IDOT Transfer of Jurisdiction Agreement_US 52, IA 3, IA 32 Copyright 2014
City of Dubuque Action Items # 7.
ITEM TITLE: I DOT Transfer of Jurisdiction Agreement
SUMMARY: City Manager recommending approval for the Mayor to
execute the Transfer of Public Road Jurisdiction
Agreement between the City of Dubuque and the Iowa
Department of Transportation for public road segments of
US 52/Iowa 3 and Iowa 32 (Northwest Arterial) that are
within the City's corporate limits.
RESOLUTION Approving the Transfer of Public Road
Jurisdiction Agreement between the City of Dubuque and
Iowa Department of Transportation
SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt
Resolution(s)
ATTACHMENTS:
Description Type
Southwest Arterial Transfer of Jurisdiction-MVM Memo City Manager Memo
Staff Memo Staff Memo
Resolution Resolutions
SW Arterial Iowa DOT TOJ Agreement Supporting Documentation
SW Arterial Iowa DOTTOJ Agreement ExihibitA Supporting Documentation
THE CITY OF Dubuque
DUB E i"
Masterpiece on the Mississippi 2007.2012.2013
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Southwest Arterial Project
Iowa Department of Transportation Transfer of Jurisdiction Agreement
Iowa DOT Project No. TJ-052-2 (133)-2M-31
Iowa DOT Project No. TJ-052-2 (33)-2M-31
Iowa DOT Project No. TJ-052-2 (135)-2M-31
Iowa DOT Agreement No. 2014-TJ-008
DATE: November 1, 2016
Assistant City Engineer Bob Schiesl recommends City Council approval for the Mayor to
execute the Transfer of Public Road Jurisdiction Agreement between the City of
Dubuque and the Iowa Department of Transportation.
A significant accomplishment for the continued development and advancement of the
Southwest Arterial project was the execution of the Memorandum of Understanding
(MOU) on August 9, 2013, between the Iowa DOT and the City. This historic
achievement would not have occurred without the collaborative partnership between the
Iowa DOT staff, the City and its partners, including Dubuque County and the City of
Sageville.
Without the collaborative partnership and funding of the Iowa DOT, the completion of
the Southwest Arterial would not be possible. The Iowa DOT has programmed $115
million to allow for the completion of grading for 4-lanes, paving 2-lanes, including
bridges and interchanges at both U.S. 20 and at U.S. 61/151.
The following is a brief summary of the overall intent and principle objectives as set forth
when developing the MOU and the TOJ Agreements:
• The Iowa DOT proposes to re-route a portion of U.S. 52 in Dubuque County; and
• The City is developing the Southwest Arterial which will connect U.S. 20 to U.S
61/151; and
• The Iowa DOT proposes to utilize the Southwest Arterial to carry a portion of the
re-routed U.S. 52 traffic; and
• The Iowa DOT and City, in joint cooperation propose to transfer the jurisdiction of
the Southwest Arterial from the City to the State of Iowa in exchange for the
Transfer of Jurisdiction of the Northwest Arterial (Iowa 32), and portions of existing
U.S. 52/Iowa 3 from the Iowa 32/John Deere Road intersection to the intersection
of U.S. 61 in downtown Dubuque, from the State to the City, after the Southwest
Arterial is completed and open to traffic.
In 1989, the City and Dubuque County agreed to indemnify and hold the City of
Sageville harmless with respect to the construction of the Northwest Arterial Project
from John F. Kennedy Road to U.S. Highway 52/U.S. Highway 3, for the short roadway
segment of the Northwest Arterial located within the City of Sageville corporate limits.
In order to facilitate the Transfer of Public Road Jurisdiction, the City of Sageville has
executed their TOJ Agreement for the short roadway segment of the Northwest Arterial
located within the Sageville corporate limits. Additionally, the City and Dubuque County
executed a Supplemental Agreement with Sageville on August 1 , 2016, which reaffirms
the indemnification and hold harmless obligations as set forth in the original 1989
Agreement.
