Key West Drive Watermain Extension Project Acceptance Copyright 2014 City of Dubuque Consent Items # 9. ITEM TITLE: Key West Drive Watermain Extension Project Acceptance SUMMARY: City Manager recommending acceptance of the public improvement construction contract for the Key West Drive Water Main Extension Project, as completed by Top Grade Excavating, Inc. RESOLUTION Accepting the Key West Drive Water Main Extension Project and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type Key West Drive Water Main EAension Project-MVM City Manager Memo Memo Staff Memo Staff Memo Acceptance Resolution Resolutions THE CM OF Dubuque AAA-A m c DUB E 11 1r Masterpiece on the Mississippi -2012I rP PP �oo� .zo13 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Key West Drive Water Main Extension Project CI P 7402594 — Southwest Arterial CI P 3002614 —Asbury Road West City Asbury CIP 3002482 —Asbury Road Grinding Cl P 3002694 — Key West Drive Reconstruction DATE: November 1, 2016 City Engineer Gus Psihoyos is recommending acceptance of the public improvement construction contract for the Key West Drive Water Main Extension Project, as completed by Top Grade Excavating, Inc., in the final contract amount of$689,730.15, which is a 19.5% decrease from the original contract amount of $856,909.33. The decrease was due to not needing to use a special waste disposal bid item in the amount of $60,000 and reduced quantities on special backfill ($32,400 savings). Also, there were several fitting that were not used that were originally estimated ($44,637 savings), and various other bid items. I concur with the recommendation and respectfully request Mayor and City Council approval. 4114-14�1 Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DUB E >��C� ` 1111.f Masterpiece on the Mississippi 2007•2032•2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 7, 2016 SUBJECT: Key West Drive Water Main Extension Project CIP 7402594 — Southwest Arterial CIP 3002614 —Asbury Road West City Asbury CIP 3002482 —Asbury Road Grinding CIP 3002694 — Key West Drive Reconstruction INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the Key West Drive Water Main Extension Project. BACKGROUND The City coordinated with Dubuque County's reconstruction of Key West Drive to have water main extended to Military Road from Maquoketa Drive. The County's scope of the project was to reconstruct Key West Drive from Kremer Park Drive to US 151/61. The City's portion of the project was the installation of watermain and associated private services from Maquoketa Drive to Military Road. Additionally, the City resurfaced Key West Drive from Maquoketa Drive to Kremer Park Drive, which is within the city limits. The project coordination with the County presented an opportunity to partner with them; as the road was under construction, a City water main could be constructed from Maquoketa Drive to Military Road along the same corridor which will service both the Twin Ridge Water System and the Southwest Arterial. The City and Dubuque County approved a 28E agreement for the project on April 11, 2016. DISCUSSION The Key West Drive Water Main Extension Project was completed by Top Grade Excavating, Inc., of Farley, Iowa, in the final contract amount of $689,730.15 which is a 19.5 % decrease from the original contract amount of $856,909.33. The decrease was due to not needing to use a special waste disposal bid item in the amount of $60,000 and reduced quantities on special backfill ($32,400 savings). Also, there were several fitting that were not used that were originally estimated ($44,637 savings), and various other bid items. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $689,730.15 to Top Grade Excavating, Inc., for the Key West Drive Water Main Extension Project. BUDGET IMPACT The summary of project costs for the Key West Drive Water Main Extension, is as follows: Award Final Construction Contract $856,909.33 $689,730.15 Construction Engineering & Inspection (5%) 34,486.51 30,231.23 Total Project Cost $891.395.84 $719,961.38 The funding for the Key West Drive Water Main Extension Project will be as follows: CIP No. Fund Description Fund Amount 3002614 Asbury Road West City Asbury $23,271.12 3002482 Asbury Road Grinding $44,730.15 7402594 FY 16 & FY 17 Southwest Arterial 613,582.85 3002694 Key West Dr. Reconstruct 38,377.27 Total Project Funding $719.961.38 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $689,730.15 to Top Grade Excavating, Inc., for the Key West Drive Water Main Extension Project. cc: Jenny Larson, Budget Director John Klostermann, Public Works Director Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer Jon Dienst, Civil Engineer II Greg J. Doeden, Civil Engineer RESOLUTION NO. 368-16 ACCEPTING THE KEY WEST DRIVE WATER MAIN EXTENSION PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Key West Drive Water Main Extension (the Project) has been completed by the Contractor, Top Grade Excavating, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $689,730.15; WHEREAS, the Contractor has previously been paid $655,243.64, leaving a balance of $34,486.51; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $34,486.51 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 7th day of November,, 016. Attest: Kevin S. Firnstahl, CO____Pity Clerk Roy D. %I, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE KEY WEST DRIVE WATER MAIN EXTENSION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Key West Drive Water Main Extension Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $719,961.38. Dated this day of Ove -4' , 2016. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the/V day of kr vin S. Firnstahl, CMC, City Clerk