Southwest Arterial Brochure Copyright 2014 City of Dubuque Consent Items # 5. ITEM TITLE: Southwest Arterial Brochure SUMMARY: City Manager transmitting the City of Dubuque public information brochure for the Southwest Arterial / U.S. Highway 52. SUGGESTED DISPOSITION: Suggested Disposition: Receive and File ATTACHMENTS: Description Type Southwest Arterial Brochure Supporting Documentation SOUTHWEST Bu Q10WA00TARTERIAL Ma terpiem m the 7M-M—m HIghway 52 The # 1 Surface Transportation Priority in the Dubuque Area BACKGROUND PROJECT PARTNERS The Southwest Arterial(U.S. 52) has been the #1 transportation priority . Iowa Department of Transportation for the City of Dubuque, Dubuque County, Dubuque Metropolitan Area Transportation Study (DMATS), Greater Dubuque Development • Federal Highway Administration Corporation, and Dubuque Area Chamber of Commerce since 1987. • City of Dubuque The Southwest Arterial(U.S. 52) will be a 6.1 mile, four-lane, divided • Dubuque County Board of Supervisors freeway connecting U.S. 20 and U.S. 61/151. This project includes • Dubuque Metropolitan Area Transportation three interchanges: U.S. 20, North Cascade Road, and U.S. 61/151. Study(DMATS) These interchanges will be on-and off-ramps with no traffic signals or Greater Dubuque Development Corporation stop signs. • Dubuque Area Chamber of Commerce This highway will improve safety, reduce congestion on multiple Dubuque roadways, and positively impact Dubuque's economy. Al r� i - k — — 71 yi r s _ r BENEFITS OF PROJECT: . • Grading i U.S. 20 Interchange Congestion Relief / Improved Safety Doge ion Aeliet/ on the following roadways: ' mAWhiteSatety a2 AS 51/CenVal Ave./ 52 WhiteSt. • U.S. 52 / Central Ave. / White St. aseugr QUBUQ • U.S. 20 / Dodge St. szIcust SUBontery • Locust St. / Dodge St. Intersection °Cl nemeccton°SI Congestion Relief • Fremont Ave. AS2n/Ao^gest. 20 EMT Aueugu[ 0 • Rockdale Rd. 20 • North Grandview Ave. leepieved Wery - Nellylzne • Kelly Lane M 20 soF G+q,N st s2 DID YOU KNOW? to fee ReadCAies On average, 385 accidents occur on U.S. 20/Dodge St., U.S. 52 and Kelly Lane each year. Completion of the Southwest Arterial(U.S.52) will significantly improve the safety on these corridors by rerouting commercial freight traffic. Once vehicles are traveling on the Southwest Arterial(U.S.52), assuming a 30% reduction in accidents, this will result in approximately $30 million in savings from 2020 to 2030 and around $3 million annually from there on. ECONOMIC IMPACT Following the completion of the Southwest Arterial(U.S. 52) in2019,theEconomic Impact Analysis project has the potential to generate$80 million in property taxes,$1.67 2020_2030 billion in economic output,$653 million in labor income,and$1.02 billion Pr in value added from 2021-2030.The Southwest Arterial(U.S.52)will also annually generate$135 million in state and local taxes and $130 million Safety Impacts $29.8 million in federal tax from new economic development,as well as save$30 Employment Impacts $1.67 billion million for the 10-year period.This project will also generate$16 million _ New Housing Impacts $80 million in property tax,$304 million in economic output, $24 million in state and State/Local Tax Impacts $135 million local taxes,and$24 million in federal taxes due to economic development, in addition to$3 million in safety savings from 2030 onwards. Federal Tax Impacts $130 million 1 , North Cascade Road Bridge-Completed in November 2014 Rendering of Southwest Arterial(U.S.52)Bridge over U.S.20 Phase Cost Status Final Engineering Design $12.7 million Ongoing Property Acquisition $15.5 million Completed, August 2016 North Cascade Road Reconstruction $3.7 million Completed, November 2014 English Mill Road Reconstruction $3.9 million Projected completion, Spring 2017 Military Road Reconstruction $7.4 million Bid in October 2016, construction in 2017 Utility