The transfer of jurisdiction of the public road segment(s) described in this Agreement
shall take place following the execution of this agreement by both the LPA and the
STATE and once the Southwest Arterial is open to traffic.
Upon completion of the Southwest Arterial and re-routing a portion of U.S. 52 in
Dubuque County, this will remove hundreds of commercial vehicles per day through the
City's downtown urban core (Central Avenue and White Street) by re-routing truck traffic
onto the Southwest Arterial. Additionally, the Southwest Arterial will connect U.S. 20 to
U.S 61/151 , creating an alternate, direct and efficient route for traffic through
southwestern Dubuque which will decrease commercial vehicles trips on U.S. 20 by
approximately 6% per day. Significant traffic will be removed from Kelly Lane, Rockdale
Road, Fremont Avenue and Cedar Cross Road.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Mic ael C. Van Milligen'
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Bob Schiesl, Assistant City Engineer
Gus Psihoyos, City Engineer
2
THE CITY OF Dubuque
AII11-America CiI.ty
UB E1
Masterpiece on the Mississippi 2007.2012.2013
TO: Michael C. Van Milligen, City Manager
Gus Psihoyos, City Engineer
FROM: Robert Schiesl, Assistant City Engineer
DATE: October 31, 2016
SUBJECT: Southwest Arterial Project
Iowa Department of Transportation Transfer of Jurisdiction Agreement
Iowa DOT Project No. TJ-052-2 (133)--2M-31
Iowa DOT Project No. TJ-052-2 (33)--2M-31
Iowa DOT Project No. TJ-052-2 (135)--2M-31
Iowa DOT Agreement No. 2014-TJ-008
INTRODUCTION
The purpose of this memo is to request authorization for the Mayor to execute the
Transfer of Public Road Jurisdiction (TOJ) Agreement between the City of Dubuque and
the Iowa Department of Transportation (Iowa DOT) through the adoption of the enclosed
resolution.
BACKGROUND
A significant accomplishment for the continued development and advancement of the
Southwest Arterial project was the execution of the Memorandum of Understanding
(MOU) on August 9, 2013, between the Iowa DOT and the City. This historic achievement
would not have occurred without the collaborative partnership between the Iowa DOT
staff, the City and its partners, including Dubuque County and the City of Sageville.
The following is a brief summary of the overall intent and principle objectives as set forth
when developing the MOU and the TOJ Agreements:
• The Iowa DOT proposes to re-route a portion of U.S. 52 in Dubuque County; and
• The City is developing the Southwest Arterial which will connect U.S. 20 to U.S
61/151; and
• The Iowa DOT proposes to utilize the Southwest Arterial to carry a portion of the re-
routed U.S. 52 traffic; and
• The Iowa DOT and City, in joint cooperation propose to transfer the jurisdiction of
the Southwest Arterial from the City to the State of Iowa in exchange for the Transfer
of Jurisdiction of the Northwest Arterial (Iowa 32), and portions of existing U.S.
52/Iowa 3 from the Iowa 32/John Deere Road intersection to the intersection of U.S.
61 in downtown Dubuque, from the State to the City, after the Southwest Arterial is
completed and open to traffic.
1
In 1989, the City and Dubuque County agreed to indemnify and hold the City of Sageville
harmless with respect to the construction of the Northwest Arterial Project from John F.
Kennedy Road to U.S. Highway 52/U.S. Highway 3, for the short roadway segment of the
Northwest Arterial located within the City of Sageville corporate limits.
DISCUSSION
In accordance with the provisions of Iowa Code Sections 313.2 and / or 306.42 and the
MOU, attached is a copy of the TOJ Agreement between the City and the Iowa DOT. This
TOJ Agreement details the transfer of jurisdiction for the following public road segment(s),
including all structures and right-of-way, to each other as described as follows and shown
on the attached Exhibit A:
• That portion of US 52/Iowa 3 north from the intersection of US 61 in downtown
Dubuque to the northern corporation limits of Dubuque, of approximately 3.91 miles.
