Dubuque Regional Airport Utilities Extension Project Acceptance Copyright 2014 City of Dubuque Consent Items # 9. ITEM TITLE: Dubuque Regional Airport Utilities Extension Project Acceptance SUMMARY: City Manager recommending acceptance of the construction contract for the Utility Extension to the Dubuque Regional Airport, as completed by Miller Trucking and Excavating and authorizing final payment. RESOLUTION Accepting the Utility Extension to the Dubuque Regional Airport Project and authorizing the payment of the contract amount to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Utility EAension to the Dubuque Regional Airport-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions THE CM OF Dubuque AAA-A m c DUB E 11 1r Masterpiece on the Mississippi -2012I rP PP �oo� .zo13 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Utility Extension to the Dubuque Regional Airport CI P 7102409 — Granger Creek Sanitary Sewer Extension CI P 7402395 —Water Extension - Airport CIP 3002491 — Fiber Optic Conduit— Misc. DATE: October 11, 2016 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Utility Extension to the Dubuque Regional Airport, as completed by Miller Trucking and Excavating, in the final contract amount of$9,810,500.97, which was 8.8% over the awarded amount of $9,016,066.55. There are several individual items that were either over the engineer estimate or under. Two examples of overruns are in the rock excavation quantity and the replacement of unsuitable backfill items and an example of a savings is in the quantity for pavement or overlay. The final rock excavation amount was $686,000 more than the engineer's estimate for rock excavation. Several areas, on the project, encountered rock ledges that were not identified or anticipated during the design process. The excavated rock was unsuitable for use as backfill material, which required more granular backfill material to be used. The final amount for replacement of unsuitable backfill is $312,000 more than the engineer's estimate. A significant savings was realized by not needing to overlay Elmwood Drive. The engineer's estimate included $116,800 for an overlay and repairs to Elmwood Drive. The roadway performed better than anticipated and required very little repair work due to this project. The savings on this item was $89,000. An item that proportionally added to all of the Cl P budgets, was the WHKS contract amendment for full time onsite inspection and additional engineering to evaluate and facilitate modifications to the project. City engineering staff were utilized to provide a portion of the project inspection but due prior project commitments, engineering staff was not available to provide the level of inspection required for a project of this size and duration. This resulted in an additional engineering expense of$162,517.49 above what was shown in the project award memo. I concur with the recommendation and respectfully request Mayor and City Council approval. �1 t 64�- Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer 2 THE CITY DUB DUUB__&__ FE IVicI R► Masterpiece on the Mississippi 2007.2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Cit,Psiho osEn Y Y Engineer � - SUBJECT: Utility Extension to the Dubuque Regional Airport CIP 7102409 - Granger Creek Sanitary Sewer Extension CIP 7402395 - Water Extension - Airport CIP 3002491 - Fiber Optic Conduit— Misc DATE: October 17, 2016 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Utility Extension to the Dubuque Regional Airport. DISCUSSION In November of 2012, the City contracted with WHKS and Co. for the design services related to the Utility Extension to the Dubuque Regional Airport. Over the next 2 '/2 years, City staff worked closely with WHKS and HDR (sub-consultant) to design and redesign the extensions of the sanitary sewer, water main, and fiber optics to not only serve the Dubuque Regional Airport, but to also support future growth of the City. The foundational infrastructure constructed under this project is the backbone for utility extension projects within the 5,700 acre Granger Creek sewershed. Along with supporting future growth in the area, the water main infrastructure design incorporated a 500,000 Gallon reservoir to not only provide for fire protection at the airport, but also to provide a level of redundancy for the service area. The construction contract was bid and awarded in May of 2015 and consisted; 15,350 LF of sanitary sewer, 19,965 LF of water main, two booster stations, 500,000 Gallon water reservoir, and 28,684 LF of fiber optics. Miller Trucking and Excavating of Silvis, IL was awarded the contract and construction began in July 2015. Multiple construction crews, from Miller Trucking and Excavating and their sub-contractors, worked throughout the year and were able to make the sanitary sewer connection at the airport by the end of March of 2016, and have the water system completed by the end of May 2016. The final Fiber optics connections were completed In June 2016. The award memo listed the Miller Trucking and Excavating's bid amount of $9,401,738.50 as the contract award amount. Within the award memo, there was a cost savings recommendation to eliminate two highway utility crossings to Tamarac Business Park. The accepted savings of $385,671.95 resulted in an actual awarded contract, with Miller Trucking and Excavating, in the amount of $9,016,066.55. The revised award amount, due to the elimination of the utility crossings, is summarized below: Estimate Award Construction Contract $8,509,284.50 $9,016,066.55 Contingency 851,440.45 851,440.45 Construction Engineering & Inspection 741,609.79 741,609.79 Easement Acquisition 91,248.95 Total Project Cost10.102.334.74 10.700.365.74 The award memo also indicated a funding shortfall for the three identified project CIP budgets and made recommendations to transfer available funding from other CIP budgets, to cover the shortfall. The recommendation included re-budgeting for