Relocations $3.2 million Ongoing U.S. 61/151 Interchange Box Culvert $1.2 million Completed, May 2016 Menard's Frontage Road Project $8.8 million Under construction U.S. 20 Interchange Grading Project $6.4 million Under construction West Grading Project (English Mill Rd. to Catfish $8.8 million Under construction Creek) East Grading Project (Catfish Creek to U.S. 61/151) $14.3 million Bid in January 2017 Southwest Arterial(U.S. 52) Bridges & Structures $42.4 million 2017-2019 Southwest Arterial(U.S. 52) 2-Lane Paving $30.7 million 2018-2019 Total for Paving 2-Lane & Grading 4-Lane $159 million 2019 Remaining 4-Lane Paving & N. Cascade Rd. / English Mill Rd. Interchange $30 million Based on availability of future funding Completed 4-Lane Freeway Total $189 million TBA COSTS & FUNDING The estimated total cost for the four lane highway grading,construction of the bridges and interchanges,and the paving of a two-lane highway from U.S.61/151 to U.S.20 is$159 million. The Iowa Department of Transportation (DOT) has committed$115 million toward the construction of a preliminary two-lane highway. This phase is under construction and is scheduled to be completed and open for traffic in 2019. The City of Dubuque has acquired $32.9 million in federal funds and will contribute an additional$7.9 million in local funds,along with $3.6 Funding Sources from Dubuque Countytocomplete the preliminary two-lane highway. The remaining four lane paving will be constructed when the Iowa DOT can Iowa DOT (Fiscal Years 2015-19) $115 million budget forthe additional funding. City- Federal Funds $32.9 million City- Local Funds $7.9 million Dubuque County $3.6 million Total $159.4 million p English Mill Road Bridge - Est. Co •:- • • - • Spring 2017 _ w Memorandum of Understanding between the State of Iowa and the City of Dubuque Once the four-lane Southwest Arterial(U.S. 52) is completed and open to traffic, the Iowa DOT and City of Dubuque, in joint cooperation, will transfer the jurisdiction of the Southwest Arterial(U.S. 52) from the City to the State of Iowa in exchange for the Transfer of Jurisdiction of the Northwest Arterial(lowa 32), and portions of existing U.S. 52/Iowa 3 from the Iowa 32/John Deere Road intersection to the intersection of U.S. 61 in downtown Dubuque, from the State to the City. As agreed to per the Memorandum of Understanding, the Benefits of Redesignation & City will continue as the lead agency and is responsible for completing the Final Design, Property Acquisition, Utility Jurisdiction Transfer: Relocations and for completing construction of the English Mill Removes thousands of cars per day from Kelly Lane, Road Reconstruction, the North Cascade Road Reconstruction, Cedar Cross Road, and Rockdale Road and the Military Road Reconstruction projects. • Removes thousands of trucks per day from U.S. 20, The Iowa DOT will then take over as lead agency for construction White Street,and Central Avenue by re-routing truck and completion of the Southwest Arterial (U.S. 52). traffic on to Southwest Arterial(U.S.52),Northwest Arterial, and U.S. 151/61 N5 US 52 Redesignation Connects Dubuque's Industrial Park(Industrial ACenter and Industrial Center West)and Technology LUXEMBURG No (ROSS DESIGNATED IOWA Park,currently home to 48 businesses and 3,500 jobs 3 RICK SVILLE S LOCAL ROAD . Provides a safer, more efficient freight corridor SAGEVILLE 36DURANGO 3 between Luxemburg and Dubuque NLWVIE LOCAL ROAD Removes downtown Dubuque from the freight route $2 ASBURY 61 BANKSTON _ DUBUQUE 151 • Designated freight corridorthrough the region GRAF 2 2 • RSVILLE fNTRAIIA Takes Iowa DOT out of local street business ( 2 FARLE EPWORTH STA 5 2 52 13fi 11111 DESIGNATED US 52 IOWA DOT PRIORITY CORRIDOR WORTHINGTON 151 61 THE CITY OF Cit of Dubuque Engineering Department 1563.589.4270 DVB E WWW.CITYOFDUBUQUE.ORG/SOUTHWESTARTERIAL Masterpiece on the Mississippi