• All portions of Iowa 32 (Northwest Arterial) that are within the corporation limits of
Dubuque, of approximately 4.43 miles.
In order to facilitate the Transfer of Public Road Jurisdiction, the City of Sageville has
executed their TOJ Agreement for the short roadway segment of the Northwest Arterial
located within the Sageville corporate limits. Additionally, the City and Dubuque County
executed a Supplemental Agreement with Sageville on August 1 , 2016, which reaffirms
the indemnification and hold harmless obligations as set forth in the original 1989
Agreement.
The transfer of jurisdiction of the public road segment(s) described in this Agreement
shall take place following the execution of this agreement by both the LPA and the
STATE and once the Southwest Arterial is open to traffic as follows:
• The Iowa DOT, at its cost, shall perform any routine maintenance or determine the
extent and cost of any needed repairs necessary to bring the portions of U.S. 52 and
Iowa 32 to be transferred to the City up to a state of good repair. Alternately, funds
may be transferred from the Iowa DOT to the City in lieu of performing routine
maintenance or making repairs.
• The City shall assume jurisdiction of the public road segment(s) described in this
Agreement upon the completion of the routine maintenance and/or repairs, or
transfer of funds to the City specified in this Agreement.
• The City shall, in accordance with the MOU, complete final design engineering,
construction contract documents, right of way property acquisition, utility relocation,
and construction of City lead projects for the Southwest Arterial.
• The City shall assume jurisdiction of the following bridge(s): FHWA No.(s) 503675,
601940, 607775, and 607770 and the continued maintenance, rehabilitation and
eventual replacement of the bridge.
• The Iowa DOT shall, in accordance with the MOU, completely fund and construct the
Iowa DOT lead projects for the complete 4-lane freeway, including interchanges
between U.S. 20 to U.S. 61/151 .
2
LOCAL BENEFITS
Upon completion of the Southwest Arterial and re-routing a portion of U.S. 52 in Dubuque
County, this will remove hundreds of commercial vehicles per day through the City's
downtown urban core (Central Avenue and White Street) by re-routing truck traffic onto
the Southwest Arterial. Additionally, the Southwest Arterial will connect U.S. 20 to U.S
61/151 , creating an alternate, direct and efficient route for traffic through southwestern
Dubuque which will decrease commercial vehicles trips on U.S. 20 by approximately 6%
per day.
Without the collaborative partnership and funding of the Iowa DOT, the completion of the
Southwest Arterial would not be possible. The Iowa DOT has programmed $115 Million to
allow for the completion of grading for 4-lanes, paving 2-lanes, including bridges and
interchanges at both U.S. 20 and at U.S 61/151 . Funding allocated to the project is
summarized as follows:
Funding Source Amount
City - Federal Funds $ 32.9
City - Local Funds $ 7.9
Dubuque County $ 3.6
Iowa DOT (FY15— 19) $ 115.0
Total $ 159.4
REQUESTED ACTION
The City Council is requested to adopt the resolution and authorize the Mayor to execute
the Transfer of Public Road Jurisdiction (Agreement 2014-TJ-008) between the City of
Dubuque and the Iowa Department of Transportation.
