:
15. Upon the completion of the Contract, and the acceptance of the Project by the City Council,
and subject to the requirements of law, the City agrees to pay the Contractor as full
compensation for the complete performance of this Contract, the amount determined for
the total work completed at the price(s) stated in the Contractor's Bid Proposal and less
any Agreed Cost of Delay provided for in the Contract Documents.
fl
CONTRACT AMOUNT $ 78,696.00
I
i
CITY OF DUBUQUE, IOWA:
City Manager's Office
Department I
By;
Signature
Michael C. Van Milligen
Printed Name
City. Manager
Title
Date
I
CONTRACTOR: ;
contractor
By: VA14n
Signature
0 t4a S i
Pri ted Name
Title
q->- a
Date
i
i
r
___= END OF SECTION 00500 =___
c
SECTION 00600 II
Page 1 of 5
PERFORMANCE, PAYMENT AND MAINTENANCE BOND
SECTION 00600
KNOW ALL BY THESE PRESENTS:
That we, Midwest Concrete, Inc., as Principal (hereinafter the "Contractor" or "Principal")
and West. Bend Mutual Insurance Company as Surety
are held and firmly bound unto the City of Dubuque, Iowa, as Obligee (hereinafter referred to as
"Owner"), and to all persons who may be injured by any breach of any of the conditions of this
Bond in the penal sum of Seventy-eight thousand, six hundred ninety--six dollars. ($ 78,696.00),
lawful money of the United States, for the payment of which sum, well and truly to be made, we i!
bind ourselves, our heirs, legal representatives and assigns, jointly or severally, firmly by these
presents.
The conditions of the above obligations are such that whereas said Contractor entered into a
contract with the Owner, bearing date the 23rd day of August, 2016, (hereinafter the "Contract")
wherein said Contractor undertakes and agrees to construct the following project in accordance with
the Contract Documents, and to faithfully perform all the terms and requirements of said Contract
within the time therein specified, in a good and workmanlike manner, and in accordance with the
Contract Documents. The Contract Documents for
2016 Asphalt Overlay Access Ramps Project Two Project detail the following described
improvements:
Curb Ramp Program CIP #3001227
Removal, realignment, and reconstruction of corner access ramps associated with the
2016 Asphalt Overlay Access Ramps Project Two.
• Southway and Dana Dr. Southeast corner remove current ramps and construct new
ramp perpendicular to Dana Dr.
• Southway and Dana Dr. remove corner ramp and reconstruct perpendicular to Dana a
Dr.
• Southway and Key Way Dr. Northwest & Northeast corner, construct ramp
perpendicular to Southway
• Delmonaco Dr. and Key Way Dr. Northwest corner, construct ramp perpendicular to
Delmonaco Dr.
• Delmonaco Dr. and Keyway Dr. Northeast corner, construct ramp perpendicular to
Delmonaco Dr.
• Delmonaco Dr. and Venture Ct. Southeast corner, construct ramp perpendicular to
Venture Ct.
• Dana Dr. and Delmonaco Dr. Southwest corner, construct dual ramp perpendicular
to both streets.
• Dana Dr. and Delmonaco Dr. Southeast corner, construct ramp perpendicular to
Delmonaco Dr.
• Dana Drive and Delmonaco Drive, construct ramp perpendicular to Dana Drive
across from dual ramp.
LI
i'
i
I
SECTION 00600
Page 2 of 5
• Illinois Avenue and Pennsylvania Avenue Southeast and Southwest Corners,
reconstruct ramps perpendicular to Illinois Avenue
• Enid Street and Pennsylvania Avenue Southeast and Southwest Corners
reconstruct ramps perpendicular to Enid Street
• Enid Street and Illinois Avenue, NE corner reconstruct perpendicular to Enid Street.
• Alpha Street and Pennsylvania Avenue, Southwest and Southeast corners,
reconstruct ramps perpendicular to Alpha Street.
• Ohio Street and Pennsylvania Avenue, Southwest and Southeast corners, construct
new ramps perpendicular to Ohio Street.
