2016 Bridge Repair and Maintenance Project Acceptance Copyright 2014 City of Dubuque Consent Items # 14. ITEM TITLE: 2016 Bridge Repair and Maintenance Project Acceptance SUMMARY: City Manager recommending acceptance of the public improvement construction contract for the 2016 Bridge Repairs and Maintenance Project, as completed by Tschiggfrie Excavating, Co. RESOLUTION Accepting the 2016 Bridge and Maintenance Project and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type 2016 Bridge Repairs and Maintenance Project-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate of Completion Supporting Documentation THE CITY OF Dubuque DUB E i" Masterpiece on the Mississippi 2007.2012.2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2016 Bridge Repairs and Maintenance Project CIP 3001258, FY17, 7401405, 61055400, 7201066 DATE: November 15, 2016 City Engineer Gus Psihoyos is recommending acceptance of the public improvement construction contract for the 2016 Bridge Repairs and Maintenance Project, as completed by Tschiggfrie Excavating, Co., in the final contract amount of $309,118.40, which is a 1.4% increase from the original contract amount of $304,972.81. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DUB E U.AcacNy r � � ► Masterpiece on the Mississippi 2007.2092.2013 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: November 14, 2016 SUBJECT: 2016 Bridge Repairs and Maintenance Project CIO 3001258, FY 17, 7401405, 61055400, 7201066 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the 2016 Bridge Repairs and Maintenance Project. BACKGROUND During the 2015 Bi-Annual Bridge Inspections, it was observed and noted that both the Cedar Cross Road and Old Mill Bridges were experiencing spalled concrete sections on each of their respective bridge decks. As part of the FY14 budget process, additional bridge maintenance funding was approved for these repairs; however work was postponed due to local traffic using these streets as an alternate route while the Iowa DOT was completing the US 61/151 Catfish Creek Bridge improvements during the 2014 - 2015 construction seasons. The City initially solicited bids in 2015 for the bridge repair and maintenance projects on Cedar Cross, Fremont, and Old Mill, however the City Council rejected the single bid proposal received due to a lack of competitive bids and insufficient funding to proceed with the construction improvements as proposed. At that meeting it was agreed that the City would re-bid the project in early 2016 with the hope that more contractors will bid on the project and allow for a more favorable bidding environment. Sealed bids were received on the project on March 10, 2016. Four (4) contractors submitted bid proposals. Tschiggfrie Excavating Co. was awarded _the construction contract in the low bid amount of $304,972.81. The 2016 Bridge Repairs and Maintenance Project included five (5) alternate bid items to allow for flexibility to adjust the scope of the project should costs come in higher than anticipated, thus allowing the project to remain within the budgeted funding available. Due to the favorable bid received, the City was able to include and complete all the work associated with the five (5) alternates. The 2016 Bridge Repairs and Maintenance Project, provided for the following improvements: Cedar Cross Road Bridge: • Concrete bridge deck repair to extend the life of the bridge. • Sidewalk settlement repairs and expansion joint maintenance. • Resurface north bridge approach. • Reconstruct south bridge approach. • Repair concrete barrier rail. • Clean and seal bridge deck and sidewalk. Fremont Bridge: • Concrete bridge deck repair to extend the life of the bridge. • Concrete bridge deck joint repair. • Sidewalk settlement repairs. • Reconstruct westerly bridge approach • Clean and seal bridge deck and sidewalk. Old Mill Road Bridge: • Concrete bridge deck repair to extend the life of the bridge. • Sidewalk settlement repairs. • Clean and seal bridge deck and sidewalk. • Utility disconnects - remove eight (8) abandoned water service lines. • Utility disconnects - remove three (3) abandoned sanitary sewer services. DISCUSSION The 2016 Bridge Repairs and Maintenance Project was completed by Tschiggfrie Excavating, Co., of Dubuque, Iowa, in the final contract amount of $309,118.40 which is a 1.4 % increase from the original contract amount of $304,972.81. RECOMMENDATION I recommend that the City Council accept the public improvements and authorize the payment of the contract amount of $309,118.40 to Tschiggfrie Excavating, Co., for the 2016 Bridge Repairs and Maintenance Project. BUDGETIMPACT The summary of project costs for the 2016 Bridge Repairs and Maintenance Project, is as follows: Bid Award Final Cost Base Bid - Construction Contract $ 92,681.25 $ 78,234.65 Alternate 1 -Cedar Cross Bridge- North Approach/ Bridge Deck 27,696.50 31,594.59 Alternate 2- Cedar Cross Bridge-South Approach 45,065.90 90,683.05 Alternate 3- Fremont Bridge-West Approach/Bridge Deck 56,500.45 57,954.58 Alternate 4-Old Mill Road -Water Service Disconnection 58,804.23 29,390.77 Alternate 5- Old Mill Road -San. Sewer Service Disconnect/ 24,224.48 21,260.76 Brid a Deck Contingency 31,460.00 Construction Engineering & Inspection 53,500.00 48,602.20 Total Project Cost $ 389.932.81 $ 357,72 0.60 The funding for the 2016 Bridge Repairs and Maintenance Project will be as follows: CIP No. Fund Description Fund Amount 3001258 Bridge Repair/ Maintenance (FY14, FY15, FY16, FY17) $ 311,229.26 7401405 Water Main Replacement 29,390.77 61055400 General Sanitary Sewer Repair 6,375.27 7201066 General Storm Sewer Repair 10,725.30 Total Project Funding $357,720.60 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $309,118.40 to Tschiggfrie Excavating, Co., for the 2016 Bridge Repairs and Maintenance Project. Prepared by: Bob Schiesl, Assistant City Engineer Greg J. Doeden, Civil Engineer cc: Jenny Larson, Budget Director John Klostermann , Public Works Director Bob Green, Water Department Manager Brant Schueller, Water Department Supervisor RESOLUTION NO. 392-16 ACCEPTING THE 2016 BRIDGE REPAIRS AND MAINTENANCE PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2016 Bridge Repairs and Maintenance (the Project) has been completed by the Contractor, Tschiggfrie Excavating, Co. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $309,118.40; WHEREAS, the Contractor has previously been paid $293,662.48, leaving a balance of $15,455.92; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $15,455.92 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 21st day of November,, '016. Roy D. B .I, Mayor Attest: Kevi S. Firnstah _ ► City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2016 BRIDGE REPAIRS AND MAINTENANCE PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2016 Bridge Repairs and Maintenance Project, and that said Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $357,720.60. i Dated this 0 day of , 2016. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the day of , 2016. fi i� it Kevin . Firnsta I, C , City Clerk I I I i, �1 I