Prepared by Robert Schiesl, Assistant City Engineer
cc: John Klostermann, Public Works Director
Teri Goodmann, Assistant City Manager
Jim Schnoebelen, District 6 Engineer, Iowa DOT
Dubuque County Board of Supervisors
Anthony Bardgett, Dubuque County Engineer
Chandra Ravada, ECIA
3
RESOLUTION NO. 386-16
RESOLUTION APPROVING THE TRANSFER OF PUBLIC ROAD JURISDICTION
AGREEMENT BETWEEN THE CITY OF DUBUQUE AND IOWA DEPARTMENT OF
TRANSPORTATION
WHEREAS, the Dubuque City Council, the Dubuque County Board of
Supervisors, the Dubuque Metropolitan Area Transportation Study (DMATS), the
Dubuque Area Chamber of Commerce and the Greater Dubuque Development
Corporation have all identified the completion of the Southwest Arterial Project as the
No. 1 surface transportation priority in the Dubuque area; and
WHEREAS, the City of Dubuque (City) and Iowa Department of Transportation
(Iowa DOT) desire to maintain and increase transportation infrastructure while
improving safety for the motorist within the City of Dubuque and Dubuque County and
acknowledge the mutual benefit to partner on the Southwest Arterial Project; and
WHEREAS, the City and the Iowa DOT executed a Memorandum of
Understanding (MOU) for the completion of the Southwest Arterial project; and
WHEREAS, the Iowa DOT and City, in joint cooperation propose to Transfer the
Jurisdiction of the Southwest Arterial from the City to the Iowa DOT in exchange for the
Transfer of Jurisdiction of the Northwest Arterial (Iowa 32), and portions of existing U.S.
52/Iowa 3 from the Iowa 32/John Deere Road intersection to the intersection of U.S. 61
in downtown Dubuque, from the State to the City, after the Southwest Arterial is
completed and open to traffic; and
WHEREAS, in accordance with the provisions of Iowa Code Sections 313.2 and /
or 306.42 and the MOU, the Transfer of Public Road Jurisdiction (TOJ) Agreement
between the City and the Iowa DOT details the transfer of jurisdiction for the following
public road segment(s), including all structures and right-of-way, to each other as
described as follows:
• That portion of US 52/Iowa 3 north from the intersection of US 61 in downtown
Dubuque to the northern corporation limits of Dubuque, of approximately 3.91
miles.
• All portions of Iowa 32 (Northwest Arterial) that are within the corporation limits of
Dubuque, of approximately 4.43 miles; and
WHEREAS, the transfer of jurisdiction of the public road segment(s) described in
this Agreement shall take place following the execution of this agreement by both the
LPA and the STATE and once the Southwest Arterial is open to traffic as follows:
• The Iowa DOT, at its cost, shall perform any routine maintenance or determine
the extent and cost of any needed repairs necessary to bring the portions of U.S.
52 and Iowa 32 to be transferred to the City up to a state of good repair.
Alternately, funds may be transferred from the Iowa DOT to the City in lieu of
performing routine maintenance or making repairs.
• The City shall assume jurisdiction of the public road segment(s) described in this
Agreement upon the completion of the routine maintenance and/or repairs, or
transfer of funds to the City specified in this Agreement.
• The City shall, in accordance with the MOU, complete final design engineering,
construction contract documents, right of way property acquisition, utility
relocation, and construction of City lead projects for the Southwest Arterial.
• The City shall assume jurisdiction of the following bridge(s): FHWA No.(s)
503675, 601940, 607775, and 607770 and the continued maintenance,
rehabilitation and eventual replacement of the bridge.
• The Iowa DOT shall, in accordance with the MOU, completely fund and construct
the Iowa DOT lead projects for the complete 4 -lane freeway, including
interchanges between U.S. 20 to U.S 61/151.
NOW, THEREFORE, IT IS AGREED BY AND BETWEEN THE PARTIES AS
FOLLOWS:
SECTION 1. City of Dubuque and the Iowa Department of Transportation hereby
agree to partner on the Southwest Arterial Project.
SECTION 2. Whereas, the Iowa DOT and City, in joint cooperation propose to
Transfer the Jurisdiction of the Southwest Arterial from the City to the Iowa DOT in
exchange for the Transfer of Jurisdiction of the Northwest Arterial (Iowa 32), and
portions of existing U.S. 52/Iowa 3 from the Iowa 32/John Deere Road intersection to
the intersection of U.S. 61 in downtown Dubuque, from the State to the City, after the
Southwest Arterial is completed and open to traffic.
