Acceptance of 2016 Delmonaco Drive Drain Tile Project Copyright 2014 City of Dubuque Consent Items # 9. ITEM TITLE: Acceptance 2016 Delmonaco Drive Drain Tile Project SUMMARY: City Manager recommending acceptance of the public improvement construction contract for the 2016 Delmonaco Drive Drain Tile Project, as completed by Key City Excavating, Inc. RESOLUTION Accepting the 2016 Delmonaco Dr. Drain Tile Project and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type 2016 Delmonaco Drive Drain Tile Project-MVM Memo City Manager Memo Staff Memo Staff Memo Acceptance Resolution Resolutions THE CITY OF Dubuque DUB E i" Masterpiece on the Mississippi 2007.2012.2013 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2016 Delmonaco Drive Drain Tile Project CIP 7201354 DATE: December 26, 2016 City Engineer Gus Psihoyos is recommending acceptance of the public improvement construction contract for the 2016 Delmonaco Drive Drain Tile Project, as completed by Key City Excavating, Inc., in the final contract amount of $28,690.50, which is an 8.2% increase from the original contract amount of$26,515.20. The increase was due to additional backfill material, drain tile and curb and gutter replacement. I concur with the recommendation and respectfully request Mayor and City Council approval. ZV4-A�' Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer bLiqUe 'THE CITY OF � L)U DUB E ;UI-AAmaic�aChy � I Masterpiece o-n. the Mississippi 2017.2112-1.011 TO: Michael C. Van Milligen, City Manage l FROM: Gus Pslhoyos, City Engineer DATE: December 27, 2016 SUBJECT: 2016 Delmonaco Drive Drain Tile Project CIP 7201354 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the 2016 Delmonaco Drive Drain Tile Project. BACKGROUND The project involved the installation of drain tile at three (3) different locations along Delmonaco Drive to collect and direct sump pump discharge to nearby storm sewer intakes as well as install perforated drain tile to collect and drain spring water from under the existing road. In accordance with Iowa Code § 384.103 and § 364.12(3)(c), and Iowa Code, Section 26.14, the City solicited informal bids for the 2016 Delmonaco Drive Drain Tile Project. The City received three (3) bids on August 11, 2016 from the following contractors: Contractor Bid Results Key City Excavating, Inc. $ 26,515.20 Connolly Construction, Inc. $ 32,586.94 Temperley Excavating $ 36,397.00 Key City Excavating, Inc. of Dubuque, Iowa, submitted the low bid in the amount of $26,515.20. DISCUSSION The 2016 Delmonaco Drive Drain Tile Project was completed by Key City Excavating, Inc., of Dubuque, Iowa, in the final contract amount of $28,690.50 which is an 8.2% increase from the original contract amount of$26,515.20. The increase was due to additional backfill material, drain the and curb and gutter replacement. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $28,690.50 to Key City Excavating, Inc., for the 2016 Delmonaco Drive Drain Tile Project. BUDGET IMPACT The summary of project costs for the 2016 Delmonaco Drive Drain Tile Project is as follows: Award Final Construction Contract $26,515.20 $28,690.5 Contingency 2,651 .52 Construction Engineering & Inspection 4,375.01_ 1,434.52 Total Project Cost $33,541.73 $30,11MD2 This project funding is as follows: CIP No. Fund Description Fund Amount 7201354 Drain Tile Program $30,125.02 Total Project Funding 30.125.02 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of$28,690.50 to Key City Excavating, for the 2016 Delmonaco Drive Drain Tile Project. Prepared by: Charlie Gau, Engineering Tech cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II Denise Ihrig, Water Department Manager 2 RESOLUTION NO. 3-17 ACCEPTING THE 2016 DELMONACO DR. DRAIN TILE PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2016 Delmonaco Drive Drain Tile Project (the Project) has been completed by the Contractor, Key City Excavating (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $28,690.50; WHEREAS, the Contractor has previously been paid $27,255.97, leaving a balance of $1,434.52; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $1,434.52 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 3rd day of January, Attest: Trish L. Gleason, Assistant City Clerk 9.,Z,,,,, Roy D. diol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2016 DELMONACO DR. DRAIN TILE PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2016 Delmonaco Drive Drain Tile Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is 30,125.02. Dated this 47c day of 12160 , 2016. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the day of Kev dVC, City Clerk