• Ohio Street and Illinois Avenue, Northeast and Northwest corners, construct new
ramps perpendicular to Ohio Street.
• Illinois Street and Drexel Avenue Northwest Corner reconstruct ramp perpendicular
to Illinois Avenue.
• Drexel Avenue and Pennsylvania Avenue Southwest and Southeast corners, 4
reconstruct ramps perpendicular to Drexel Avenue.
It is expressly understood and agreed by the Contractor and Surety in this Bond that the following
provisions are a part of this Bond and are binding upon said Contractor and Surety, to-wit:
1. PERFORMANCE: The Contractor shall well and faithfully observe, perform, fulfill, and
abide by each and every covenant, condition, and part of said Contract and Contract I
Documents, by reference made a part hereof, for the project, and shall indemnify and save I
harmless the Owner from all outlay and expense incurred by the Owner by reason of the
Contractor's default of failure to perform as required. The Contractor shall also be
responsible for the default or failure to perform as required under the Contract and Contract
Documents by all its subcontractors, suppliers, agents, or employees furnishing materials
or providing labor in the performance of the Contract.
i
2. PAYMENT: The Contractor and the Surety on this Bond hereby agreed to pay all just a
claims submitted by persons, firms, subcontractors, and corporations furnishing materials g�g
for or performing labor in the performance of the Contract on account of which this Bond is N
given, including but not limited to claims for all amounts due for labor, materials, lubricants,
oil, gasoline, repairs on machinery, equipment, and tools, consumed or used by the
Contractor or any subcontractor, wherein the same are not satisfied out of the portion of the
contract price the Owner is required to retain until completion of the improvement, but the
Contractor and Surety shall not be liable to said persons, firms, or corporations unless the
claims of said claimants against said portion of the contract price shall have been
established as provided by law. The Contractor and Surety hereby bind themselves to the
obligations and conditions set forth in Chapter 573 of the Iowa Code, which by this
reference is made a part hereof as though fully set out herein.
3. MAINTENANCE: The Contractor and the Surety on this Bond hereby agree, at their own
expense:
A. To remedy any and all defects that may develop in or result from work to be
performed under the Contract Documents within the period of two (2) year(s) from the
p
i
i
�I
,;
;,
i
i
SECTION 00600 i
Page 3 of 5 II
date of acceptance of the work under the Contract, by reason of defects in
workmanship, equipment installed, or materials used in construction of said work;
i
B. To keep all work in continuous good repair; and u
C. To pay the Owner's reasonable costs of monitoring and inspection to assure that any
defects are remedied, and to repay the Owner all outlay and expense incurred as a
result of Contractor's and Surety's failure to remedy any defect as required by this
section.
I
Contractor's and Surety's Contract herein made extends to defects in workmanship or
materials not discovered or known to the Owner at the time such work was accepted.
�l
4. GENERAL: Every Surety on this Bond shall be deemed and held bound, any contract to the
contrary notwithstanding, to the following provisions:
'i
ij
A. To consent without notice to any extension of time authorized in approved change
orders to the Contractor in which to perform the Contract;
B. To consent without notice to any change in the Contract or Contract Documents,
authorized in approved change orders which thereby increases the total contract price
and the penal sum of this Bond, provided that all such changes do not, in the
aggregate, involve an increase of more than twenty percent (20%) of the total contract
price, and that this Bond shall then be released as to such excess increase;
C. To consent without notice that this Bond shall remain in full force and effect until the
Contract is completed, whether completed within the specified contract period, within 1
an extension thereof, or within a period of time after the contract period has elapsed
and the liquidated damage penalty is being charged against the Contractor.
The Contractor and every Surety on the Bond shall be deemed and held bound, any contract to the
contrary notwithstanding,to the following provisions: y
D. That no provision of this Bond or of any other contract shall be valid that limits to less
than five (5) years after the acceptance of the work under the Contract the right to sue
on this Bond.