SECTION 3. The Mayor is hereby authorized to execute the Transfer of Public Road
Jurisdiction Agreement between the City of Dubuque and the Iowa Department of
Transportation which will allow for the Transfer the Jurisdiction of the Southwest Arterial
from the City to the Iowa DOT in exchange for the Transfer of Jurisdiction of the
Northwest Arterial (Iowa 32), and portions of existing U.S. 52/Iowa 3 from the Iowa
32/John Deere Road intersection to the intersection of U.S. 61 in downtown Dubuque,
from the State to the City, after the Southwest Arterial is completed and open to traffic.
Passed, approved and adopted this 7th day of November, 201
Attest:
Kevin - Firnstahl, ity erk
F:\PROJECTS\SOUTHWEST ARTERIAL\Transfer of Jurisdiction - MOU
oy D. Buol, Mayor
1)C)7r
SMARTER I SIMPLER I CUSTOMER DRIVEN F-MMMIN.
www.iowadot.gov
District 6 office I Highway Division
5455 Kirkwood Blvd.SW,Cedar Rapids, IA 52404
Phone:(319)364-0235 Fax(319) 364-9614 ( Email:jim.schnoebelen@dot.iowa.gov
October 6, 2016 REF: TJ-052-2(133)--2M-31
TJ-032-1(33)--2M-31
TJ-052-2(135)--2M-31
Dubuque County
City of Dubuque
Agreement#: 2014-TJ-008
Commission order No.
The Honorable Roy D. Buol
Mayor - City of Dubuque
C itv Hall 50 West 13'h St.
Dubuque, IA 52001
SUBJECT: Agreement 2014-TJ-008 FINAL (Transfer jurisdiction of public road segment(s),
including structures and right-of-way to the LPA)
Dear Mayor Buol:
Attached are two (2) copies of an agreement between the city of Dubuque, Dubuque County
and the Iowa Department of Transportation for the above referenced project. The project
involves the transfer jurisdiction of public road segment(s), including structures and right-of-
way to the LPA.
Please secure the necessary approvals and signatures of the appropriate city of Dubuque
officials and return both signed copies of the agreement to this office for further processing.
An original of the fully executed agreement will be forwarded to the city of Dubuque after
final signature by our department. If you have any questions concerning this agreement, please
contact me at the above listed phone number.
Sincerely,
w
James. R. Schnoebelen, P. E.1 . 3
District 6 Engineer .,°.-.
JRS1hmb
Enclosures 2 2014-TJ-008 ,
^--' 1
i
} w,-
(D
£IOWADOT
SMARTER 1 SIMiPLEP, I CUSTOMER DRIVEN
January 27, 2017
www.iowadot.gov
District 6 Office 1 Highway Division
5455 Kirkwood Blvd. SW, Cedar Rapids, IA 52404
Phone: (319) 364-0235 1 Fax (319) 364-9614 1 Email: jim.schnoebelen@dot.iowa.gov
The Honorable Roy D. Buol
Mayor - City of Dubuque
City Hall - 50 West 13th St.
Dubuque, IA 52001
REF: TJ -052-2(133)--2M-31
TJ -032-1(33)--2M-31
TJ -052-2(135)--2M-31
Dubuque County
City of Dubuque
Agreement #: 2014 -TJ -008
Commission Order No. H-2017-21
SUBJECT: Agreement 2014 -TJ -008 FULLY EXECUTED (Transfer jurisdiction of public
road segment(s), including structures and right-of-way to the LPA)
Dear Mayor Buol:
Attached is your original of the fully executed Agreement 2014 -TJ -008 between the city of
Dubuque and the Iowa Department of Transportation for the above referenced project. The
project involves: Transfer jurisdiction of public road segment(s), including structures and
right-of-way to the LPA.
Thank you for your cooperation in the processing of this agreement.
Sincerely,
pott4R.Scleaa".....
James. R. Schnoebelen, P. E.