the effected CIP budgets the following year. The result of the transfer in funding, to the project budget, is summarized below: Initial CIP Transferred Total Funding Funding Funding CIP 7102409 Granger Creek Sanitary Sewer Extension $4,029,864.00 $ 43,000.00 $4,072,864.00 CIP 7402395 Water Extension Airport $5,574,336.00 $390,000.00 $5,964,336.00 CIP 3002491 Fiber Optics to Airport $ 340,000.00 $386,985.28 $ 726,985.28 Total CIP Funding $9,944,200.00 $819,985.28 $10,764,185.28 The budget transfers resulted in excess funding in the amount of$63,819.54. This amount was held as part of the project contingency. The adjusted project budget is summarized below. Award Pr- omec Budge Construction Contract $9,016,066.55 $9,016,066.55 Contingency 851 ,440.45 915,259.99 Construction Engineering & Inspection 741,609.79 741,609.79 Easement Acquisition 91,248.95 91,248.95 Total Project Cost $10.700.365.74 $JD 7Q44,185.28 2 Miller Trucking and Excavating completed the contract at a cost of$9,810,500.97, or 8.8% over the awarded amount of $9,016,066.55. There are several individual items that were either over the engineer estimate or under. The quantity variations in the individual items effected the individual CIP budgets differently depending on what CIP the overrun or savings applied to. Two examples of overruns are in the rock excavation quantity and the replacement of unsuitable backfill items and an example of a savings is in the quantity for pavement or overlay. The final rock excavation amount was $686,000 more than the engineer's estimate for rock excavation. Several areas, on the project, encountered rock ledges that were not identified or anticipated during the design process. The excavated rock was unsuitable for use as backfill material, which required more granular backfill material to be used. The final amount for replacement of unsuitable backfill is $312,000 more than the engineers estimate. A significant savings was realized by not needing to overlay Elmwood Drive. During the design process it was anticipated that Elmwood Drive may not hold up well to the construction traffic that it would be subjected to. The engineer's estimate included $116,800 for an overlay and repairs to Elmwood Drive. The roadway performed better than anticipated and required very little repair work due to this project. The savings on this item is $89,000. An item that proportionally added to all of the CIP budgets, was the WHKS contract amendment for full time onsite inspection and additional engineering to evaluate and facilitate modifications to the project. City engineering staff were utilized to provide a portion of the project inspection but due prior project commitments, engineering staff was not available to provide the level of inspection required for a project of this size and duration. This resulted in an additional engineering expense of$162,517.49 above what was shown in the project award memo. BUDGETIMPACT The summary of project cost for the Utility Extension to the Dubuque Regional Airport Project is summarized as follows: Award Final Construction Contract $9,016,066.55 $9,810,500.97 Contingency 915,259.99 0.00 Construction Engineering & Inspection 741,609.79 904,127.28 Easement Acquisition 91,248.95 91,248.95 Total Project Cost $10,764,185.28 $10.805.877.20 As identified above, the total project cost is over budget by $41,691.92. However, the three individual CIP budgets were effected differently by the quantity variations as discussed above. The CIP budgets and project costs are summarized below. 3 Total Project Remaining Funding Cost Funding CIP 7102409 Granger Creek Sanitary Sewer Extension $4,072,864.00 $3,936,307.47 $136,556.53 CIP 7402395 Water Extension Airport $5,964,336.00 $6,092,956.06 ($128,620.06) CIP 3002491 Fiber Optics to Airport $ 726,985.28 $ 776,613.67 ($ 49,628.39) Total CIP Funding $10,764,185.28 $10,805,877.20 ($ 41,691.92) During the FY 17 budget process the water department, in anticipation of a funding shortfall, allocated additional funding from 7401405 Water Main Replacements for this project in the amount of$128,620.06 which is not reflected in the awarded budget amount above. The shortfall in CIP 3002491 Fiber Optics to Airport of$49,628.36 will be funded through Fiber Optics Communications from Downtown to the Airport FY17 CIP 3002491 in the amount of$83,372.64. This CIP is being re-budgeted in FY18. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvements, and establishing the final contract amount of$9,810,500.97, and for the payment of the contract amount to Miller Trucking & Excavating for the Utility Extensions to the Dubuque Regional Airport Project. Prepared by: Todd Irwin cc: Jenny Larson, Budget Director Alexis Steger, Senior Budget Analyst Bob Green, Water Department Manager Denise Ihrig, Water Plant Manager Brant Schueller, Water Engineering Asst David Ness, Civil Engineer Todd Irwin, Engineering Technician 4 RESOLUTION NO. 353-16 ACCEPTING THE UTILITY EXTENSION TO THE DUBUQUE REGIONAL AIRPORT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Utility Extension to the Dubuque Regional Airport project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $9,810,500.97; WHEREAS, the Contractor has previously been paid $9,662,666.00, leaving a balance of $147,834.97; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Utility Extension to the Dubuque Regional Airport project fund for the contract amount of $147,834.97 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 17th day of October, 2016. .,400101, Firnstahl, CMC, (, Kevin Clerk oy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE UTILITY EXTENSION TO THE DUBUQUE REGIONAL AIRPORT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Utility Extension to the Dubuque Regional Airport Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $10,805,877.20. Dated this day of , 2016. Gus Psihoyos, City Engineer Filed in the office of the CityClerk on the da of X2016. Y 'K=vin S. Firnstahl, " MC, City Clerk