E. That as used herein, the phrase "all outlay and expense" is not to be limited in any
way, but shall include the actual and reasonable costs and expenses incurred by the
Owner including interest, benefits, and overhead where applicable. Accordingly, "all
outlay and expense" would include but not be limited to all contract or employee
expense, all equipment usage or rental, materials, testing, outside experts, attorney's
fees (including overhead expenses of the Owner's staff attorneys), and all costs and
g�
9
i
i
If
i�
ii
I
i
1
ii
l
I
C
I
I
SECTION 00600
Page 4 of 5
1
expenses of litigation as they are incurred by the Owner. It is intended the Contractor
and Surety will defend and indemnify the Owner on all claims made against the
Owner on account of Contractor's failure to perform as required in the Contract and
Contract Documents, that all agreements and promises set forth in the Contract and
Contract Documents, in approved change orders, and in this Bond will be fulfilled, and
that the Owner will be fully indemnified so that it will be put into the position it would
have been in had the Contract been performed in the first instance as required.
In the event the Owner incurs any "outlay and expense" in defending itself against any claim as to
which the Contractor or Surety should have provided the defense, or in the enforcement of the
promises given by the Contractor in the Contract, Contract Documents, or approved change
orders, or in the enforcement of the promises given by the Contractor and Surety in this Bond, the
Contractor and Surety agree that they will make the Owner whole for all such outlay and expense,
provided that the Surety's obligation.under this Bond shall not exceed one hundred twenty-five
percent (125%) of the penal sum of this Bond.
ii
In the event that any actions or proceedings are initiated regarding this Bond, the parties agree that
the venue thereof shall be Dubuque County, State of Iowa. If legal action is required by the Owner i
to enforce the provisions of this Bond or to collect the monetary obligation incurring to the benefit of
the Owner, the Contractor and the Surety agree, jointly, and severally, to pay the Owner all outlay I!
and expense incurred therefore by the Owner. All rights, powers, and remedies of the Owner
hereunder shall be cumulative and not alternative and shall be in addition to all rights, powers, and
remedies given to the Owner, by law. The Owner may proceed against surety for any amount
guaranteed hereunder whether action is brought against the Contractor or whether Contractor is
joined in any such action(s) or not.
NOW THEREFORE, the condition of this obligation is such that if said Principal shall faithfully
perform all the promises of the Principal, as set forth and provided in the Contract, in the Contract
Documents, and in this Bond, then this obligation shall be null and void, otherwise it shall remain in
full force and effect.
When a work, term, or phrase is used in this Bond, it shall be interpreted or construed first as
defined in this Bond, the Contract, or the Contract Documents; second, if not defined in the Bond,
Contract, or Contract Documents, it shall be interpreted or construed as defined in applicable
provisions of the Iowa Code; third, if not defined in the Iowa Code, it shall be interpreted or
construed according to its generally accepted meaning in the construction industry; and fourth, if it
has no generally accepted meaning in the construction industry, it shall be interpreted or construed
according to its common or customary usage.
Failure to specify or particularize shall not exclude terms or provisions not mentioned and shall not
limit liability hereunder. The Contract and Contract Documents are hereby made a part of this
Bond.
I
u
I
SECTION 00600
Page 5 of 5
it
Project No. 3001227
Witness our hands, in triplicate, this 23rd day of August 2016.
SURETY COUNTERSIGNED BY:
FORM APPRO Y:
i
Signature of Agent _
Representativ or Owner
Printed Name of Agent SURETY:
Company Address
West Bend Mutual Insurance Company d
�
Surety Company
City,State,Zip Code By. _
Signature Attorney-in-Fact Officer
Kim Hess
Company Telephone Number
Printed Name of Attorney-in-Fact Officer
PRINCIPAL: TRICOR, Inc.
Midwest Concrete, Inc. Company Name
Contractor 500 Iowa Street
Company Address
By.
Signature Dubuque, IA 52001
Ryan Coates City,State,Zip Code
Printed Name 553-555-5441
Owner Company Telephone Number
Title
NOTE:
1. All signatures on this performance, payment, and maintenance Bond must be original
II
signatures in ink; copies, facsimile, or electronic signatures will not be accepted.