District 6 Engineer
JRS/hmb
Enclosure: 2014 -TJ -008
Cc: Deanne Popp, Local Systems - Ames
Daryl Hart, Finance - Ames
August 2013
IOWA DEPARTMENT OF TRANSPORTATION
Agreement for
Transfer of Public Road Jurisdiction
County Dubuque
City Dubuque
Project No. TJ -052-2(133)-2M-31
TJ -032-1(33)--2M-31
TJ -052-2(135)--2M-31
Iowa DOT
Agreement No. 2014 -TJ -008
Commission Order No. H-2017-21
This Agreement entered into by and between the Iowa Department of Transportation, hereinafter
designated the "STATE", and the City of Dubuque, Iowa, a Local Public Agency, hereinafter designated
the "LPA"; and in consideration of these premises and the mutual covenants hereinafter set forth; and
The DOT and the LPA previously entered into Agreement No. 94 -TJ -003 for the co -jurisdiction of the
Northwest Arterial executed by the DOT and LPA on September 20, 1995 and February 6, 1995
respectively; and
The DOT and the LPA previously entered into a Memorandum of Understanding (MOU), Agreement No.
2013-16-262, involving jurisdictional transfers of road and road segments executed on August 9, 2013.
Therefore, it is hereby agreed as follows:
WITNESSETH, that
1. The LPA and the STATE propose to construct a new Southwest Arterial connecting to U.S. 20 on the
west and U.S. 61/151 on the east.
2. In accordance with the provisions of Iowa Code Sections 313.2 and / or 306.42 and the MOU, the
STATE, contingent upon Iowa Highway Commission approval agrees to transfer jurisdiction of the
following public road segment(s), including all structures and right-of-way, to the LPA:
That portion of U.S. 52/lowa 3 north from the intersection of U.S. 61 in downtown Dubuque
to the northern corporation limits of Dubuque, a length of approximately 3.91 miles
(including the one-way pairs), as shown on Exhibit A attached.
All portions of Iowa 32 (Northwest Arterial) that are within the corporation limits of
Dubuque, a length of approximately 4.43 miles, as shown on Exhibit A attached.
a. The LPA agrees to accept the road segment(s) described in this Agreement into their road
system and maintain them in accordance with all applicable Taws, regulations and administrative
rules.
b. This transfer includes the following bridge(s): FHWA No.(s) 503675, 601940, 607775, and
607770. When this transfer becomes effective, the LPA shall be responsible for inspecting the
bridge(s) in accordance with the National Bridge Inspection Standards (NBIS) and also for the
continued maintenance, rehabilitation and eventual replacement of the bridge.
c. The LPA and the STATE have examined the physical condition of the public road segment(s)
described in this Agreement and have agreed that:
2014 -TJ -008 Dubuque_ 09302016 1
August 2013
i. The STATE, at its cost, shall perform any routine maintenance or determine the extent and
cost of any needed repairs necessary to bring the portions of U.S. 52 and Iowa 32 to be
transferred to the LPA up to a good state of repair. Funds may be transferred from the STATE
to the LPA in lieu of performing routine maintenance or making repairs.
d. The transfer of jurisdiction of the public road segment(s) described in this Agreement shall take
place following the execution of this agreement by both the LPA and the STATE and once the
Southwest Arterial is open to traffic as follows:
The LPA shall assume jurisdiction of the public road segment(s) described in this Agreement
upon the completion of the routine maintenance and/or repairs, or transfer of funds to the
LPA specified in this Agreement, and upon notification to the LPA of the time and date of the
STATE's intention to transfer and after the Southwest Arterial is open to traffic.
ii. The LPA shall, in accordance with the MOU, complete design engineering, construction
contract documents, right of way acquisition, utility relocation, and construction of LPA lead
projects of the Southwest Arterial; and at its cost shall remove or cause to be removed all
utility poles and trees within the clear zone distance from the edge of the pavement, remove
any and all trees from the roadway ditches.
