Heeb Street Retaining Wall Reconstruction Project Acceptance Copyright 2014 City of Dubuque Consent Items # 10. ITEM TITLE: Heeb Street Retaining Wall Reconstruction Project Acceptance SUMMARY: City Manager recommending acceptance of the public improvement construction contract for the Heeb Street Retaining Wall Reconstruction Project, as completed by McDermott Excavating and authorizing final payment. RESOLUTION Accepting the Heeb Street Retaining Wall Reconstruction Project and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Heeb Street Retaining Wall Reconstruction Project- City Manager Memo MVM Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF Dubuque DUB E i" Masterpiece on the Mississippi 2007.2012.2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Heeb Street Retaining Wall Reconstruction Project Cl P 3001029 — Heeb Street Wall CI P 3602481 — 18th Street Wall Recon. DATE: October 11, 2016 City Engineer Gus Psihoyos is recommending acceptance of the public improvement construction contract for the Heeb Street Retaining Wall Reconstruction Project, as completed by McDermott Excavating, in the final contract amount of$160,442.34, which is a 2.6% decrease from the original contract amount of$164,778.00. The decrease was due to actual field measurements. I concur with the recommendation and respectfully request Mayor and City Council approval. 4yL-A^1 Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DUB E �'� ��°`� 11111. Masterpiece oti the Mississippi 24107.2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: October 17, 2016 SUBJECT: Heeb Street Retaining Wall Reconstruction Project CIP 3001029 — Heeb Street Wall CIP 3602481 — 18th Street Wall Recon. INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the Heeb Street Retaining Wall Reconstruction Project. BACKGROUND The Heeb Street Retaining Wall is located at the intersection of Clarke Drive and Heeb Street. This is an existing City-owned limestone retaining wall that was showing signs of distress. The wall height varies from 6 feet to 15 feet, with a wall length of 82 feet. The wall supports Heeb Street (a 25-foot wide street) which has an 8-inch sanitary sewer main in close proximity to the wall. The City Engineering Department monitored the wall for movement between 2012 — 2013. For precaution the City placed temporary concrete barriers (summer of 2012) on Heeb Street to protect pedestrians and vehicles. DISCUSSION The Heeb Street Retaining Wall Reconstruction Project was completed by McDermott Excavating, of Dubuque, Iowa, in the final contract amount of $160,442.34 which is a 2.6 % decrease from the original contract amount of $164,778.00. The decrease was due to actual field measurements. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $160,442.34 to McDermott Excavating, for the Heeb Street Retaining Wall Reconstruction Project. BUDGET IMPACT The summary of project costs for the Heeb Street Retaining Wall Reconstruction Project, is as follows: Award Final Construction Contract $164,778.00 $160,442.34 Construction Engineering & Inspection (15%) 24 0_3. 66.35 24,066.35 Total Project Cost $188,844.35 $184,508.69 The funding for the Heeb Street Retaining Wall Reconstruction Project will be as follows: CIP No. Fund Description Fund Amount 3001029 Heeb Street Wall $84,508.69 3602481 18th Street Wall Recon. $100,000.00 Total Project Funding $184,508.69 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $160,442.34 to McDermott Excavating, for the Heeb Street Retaining Wall Reconstruction Project. cc: Jenny Larson, Budget Director John Klostermann, Public Works Director Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer Jon Dienst, Civil Engineer II Greg J. Doeden, Civil Engineer RESOLUTION NO. 354-16 ACCEPTING THE HEEB STREET RETAINING WALL RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Heeb Street Retaining Wall Reconstruction (the Project) has been completed by the Contractor, McDermott Excavating (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $160,442.34; WHEREAS, the Contractor has previously been paid $152,420.22, leaving a balance of $8,022.12; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $8,022.12 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 17th day of October, 2 Attest: Kevin S. Firnstahl, City Clerk Roy°D. BI, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE HEEB STREET RETAINING WALL RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Heeb Street Retaining Wall Reconstruction Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $184,508.69. Dated this I day of td04i , 2016. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the M day o, 2016. KeViri S. Firnstahl, rr- C, City Clerk