2. This Bond must be sealed with the Surety's raised, embossing seal.
3. The name and signature of the Surety's Attorney-in-Fact/Officer entered on this Bond
d
must be exactly as listed on the Certificate or Power of Attorney accompanying this
Bond.
END OF SECTION 00600
d
�I
y
1
'I�
1
I
I
i
I
I
! BEND 2329595
N MUTUAL INSURANCE COMPFt(dV
Power of Attorney
Know all men by these Presents,That West Bend Mutual Insurance Company, a corporation having its principal office in
the City of West Bend,Wisconsin does make, constitute and appoint;
KIM HESS
lawful Attorney(s)-in-fact,to make, execute, seal and deliver for and on its behalf as surety and as its act and deed any Ili
and all bonds, undertakings and contracts of suretyship, provided that no bond or undertaking or contract of suretyship
executed_under_this authority-shall exceed in amount the sum Of.' --Seven Million Ffve_Hundred Thousand_Dollars_(_$7,500,000_)
This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following
Resolution adopted by the Board of Directors of West Bend Mutual Insurance Company at a meeting duly called and held l
on the 21st day of December, 1999.
Appointment of Attomey-In-Fact. The president or any vice president, or any other officer of West Bend Mutual Insurance
Company may appoint by written certificate Attorneys-in-Fact to act on behalf of the company in the execution of and
attesting of bonds and undertakings and other written obligatory instruments of like nature. The signature of any officer
authorized hereby and the corporate seal maybe affixed by facsimile to any such power of attorney or to any certificate
relating therefore and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall
be valid and binding upon the company, and any such power so executed and certified by facsimile signatures and
facsimile seal shall be valid and binding upon the company in the future with respect to any bond or undertaking or other
writing obligatory in nature to which it is attached. Any such appointment may be revoked, for cause, or without cause,
by any said officer at any time:
In witness whereof,the West Bend Mutual Insurance Company has caused these presents to be signed by its president {�
undersigned and its corporate al to be hereto duly attested by its secretary thjs 1st day ofMarch, 2009.
�� i irisU r
Attest
Ja e J. Pal, Kevin A. Steiner
-5!
SA SLL ;% Chief Executive Officer! President
State of Wisconsin ! ??....
County of Washington
On the 1 st day of March, 2009 betore me personally carne Kevin A. Steiner, to me known being by duly sworn, did
depose and say that he resides in the County of Washington, State of Wisconsin;that he is the President of West Bend
Mutual Insurance Company, the corporation described in and which executed the above instrument;that he knows the
seal of the said corporation;that the seal affixed to said instrument is such corporate seal;that is was so affixed by order
of the board of directors of said corporation and that he signed his name thereto by like order. 1
* NOTARY * Johwell
PUBLIC iz
` Executive Vice President-Chief Legal Officer
ro` Notary Public,Washington Co.Wi
OF Vvts�• My Commission is Permanent
The undersigned;duly elected to the office stated below, now the incumbent in West Bend Mutual Insurance Company, a
Wisconsin corporation authorized to make this certificate, Do Hereby Certify.that the foregoing attached Power of
Attorney remains in full force effect and has not been revoked and that the Resolution of the Board of Directors, set forth
in the Power of Attorney is now in force.
Signed and sealed at West Bend, Wisconsin this 23 day of August 2016
q�0 PORgrF': _.
Dale J. Kent
' Executive Vice President-
z,..•i �.;;Y
?N- Chief Financial Officer
NOTICE:Any questions concerning this Power of Attorney may be directed to the Bond Manager at NSI,a division of West Bend Mu'ual Insurance Company
8401 Greenway 131vd. Suite 1'100 1 11.0. U, 620976 1 kliddlcron,%VI 53552 ph (608) 410-3410 1 www,thc,,ilveriining.com
l
I
I
i�I
iS
0
I�
i