3. The LPA has inspected the public road segment(s) described in this Agreement and agrees to accept
the road segments subject to the conditions set forth herein. In accordance with Iowa Code Section
306.42(6), neither the LPA nor the STATE shall be held liable for any claim for damage for any act or
omission relating to the design, construction, or maintenance of the public road segment(s) described
this Agreement that occurred prior to the effective date of the transfer.
4. The STATE shall transfer to the LPA by quit -claim deed all its legal or equitable title or interest in the
right-of-way, except as noted in Section 4 following, of the public road segment(s) described in this
Agreement. The LPA shall accept said deed, pursuant to Iowa Code Section 306.42.
5. If the STATE has acquired access rights by warranty deed or as agreed to in Agreement 94 -TJ -003
for the U.S. 52 and Iowa 32 public road segment(s) described in this Agreement, the LPA shall not,
within the distances prescribed below, either alter those rights or allow any new access.
• U.S. 20/Iowa 32/Northwest Arterial intersection - for a distance of 1000 feet along the
Northwest Arterial/existing Iowa 32.
• U.S. 61 interchange at 9th Street/11th Street - maintain/preserve existing access rights
• Proposed Southwest Arterial interchanges - access rights will be acquired as part of a future
LPA project and shall be maintained as acquired.
6. Once the transfers of jurisdiction are complete, the LPA shall be responsible for signing the road
segment to be transferred to the LPA. Procedures to modify the secondary route numbering system
are outlined in Instructional Memorandum (IM) 4.01. The LPA shall also be responsible for any
requests to modify the Farm to Market (FM) road system as outlined in IM 4.210 and 4.220.
7. If any section, provision, or part of this Agreement is found to be invalid or unconstitutional, such
finding shall not affect the validity of the Agreement as a whole or any section, provision, or part
thereof not found to be invalid or unconstitutional.
8. This Agreement shall be executed in two counterparts, each of which shall constitute but one and the
same instrument.
9. This Agreement including referenced exhibits, constitutes the entire Agreement between the LPA and
the STATE concerning these transfers of jurisdiction. Representations made before the signing of this
Agreement are not binding, and neither party has relied upon conflicting representations in entering
into this Agreement. Any change or alteration to the terms of this Agreement must be in the form of
2014 -TJ -008 Dubuque_09302016 2
August 2013
an addendum to this Agreement. Said addendum shall become effective only upon written approval
of the STATE and the LPA.
IN WITNESS THEREOF, each of the parties hereto has executed agreement No. 2014 -TJ -008 as of the
date shown opposite its signature hereafter.
CITY OF DUBUQUE:
By:
�l
y
Title: Mayor
Kevin S. Firnstahl
Roy D. Buol
Date November 7 , 2016.
, certify that I am the Clerk of the City, and that
. who signed said Agreement for and on behalf of the City
was duly authorized to execute the same by virtue of a formal motion passed and adopted by the CITY
on the 7th day of N`gvember ,2016
Signed:
City CI -r of Dubuq e,
IOWA DEPARTMENT OF TRANSPORTATION:
By: (2Yrite,-)
Names 'ectIciebelerr
District Engineer
District 6
Date
-42:1lYt
2014 -TJ -008 Dubuque_09302016 3
.20 _
Transfer of Jurisdiction
EXHIBIT A
Iowa DOT to City of Dubuque
It"
(9,
Sources Esn, HERE,
DeLorme USGS, Intermap,
increment P Corp., NRCAN,
f3,tirto.. li.+,ca HERE 10,11(.011w Intormay increment Cop
IIIWAY ro mom MLh, Lri China (1144,44) Kong) Lrtiitut,144.
4ont Nktpnivintim. v.• Opon: V0111111011 rrIM11)11/(oli tlic,
Ct“pmy ply
WE
2014-TJ-008_Dubuque
TOJ SEGMENT OF ROADWAY
IOWA DOT TO CITY OF DUBUQUE